SLED Opportunity · CONNECTICUT · CONNECTICUT
AI Summary
The City of Meriden seeks contractors for the reconstruction of Lincoln Middle School parking lot, including pavement, curbing, drainage, and sedimentation control. Project starts March 27, 2026, with bids due April 23, 2026.
The City of Meriden wishes to have the Lincoln Middle School parking lot reconstructed located at 164 Centennial Ave, CT. The work under this contract consists of the removal and replacement of pavement, curbing, drainage structure tops, pavement markings, and installation of appropriate sedimentation control measures. The intention of this project is to reconstruct the existing infrastructure, with some slight modifications to pavement markings and pavement sections.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.