SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
The City of Oklahoma City seeks bids for the Lift Station No. 90 Elimination project involving wastewater pipeline construction, lift station demolition, trenching, manhole installation, pavement repair, and related site restoration services. Mandatory pre-bid conference on 02/20/2026. Bid due 03/04/2026.
Prequalification Requirement is Wastewater Pipeline Contractor C OCWUT SC-1179, Lift Station No. 90 Elimination, SE 89th Street and Eastern Avenue, 2109 SE 89th Terrace **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 02/23/2026 09:00 AM EST **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Water Utilities Trust **Reference Number**: 0000410801 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 02/20/2026 10:00 AM EST | Location: 1 N. Walker Conference Room 124-126, Oklahoma City, Oklahoma 73112 | Event Note: 103.01.03 – MANDATORY PRE-BID CONFERENCE103.01.03.01 When specified in the Notice to Bidder, attendance at the Pre-Bid Conference is a prequalification requirement. If there is a virtual meeting option, the virtual address will be provided in the Notice to Bidders. When the Notice to Bidders specifies that the Pre-Bid Conference is mandatory, the contractor who plans to submit a bid must attend the Mandatory Pre Bid Conference. Failure of the prospective bidders to attend a Mandatory Pre-Bid Conference will cause the bidder’s submission to be rejected. Whenever required, a Mandatory Pre-Bid Conference is a prequalification requirement to bid on the contract. **Line Items**: | Code | Description | UOM | Qty | Modification | |---|---|---|---|---| | Next Project 1 Next BASE BID-BASE BID Code Description UOM Qty Modification 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 Deleted 814 Pavement Cut & Permanent Repair (Concrete) Square Yard 230 Added 109 Erosion Control Lump-Sum 1 Added 818 Remove & Replace Pavement (Asphalt) Square Yard 635 Added | Next BASE BID-BASE BID Code Description UOM Qty Modification 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 Deleted 814 Pavement Cut & Permanent Repair (Concrete) Square Yard 230 Added 109 Erosion Control Lump-Sum 1 Added 818 Remove & Replace Pavement (Asphalt) Square Yard 635 Added | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | Deleted | 814 | Pavement Cut & Permanent Repair (Concrete) | Square Yard | 230 | Added | 109 | Erosion Control | Lump-Sum | 1 | Added | 818 | Remove & Replace Pavement (Asphalt) | Square Yard | 635 | Added | | | | Next BASE BID-BASE BID Code Description UOM Qty Modification 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 Deleted 814 Pavement Cut & Permanent Repair (Concrete) Square Yard 230 Added 109 Erosion Control Lump-Sum 1 Added 818 Remove & Replace Pavement (Asphalt) Square Yard 635 Added | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | Deleted | 814 | Pavement Cut & Permanent Repair (Concrete) | Square Yard | 230 | Added | 109 | Erosion Control | Lump-Sum | 1 | Added | 818 | Remove & Replace Pavement (Asphalt) | Square Yard | 635 | Added | | | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | Deleted | | 814 | Pavement Cut & Permanent Repair (Concrete) | Square Yard | 230 | Added | | 109 | Erosion Control | Lump-Sum | 1 | Added | | 818 | Remove & Replace Pavement (Asphalt) | Square Yard | 635 | Added | **Line Items**: | Code | Description | UOM | Qty | Modification | |---|---|---|---|---| | Next BASE BID-BASE BID Code Description UOM Qty Modification 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 Deleted 814 Pavement Cut & Permanent Repair (Concrete) Square Yard 230 Added 109 Erosion Control Lump-Sum 1 Added 818 Remove & Replace Pavement (Asphalt) Square Yard 635 Added | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | Deleted | 814 | Pavement Cut & Permanent Repair (Concrete) | Square Yard | 230 | Added | 109 | Erosion Control | Lump-Sum | 1 | Added | 818 | Remove & Replace Pavement (Asphalt) | Square Yard | 635 | Added | | | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | Deleted | | 814 | Pavement Cut & Permanent Repair (Concrete) | Square Yard | 230 | Added | | 109 | Erosion Control | Lump-Sum | 1 | Added | | 818 | Remove & Replace Pavement (Asphalt) | Square Yard | 635 | Added | **Line Items**: | Code | Description | UOM | Qty | Modification | |---|---|---|---|---| | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | Deleted | | 814 | Pavement Cut & Permanent Repair (Concrete) | Square Yard | 230 | Added | | 109 | Erosion Control | Lump-Sum | 1 | Added | | 818 | Remove & Replace Pavement (Asphalt) | Square Yard | 635 | Added | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next BASE BID-BASE BID Code Description UOM Qty 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | Next BASE BID-BASE BID Code Description UOM Qty 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | Code Description UOM Qty | 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | 809 | MOBILAZTION | Lump-Sum | 1 | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | 616 | MANHOLE 0-6' DEEP | Each | 5 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | 811 | LIFT STATION DEMO | Lump-Sum | 1 | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | 985 | SOLID SLAB SODDING | Square Yard | 3000 | 615 | LEAKAGE TEST | Lump-Sum | 1 | 616 | MANHOLE TEST | Lump-Sum | 1 | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | SP | GPS ASBUILTS | Lump-Sum | 1 | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | | | | Next BASE BID-BASE BID Code Description UOM Qty 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | Code Description UOM Qty | 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | 809 | MOBILAZTION | Lump-Sum | 1 | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | 616 | MANHOLE 0-6' DEEP | Each | 5 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | 811 | LIFT STATION DEMO | Lump-Sum | 1 | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | 985 | SOLID SLAB SODDING | Square Yard | 3000 | 615 | LEAKAGE TEST | Lump-Sum | 1 | 616 | MANHOLE TEST | Lump-Sum | 1 | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | SP | GPS ASBUILTS | Lump-Sum | 1 | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | | | Code Description UOM Qty | | 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | 809 | MOBILAZTION | Lump-Sum | 1 | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | 616 | MANHOLE 0-6' DEEP | Each | 5 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | 811 | LIFT STATION DEMO | Lump-Sum | 1 | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | 985 | SOLID SLAB SODDING | Square Yard | 3000 | 615 | LEAKAGE TEST | Lump-Sum | 1 | 616 | MANHOLE TEST | Lump-Sum | 1 | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | SP | GPS ASBUILTS | Lump-Sum | 1 | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | | | 809 | MOBILAZTION | Lump-Sum | 1 | | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | | 616 | MANHOLE 0-6' DEEP | Each | 5 | | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | | 811 | LIFT STATION DEMO | Lump-Sum | 1 | | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | | 985 | SOLID SLAB SODDING | Square Yard | 3000 | | 615 | LEAKAGE TEST | Lump-Sum | 1 | | 616 | MANHOLE TEST | Lump-Sum | 1 | | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | | SP | GPS ASBUILTS | Lump-Sum | 1 | | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next BASE BID-BASE BID Code Description UOM Qty 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | Code Description UOM Qty | 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | 809 | MOBILAZTION | Lump-Sum | 1 | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | 616 | MANHOLE 0-6' DEEP | Each | 5 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | 811 | LIFT STATION DEMO | Lump-Sum | 1 | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | 985 | SOLID SLAB SODDING | Square Yard | 3000 | 615 | LEAKAGE TEST | Lump-Sum | 1 | 616 | MANHOLE TEST | Lump-Sum | 1 | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | SP | GPS ASBUILTS | Lump-Sum | 1 | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | | | Code Description UOM Qty | | 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | 809 | MOBILAZTION | Lump-Sum | 1 | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | 616 | MANHOLE 0-6' DEEP | Each | 5 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | 811 | LIFT STATION DEMO | Lump-Sum | 1 | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | 985 | SOLID SLAB SODDING | Square Yard | 3000 | 615 | LEAKAGE TEST | Lump-Sum | 1 | 616 | MANHOLE TEST | Lump-Sum | 1 | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | SP | GPS ASBUILTS | Lump-Sum | 1 | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | | | 809 | MOBILAZTION | Lump-Sum | 1 | | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | | 616 | MANHOLE 0-6' DEEP | Each | 5 | | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | | 811 | LIFT STATION DEMO | Lump-Sum | 1 | | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | | 985 | SOLID SLAB SODDING | Square Yard | 3000 | | 615 | LEAKAGE TEST | Lump-Sum | 1 | | 616 | MANHOLE TEST | Lump-Sum | 1 | | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | | SP | GPS ASBUILTS | Lump-Sum | 1 | | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 809 MOBILAZTION Lump-Sum 1 601 12" SANITARY SEWER PIPE Linear Foot/Feet 1086 616 MANHOLE 0-6' DEEP Each 5 616 EXTRA DEPTH MANHOLE Vertical Feet 47 212 10'-12' TRENCHING Linear Foot/Feet 136 212 12'-14' TRENCHING Linear Foot/Feet 499 212 14'-16' TRENCHING Linear Foot/Feet 230 212 16'-18' TRENCHING Linear Foot/Feet 219 635 BORE w/ STEEL CASING FOR 12" MAIN Linear Foot/Feet 100 814 PAVEMENT CUT & PERMANENT REPAIR Square Yard 825 923 TYPE "A" BACKFILL Cubic Yard 315 816 REMOVE & REPLACE ADA RAMP Each 1 811 LIFT STATION DEMO Lump-Sum 1 SP FORCE MAIN ABANDONMENT w/ GROUT FILL Linear Foot/Feet 1500 985 SOLID SLAB SODDING Square Yard 3000 615 LEAKAGE TEST Lump-Sum 1 616 MANHOLE TEST Lump-Sum 1 606 POST CCTV VIDEO RECORDING Linear Foot/Feet 1086 801 CONSTRUCTION STAKING Lump-Sum 1 802 TRAFFIC CONTROL Lump-Sum 1 SP GPS ASBUILTS Lump-Sum 1 SP PRE & POST COLOR AUDIO VIDEO RECORDING Lump-Sum 1 | 809 | MOBILAZTION | Lump-Sum | 1 | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | 616 | MANHOLE 0-6' DEEP | Each | 5 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | 811 | LIFT STATION DEMO | Lump-Sum | 1 | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | 985 | SOLID SLAB SODDING | Square Yard | 3000 | 615 | LEAKAGE TEST | Lump-Sum | 1 | 616 | MANHOLE TEST | Lump-Sum | 1 | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | SP | GPS ASBUILTS | Lump-Sum | 1 | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | | | 809 | MOBILAZTION | Lump-Sum | 1 | | 601 | 12" SANITARY SEWER PIPE | Linear Foot/Feet | 1086 | | 616 | MANHOLE 0-6' DEEP | Each | 5 | | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 47 | | 212 | 10'-12' TRENCHING | Linear Foot/Feet | 136 | | 212 | 12'-14' TRENCHING | Linear Foot/Feet | 499 | | 212 | 14'-16' TRENCHING | Linear Foot/Feet | 230 | | 212 | 16'-18' TRENCHING | Linear Foot/Feet | 219 | | 635 | BORE w/ STEEL CASING FOR 12" MAIN | Linear Foot/Feet | 100 | | 814 | PAVEMENT CUT & PERMANENT REPAIR | Square Yard | 825 | | 923 | TYPE "A" BACKFILL | Cubic Yard | 315 | | 816 | REMOVE & REPLACE ADA RAMP | Each | 1 | | 811 | LIFT STATION DEMO | Lump-Sum | 1 | | SP | FORCE MAIN ABANDONMENT w/ GROUT FILL | Linear Foot/Feet | 1500 | | 985 | SOLID SLAB SODDING | Square Yard | 3000 | | 615 | LEAKAGE TEST | Lump-Sum | 1 | | 616 | MANHOLE TEST | Lump-Sum | 1 | | 606 | POST CCTV VIDEO RECORDING | Linear Foot/Feet | 1086 | | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | | 802 | TRAFFIC CONTROL | Lump-Sum | 1 | | SP | GPS ASBUILTS | Lump-Sum | 1 | | SP | PRE & POST COLOR AUDIO VIDEO RECORDING | Lump-Sum | 1 | **Questions and Answers**: - Q1 Arrow Right Question: Paving Quanities Will asphalt and concrete paving be separated out for different quantities? Arrow Right Answer: Yes. Quantities will be separated out for different quantities for asphalt and concrete paving and will be issued per addendum. 02/20/2026 10:45 AM EST 02/20/2026 10:57 AM EST - Q2 Arrow Right Question: Erosion Control Qty Can Erosion Control qty be added to list of pay items. Arrow Right Answer: Yes. Erosion Control qty will be added to list of pay items and will be issued with addendum. 02/20/2026 10:46 AM EST 02/20/2026 10:57 AM EST - Q3 Arrow Right Question: Lift Station Demo How do you want the lot where the lift station to be restored backed to. Arrow Right Answer: Any salvage equipment will be taken by the Wastewater Quality group and the remaining equipment and stuff will be the responsibility of the Contractor to dispose of. Leave driveway in place and take everything out including fence and restore back to a sodded lot. Clarification will be issued per addendum. 02/20/2026 10:49 AM EST 02/20/2026 10:57 AM EST - Q4 Arrow Right Question: Wet Well Demo The plans show sand backfill for the wet well. Can compact soil / dirt be used instead. Arrow Right Answer: Yes. Compacted soil / dirt can be use instead of sand to fill the wet well prior to demo. Clarification will be issued per addendum. 02/20/2026 10:50 AM EST 02/20/2026 10:57 AM EST - Q5 Arrow Right Question: Time Extension Can time be extended for contract time? Arrow Right Answer: Yes. Time of Contract shall be extended to 180 days and will per issued per addendum. 02/20/2026 10:52 AM EST 02/20/2026 10:57 AM EST - Q6 Arrow Right Question: Manhole Lids & Coatings What type of manhole lids are required? What type of coating is required for the manholes? Arrow Right Answer: Standard reversible type manhole lids will work. Composite lids may be used as well. Manholes shall be standard coating 8 mils thick. Clarification will be issued with addendum. 02/20/2026 10:54 AM EST 02/20/2026 10:57 AM EST
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.