SLED Opportunity · FLORIDA · MIAMI DADE STRATEGIC PROCUREMENT DEPARTMENT

    Manor Park Home Accessibility Upgrade

    State, local, and education procurement opportunity
    countyRFPmiami dade Strategic Procurement DepartmentSol. RPQ No 101904
    Closed
    STATUS
    Closed
    PUBLISHED
    Apr 9, 2026
    Posting date
    JURISDICTION
    miami dade
    county
    NAICS CODE
    236118
    AI-classified industry

    AI Summary

    Contract opportunity for exterior and interior home accessibility upgrades at a single-family residence in Miami, FL, including demolition, ADA-compliant construction, and installation of various building systems.

    Opportunity details

    Solicitation No.
    RPQ No 101904
    Type / RFx
    RFP
    Level
    county
    Published Date
    April 9, 2026
    Due Date
    NAICS Code
    236118AI guide
    State
    florida

    Description

    This project is for exterior and interior home accessibility upgrades to an existing single-family residence for Manor Park Residence (FL5-847) located at 1437 NW 51st Street, Miami, Florida 33142. Scope of demolition includes exterior demolition of entry concrete sidewalk, entry concrete slab, entry door, bathroom window, and as indicated on plans; and the interior demolition of partition walls, doors, kitchen cabinets, appliances, electrical, plumbing, floor finishes as depicted on construction documents prepared by JN Montenegro Studio, LLC and Miami-Dade County Project Manual. Proposed exterior work includes ADA accessible entry sidewalk, entry concrete slab, entry door, block-up existing window, and as indicated on plans; and proposed interior work includes partition walls, doors, kitchen cabinets, appliances, floor finishes, electrical, mechanical, plumbing as depicted on construction documents prepared by JN Montenegro Studio LLC and Miami-Dade County Project Manual. The Contractor shall be responsible for all job tasks associated with the successful work of the stated scope of work, as required and approved by an authorized HCD representative. Tasks, clean-up, and removal of all items not specifically mentioned in the scope, but which are obviously required for an operable/functional system shall be included without additional cost to HCD. The Contractor shall arrange for his/her own storage facility (if needed). The Contractor shall leave the site free and clear of all debris. The Contractor is responsible for providing all materials, labor, equipment, and permits/inspection fees (when necessary) for the total completion of this work. All work shall be performed in the best standards of workmanship and shall be in accordance with Florida Building Code, all national, state, county, and municipal codes, rules, guidelines, regulations, and departments having jurisdiction.

    Key dates

    1. April 9, 2026Published

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.