Montgomery County MUD No. 8 seeks contractors for rehabilitation of five sanitary sewer lift stations involving cleaning, piping replacement, concrete repair, coating, safety installations, bypass pumping, and site restoration. Pre-bid via Microsoft Teams.
Lift Station No. 1
The work includes but not limited to, blast and recoat the aboveground piping and vent; installation of rigid safety grate system; installation of surge protection device and grounding system including a ground well on the electrical service rack; wire brush and recoat the meter disconnect enclosure; clean and recoat the generator enclosure; installation of supports on the gas line; sod installation to return to existing conditions; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.
Lift Station No. 2
The work includes but not limited to, cleaning and degritting the wet well; removing corroded hardware and sealing penetration; demolition and replacement of pump guide rail and cable holder assemblies; demolition and replacement of ductile iron wet well riser piping, including protective coating; blast and recoat the aboveground piping; installation of rigid safety grate system; demolition and replacement of stainless steel intermediate guide rail brackets; installation of surge protection device and grounding system including a ground well on the electrical service rack; wire brush and recoat the meter and meter disconnect enclosure; clean and recoat the generator enclosure; installation of supports on the gas line; installation of temporary fencing and storm inlet protection; sod installation to return to existing conditions; site restoration; bypass pumping; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.
Lift Station No. 3
The work includes but not limited to, cleaning and degritting the wet well; blast and recoat the wet well walls, floor, underside of the top slab; application of one-inch (1") of concrete repair mortar to all areas of the wet well walls, floors, and underside of top slab; demolition and replacement of the ductile iron wet well riser piping, including protective coating; blast and recoat the valve vault piping, valves, and fittings; demolition and replacement of cable holder assembly; installation of stainless steel intermediate guide rail brackets; installation of surge protection device on the electrical service rack; clean and recoat the generator enclosure; demolition and replacement of the generator flex conduit and coupling; installation of supports on the gas line; installation of temporary fencing; sod installation to return to existing conditions; site restoration; bypass pumping; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.
Lift Station No. 4
The work includes but not limited to, cleaning and degritting the wet well; blast and recoat the wet well walls, floor, underside of the top slab; application of one-inch (1") of concrete repair mortar to all areas of the wet well walls, floors, and underside of top slab; demolition and replacement of the ductile iron wet well riser piping, including application of protective coating; demolition and replacement of pump guide rail, stainless steel intermediate brackets, and cable holder assemblies; installation of rigid safety grate system; blast and recoat the valve vault piping, valves, and fittings; installation of surge protection device on the electrical service rack; wire brush and recoat the meter enclosure; enclose the communication cables; installation of supports on the gas line, demolition and replacement of the three (3) existing wet well terminal box back panels, hardware and door seals; installation of temporary fencing; sod installation to return to existing conditions; site restoration; bypass pumping; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.
Lift Station No. 8
The work includes but not limited to, cleaning and degritting the wet well; blasting and recoating the wet well walls, floors, and underside of top slab; application of one-inch (1") of concrete repair mortar to all areas of the wet well walls, floors and underside of top slab; demolition and replacement of all wet well riser piping, including protective coatings; demolition and replacement of pump guide rail, stainless steel intermediate brackets, and cable holder assemblies; installation of rigid safety grate system; blast and recoat the valve vault piping, valves, and fittings; clean and recoat the generator enclosure; existing gate modifications; installation of temporary fencing; sod installation to return to existing conditions; site restoration; bypass pumping; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.
## Details **Bid/Project ID:** 00352-0238-01 **Type of Work:** Sanitary Sewer Lift Station Rehabilitations **Pre-Bid Location:** Microsoft Teams Meeting Invitation **Pre-Bid Notes:** MICROSOFT TEAMS +1 832-856-3756; ID: 476 735 04# **Bid Location:** 6330 West Loop South Suite 150, Bellaire, Texas 77401 **Engineer/Publisher:** Quiddity Engineering **Engineer Address:** 6330 West Loop South Suite 150, Bellaire, Texas, 77401SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.