Active SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
The City of Oklahoma City seeks bids for the construction of the MAPS 4 Mental Health Crisis Center. Mandatory prequalification as Building Contractor "A" is required. The project includes a crisis stabilization unit and administration offices. Bids are due June 10, 2026, with a mandatory pre-bid conference on May 28, 2026.
Prequalification is: Building Contractor "A" M4-MM011 MAPS 4 Mental Health Crisis Center **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 06/03/2026 01:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: MAPS OFFICE **Reference Number**: 0000423641 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 05/28/2026 04:30 PM EDT | Location: EMBARK CONFERENCE ROOM, 431 WEST MAIN, SUITE B, OKLAHOMA CITY, OK 73102 | Event Note: 103.01 – PRE-BID CONFERENCE 103.01.03.01 When specified in the Notice to Bidder, attendance at the Pre-Bid Conference is a prequalification requirement. If there is a virtual meeting option, the virtual address will be provided in the Notice to Bidders. When the Notice to Bidders specifies that the Pre-Bid Conference is mandatory, the contractor who plans to submit a bid must attend the Mandatory Pre-Bid Conference. Failure of the prospective bidders to attend a Mandatory Pre-Bid Conference will cause the bidder’s submission to be rejected. Whenever required, a Mandatory Pre-Bid Conference is a prequalification requirement to bid on the contract. **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Next ESTIMATE - Updated Next 1-Base Bid Code Description UOM Qty C200 Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications Lump-Sum 1 Next 2-Alternate 1 Code Description UOM Qty C200 Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF Lump-Sum 1 Next 3-Alternate 2 Code Description UOM Qty C200 Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF Lump-Sum 1 Next 4-Alternate 3 Code Description UOM Qty C200 Alternate 3 Administration Offices - 619 SF Lump-Sum 1 | Next 1-Base Bid Code Description UOM Qty C200 Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications Lump-Sum 1 | C200 | Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications | Lump-Sum | 1 | | Next 2-Alternate 1 Code Description UOM Qty C200 Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF Lump-Sum 1 | C200 | Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF | Lump-Sum | 1 | | Next 3-Alternate 2 Code Description UOM Qty C200 Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF Lump-Sum 1 | C200 | Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF | Lump-Sum | 1 | | Next 4-Alternate 3 Code Description UOM Qty C200 Alternate 3 Administration Offices - 619 SF Lump-Sum 1 | C200 | Alternate 3 Administration Offices - 619 SF | Lump-Sum | 1 | | | | Next 1-Base Bid Code Description UOM Qty C200 Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications Lump-Sum 1 | C200 | Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications | Lump-Sum | 1 | | | C200 | Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications | Lump-Sum | 1 | | Next 2-Alternate 1 Code Description UOM Qty C200 Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF Lump-Sum 1 | C200 | Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF | Lump-Sum | 1 | | | C200 | Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF | Lump-Sum | 1 | | Next 3-Alternate 2 Code Description UOM Qty C200 Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF Lump-Sum 1 | C200 | Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF | Lump-Sum | 1 | | | C200 | Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF | Lump-Sum | 1 | | Next 4-Alternate 3 Code Description UOM Qty C200 Alternate 3 Administration Offices - 619 SF Lump-Sum 1 | C200 | Alternate 3 Administration Offices - 619 SF | Lump-Sum | 1 | | | C200 | Alternate 3 Administration Offices - 619 SF | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Next 1-Base Bid Code Description UOM Qty C200 Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications Lump-Sum 1 | C200 | Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications | Lump-Sum | 1 | | | C200 | Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications | Lump-Sum | 1 | | Next 2-Alternate 1 Code Description UOM Qty C200 Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF Lump-Sum 1 | C200 | Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF | Lump-Sum | 1 | | | C200 | Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF | Lump-Sum | 1 | | Next 3-Alternate 2 Code Description UOM Qty C200 Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF Lump-Sum 1 | C200 | Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF | Lump-Sum | 1 | | | C200 | Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF | Lump-Sum | 1 | | Next 4-Alternate 3 Code Description UOM Qty C200 Alternate 3 Administration Offices - 619 SF Lump-Sum 1 | C200 | Alternate 3 Administration Offices - 619 SF | Lump-Sum | 1 | | | C200 | Alternate 3 Administration Offices - 619 SF | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | C200 | Base Bid M4-MM011 MAPS 4 Mental Health Crisis Center Refence Complete Drawings and Specifications | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | C200 | Alternate 1 Crisis Stabilization Unit 8 Bedrooms and Support Spaces - 4,230 SF | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | C200 | Alternate 2 Crisis Stabilization Unit 8 Bedrooms and 1 Toilet/Shower Room - 1,327 SF | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | C200 | Alternate 3 Administration Offices - 619 SF | Lump-Sum | 1 | **Questions and Answers**: - Q1 Arrow Right Question: Prequalification is: Building Contractor "A" Good morning, Southwind Construction Services, LLC is interested in bidding M4-MM011 – MAPS 4 Mental Health Crisis Center. We noted the solicitation requirement stating “Prequalification is: Building Contractor ‘A’.” Would you please advise on the process and requirements to obtain or confirm Building Contractor “A” prequalification status with the City of Oklahoma City? Additionally, please confirm: * whether firms must already hold this prequalification prior to the mandatory pre-bid conference and bid date; and * where the applicable prequalification forms and instructions may be obtained. Thank you for your assistance. We appreciate your guidance and look forward to participating in the procurement. Respectfully, Andrea L. Heister, MBA, CF APMP Senior Proposal Manager Southwind Construction Services, LLC AHeister@wichita-quivera.com (405) 412-1694 Arrow Right Answer: The prequalification process for Building Contractor "A" is around a 60-day process, as it is dependent on approval from a board that meets once a month. This prequal would have to be completed by the actual bid date, but not the pre-bid. But at this point there is not enough time. For future projects, you can register online at https://www.okc.gov/Infrastructure-Development/Public-Works/Contractor-Resources/Prequalification. 05/20/2026 11:47 AM EDT 05/20/2026 02:42 PM EDT
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.