Active SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS

    Marina Dock Improvements

    Issued by The City of Oklahoma City and Trusts
    cityRFBThe City of Oklahoma City and TrustsSol. 8774982902
    Open · 13d remaining
    DAYS TO CLOSE
    13
    due May 27, 2026
    PUBLISHED
    May 6, 2026
    Posting date
    JURISDICTION
    The City
    city
    NAICS CODE
    237990
    AI-classified industry

    AI Summary

    The City of Oklahoma City seeks bids for Marina Dock Improvements at Lake Stanley Draper. The project includes installation of helical screws, flotation devices, ropes, and fabrication work. Mandatory pre-bid conference on May 14, 2026. Bids due by May 27, 2026, via electronic submission.

    Opportunity details

    Solicitation No.
    8774982902
    Type / RFx
    RFB
    Status
    Active
    Level
    city
    Published Date
    May 6, 2026
    Due Date
    May 27, 2026
    NAICS Code
    237990AI guide
    Agency
    The City of Oklahoma City and Trusts

    Description

    Prequalification- Special Questionaire WM-0482 Marina Dock Improvements, Lake Stanley Draper **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/19/2026 12:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: The Oklahoma City Water Utilities Trust **Reference Number**: 0000421269 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 05/14/2026 12:00 PM EDT | Location: Microsoft Teams | Event Note: Mandatory Pre-Bid Conference will be held on May 14, 2026 at 11:00:00 a.m, via Microsoft Teams. To participate in the meeting via Microsoft Teams: Join by link: https://teams.microsoft.com/meet/25362821858288?p=B5G2g7AwLEJx8t3MFn To participate in the meeting via phone: Call: 1 405-594-0459 Phone conference ID: 405210354# **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Dock Improvements Next 1-Base Bid Code Description UOM Qty 1 MOBILIZATION Lump-Sum 1 2 HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) Each 14 3 FLOTATION (EAGLE FLOATS EF5624) Each 7 4 ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) Each 14 5 ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), Linear Foot/Feet 784 6 CHAIN, SHACKLES, AND FAIRLEAD Each 14 7 BRACKET REMOVAL AND FABRICATION Each 14 8 INSTALLATION Lump-Sum 1 | Next 1-Base Bid Code Description UOM Qty 1 MOBILIZATION Lump-Sum 1 2 HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) Each 14 3 FLOTATION (EAGLE FLOATS EF5624) Each 7 4 ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) Each 14 5 ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), Linear Foot/Feet 784 6 CHAIN, SHACKLES, AND FAIRLEAD Each 14 7 BRACKET REMOVAL AND FABRICATION Each 14 8 INSTALLATION Lump-Sum 1 | 1 | MOBILIZATION | Lump-Sum | 1 | 2 | HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) | Each | 14 | 3 | FLOTATION (EAGLE FLOATS EF5624) | Each | 7 | 4 | ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) | Each | 14 | 5 | ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), | Linear Foot/Feet | 784 | 6 | CHAIN, SHACKLES, AND FAIRLEAD | Each | 14 | 7 | BRACKET REMOVAL AND FABRICATION | Each | 14 | 8 | INSTALLATION | Lump-Sum | 1 | | | | Next 1-Base Bid Code Description UOM Qty 1 MOBILIZATION Lump-Sum 1 2 HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) Each 14 3 FLOTATION (EAGLE FLOATS EF5624) Each 7 4 ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) Each 14 5 ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), Linear Foot/Feet 784 6 CHAIN, SHACKLES, AND FAIRLEAD Each 14 7 BRACKET REMOVAL AND FABRICATION Each 14 8 INSTALLATION Lump-Sum 1 | 1 | MOBILIZATION | Lump-Sum | 1 | 2 | HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) | Each | 14 | 3 | FLOTATION (EAGLE FLOATS EF5624) | Each | 7 | 4 | ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) | Each | 14 | 5 | ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), | Linear Foot/Feet | 784 | 6 | CHAIN, SHACKLES, AND FAIRLEAD | Each | 14 | 7 | BRACKET REMOVAL AND FABRICATION | Each | 14 | 8 | INSTALLATION | Lump-Sum | 1 | | | 1 | MOBILIZATION | Lump-Sum | 1 | | 2 | HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) | Each | 14 | | 3 | FLOTATION (EAGLE FLOATS EF5624) | Each | 7 | | 4 | ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) | Each | 14 | | 5 | ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), | Linear Foot/Feet | 784 | | 6 | CHAIN, SHACKLES, AND FAIRLEAD | Each | 14 | | 7 | BRACKET REMOVAL AND FABRICATION | Each | 14 | | 8 | INSTALLATION | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next 1-Base Bid Code Description UOM Qty 1 MOBILIZATION Lump-Sum 1 2 HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) Each 14 3 FLOTATION (EAGLE FLOATS EF5624) Each 7 4 ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) Each 14 5 ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), Linear Foot/Feet 784 6 CHAIN, SHACKLES, AND FAIRLEAD Each 14 7 BRACKET REMOVAL AND FABRICATION Each 14 8 INSTALLATION Lump-Sum 1 | 1 | MOBILIZATION | Lump-Sum | 1 | 2 | HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) | Each | 14 | 3 | FLOTATION (EAGLE FLOATS EF5624) | Each | 7 | 4 | ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) | Each | 14 | 5 | ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), | Linear Foot/Feet | 784 | 6 | CHAIN, SHACKLES, AND FAIRLEAD | Each | 14 | 7 | BRACKET REMOVAL AND FABRICATION | Each | 14 | 8 | INSTALLATION | Lump-Sum | 1 | | | 1 | MOBILIZATION | Lump-Sum | 1 | | 2 | HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) | Each | 14 | | 3 | FLOTATION (EAGLE FLOATS EF5624) | Each | 7 | | 4 | ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) | Each | 14 | | 5 | ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), | Linear Foot/Feet | 784 | | 6 | CHAIN, SHACKLES, AND FAIRLEAD | Each | 14 | | 7 | BRACKET REMOVAL AND FABRICATION | Each | 14 | | 8 | INSTALLATION | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | MOBILIZATION | Lump-Sum | 1 | | 2 | HELICAL SCREWS (SS, 1-1/2" SQ. SHAFT - 8"/10" ON 5' LEAD SECT. & TERM. PIECE W/ 1" SCREW PIN SHACKLE) | Each | 14 | | 3 | FLOTATION (EAGLE FLOATS EF5624) | Each | 7 | | 4 | ELASTIC RODES (6.5' SIX RODE MARINEMASTER SYSTEM W/ LIMIT LINE, 96506L) | Each | 14 | | 5 | ROPE (32' LONG 5/16" S-12 SYNTHETIC STAINLESS STEEL ROPE x2), | Linear Foot/Feet | 784 | | 6 | CHAIN, SHACKLES, AND FAIRLEAD | Each | 14 | | 7 | BRACKET REMOVAL AND FABRICATION | Each | 14 | | 8 | INSTALLATION | Lump-Sum | 1 |

    Key dates

    1. May 6, 2026Published
    2. May 27, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.