Active SLED Opportunity · TEXAS · KPA ENGINEERS
AI Summary
The City of Little River-Academy seeks bids for street improvements including subgrade preparation, crushed limestone base, ribbon curb installation, HMAC paving, and topsoil revegetation. Bids are due by July 14, 2026, with public opening at city hall.
Bids are invited for several items and quantities of work as follows:
1. 2,290 SY of 6” Moisture Conditioned Subgrade, Geogrid, and 5.5” Crushed Limestone Base Material;
2. 1,869 LF of 18” Wide Ribbon Curb;
3. 1,785 SY of 4.5” Crushed Limestone Base Material and 1.5” HMAC Type D;
4. 1,785 SY of 4” Topsoil and Revegetation.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.