Active SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS

    MAPS 4 MULTIPURPOSE STADIUM Bid Package 4.9 Tile and Carpeting

    Issued by The City of Oklahoma City and Trusts
    cityRFQThe City of Oklahoma City and TrustsSol. 9236253319
    Open · 1d remaining
    DAYS TO CLOSE
    1
    due Aug 7, 2026
    PUBLISHED
    Jul 8, 2026
    Posting date
    JURISDICTION
    The City
    city
    NAICS CODE
    238330
    AI-classified industry

    AI Summary

    The City of Oklahoma City seeks qualified bidders for tile and carpeting installation at the MAPS 4 Multipurpose Stadium. This formal Request for Bid requires mandatory pre-bid attendance and electronic bid submission by July 30, 2026.

    Opportunity details

    Solicitation No.
    9236253319
    Type / RFx
    RFQ
    Status
    Active
    Level
    city
    Published Date
    July 8, 2026
    Due Date
    August 7, 2026
    NAICS Code
    238330AI guide
    Agency
    The City of Oklahoma City and Trusts

    Description

    Public notice seeking qualified bidders for this Project was issued on 15th of April, 2026 and again on 2nd day of June, 2026. Only Bidders qualified pursuant to that solicitation may Bid on this Contract. **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: MAPS OFFICE **Reference Number**: 0000428877 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/16/2026 04:00 PM EDT | Location: LINGO Const. Serv. Office located at 1135 N. Robinson Ave., OKC, OK 73103 in Conf Room 1 and TEAMS | Mandatory: True **Line Items**: | description | uom | quantity | |---|---|---| | Next 1-Base Bid Code Description UOM Qty A2. ID.1A Tile and Carpeting Lump-Sum 1 | A2. ID.1A | | | A2. ID.1A | Tile and Carpeting | | | Tile and Carpeting | Lump-Sum | 1.0 | | A2.ID.1BC | $______________per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Resilient Flooring (AF1, RF) on a slab containing 75%-90% relative humidity and maintain manufacturer’s warranty. | | | $______________per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Resilient Flooring (AF1, RF) on a slab containing 75%-90% relative humidity and maintain manufacturer’s warranty. | Unit | 1.0 | | A2.ID.1DE | $______________ per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Resilient Flooring (AF1, RF) on a slab containing 91%-95% relative humidity and maintain manufacturer’s warranty. | | | $______________ per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Resilient Flooring (AF1, RF) on a slab containing 91%-95% relative humidity and maintain manufacturer’s warranty. | Unit | 1.0 | | A2.ID.1F | $______________ per Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Resilient Flooring (AF1, RF) on a slab containing 96%-99% relative humidity and maintain manufacturer’s warranty. | | | $______________ per Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Resilient Flooring (AF1, RF) on a slab containing 96%-99% relative humidity and maintain manufacturer’s warranty. | Unit | 1.0 | | A2.ID.2A | $______________per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Carpet (CA) on a slab containing 75%-90% relative humidity and maintain manufacturer’s warranty. | | | $______________per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Carpet (CA) on a slab containing 75%-90% relative humidity and maintain manufacturer’s warranty. | Unit | 1.0 | | A2.ID.2F | $______________ per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Carpet (CA) on a slab containing 91%-95% relative humidity and maintain manufacturer’s warranty. | | | $______________ per SF Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Carpet (CA) on a slab containing 91%-95% relative humidity and maintain manufacturer’s warranty. | Unit | 1.0 | | A6.1 | $______________ per Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Carpet (CA) on a slab containing 96%-99% relative humidity and maintain manufacturer’s warranty. | | | $______________ per Add/(Deduct) If Trade Contractor provides glues and floor prep necessary to install Carpet (CA) on a slab containing 96%-99% relative humidity and maintain manufacturer’s warranty. | Unit | 1.0 | **Questions and Answers**: | Question | Answer | |---|---| | Substitution Request MMA substitution request https://www.dropbox.com/scl/fo/6r64gs2z4dduokgup36yn/AFaDxeeiM95JnBFiP58YWqY?rlkey=2vq07dmt6pbek5tmpvrnhd2gw&st=4hi94jpy&dl=0 Arrow Right Answer: This is acceptable. See Finish Legend, A9-2-1 - FT1 & FT2 | Substitution Request MMA substitution request https://www.dropbox.com/scl/fo/6r64gs2z4dduokgup36yn/AFaDxeeiM95JnBFiP58YWqY?rlkey=2vq07dmt6pbek5tmpvrnhd2gw&st=4hi94jpy&dl=0 Arrow Right Answer: This is acceptable. See Finish Legend, A9-2-1 - FT1 & FT2 | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/24/2026 02:43 PM EDT | | | Addendum No. 2 | 07/28/2026 05:37 PM EDT | |

    Key dates

    1. July 8, 2026Published
    2. August 7, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.