Active SLED Opportunity · MINNESOTA · METROPOLITAN COUNCIL — 7-COUNTY TWIN CITIES METRO, MINNESOTA
AI Summary
Construction of the METRO G Line BRT project along an 11.5-mile corridor in the Twin Cities Metro area, including site preparation, electrical and communications installation, roadway and sidewalk reconstruction, and related infrastructure improvements.
The work of this project includes construction of the G Line BRT project along a 11.5 mile corridor in Little Canada, Roseville, Maplewood, St. Paul, and West St. Paul along Rice Street and Robert Street. Construction scope generally includes, but is not limited to: Site preparation, including demolition, grading, roadway changes, and traffic control; Installation of station pylon and shelters, separately procured under concurrent contracts; Purchase, installation, and testing of electrical and communications components; and Curb & gutter, sidewalks, drainage, signal work, lighting, ADA pedestrian ramps, and street pavement reconstruction. An operator restroom and break room facility will also be constructed through the G Line project. Category: Construction, Street Lighting / Streetlight Improvements, Buildings/Public, Electrical Equipment & Supplies, Communication Facilities/Network, Pavement - Marking, Public Transit Center, Water Main (Repair/Replace) Rehabilitation, Demolition/Building Removal/Hauling/Salvage, DOT Projects, Electrical Installation/Construction, Landscaping Tree, Shrub Planting, Erosion Control/Slope, Bank Stabilization, Fencing/Guardrails/Handrails, Pavement Removal, Excavation, Irrigation, Landscaping - Seeding, Monument Sign Design/Construction, Landscaping (Retaining Walls), Restrooms, Miscellaneous, Street/Road Intersection Construction and Repair, Traffic Control Devices (Signals, Signing, etc.), Tower Radio/Radar Maint/Repair, Sewer and Water Construction, Sitework/Excavating and Grading, Street/Road/Bypass Lane Construction and/or Repair, Street/Road Concrete Reconstruction, Landscaping (Tree and Shrub Clearing), Roadway Lighting, Aggregate, Street/Road Asphalt Resurfacing and Milling, Concrete Walkway, Concrete Pavement, Structural - Interior/Exterior Staircase, Sweeping Services - Street - Parking Lots, Bored Conduit, Grade, Surface and Bridge, Grade and Surface, Revised Signal System, Traffic Control, Stormwater Improvements, Street/Road Intersection Improvements, Roadway Pavement Markings, Heating, Ventilation, Air Conditioning (HVAC), Utility Street Construction and Excavation, Painting, Curbs, Water/Wastewater Infrastructure, Electrical and Controls, ADA Curb Ramps, Landscaping, Street/Road Materials, Erosion Control - Temporary, Paving (Asphalt or Concrete), Plumbing, Directional Bore, Televising Sewers, Directional Drilling, Street/Roadway Reconstruction , Signage, Paving (Highway, Road or Street), Fiber Optics, Concrete/Formed/Flatwork/Foundation, Traffic Control Signal Systems, Electrical, Drainage, Pedestrian Improvements, Removal and Replacement of pipe, Street/Road Pavement Marking, Conduit/Electrical/Telemetry, Concrete Pavement Removal, Buildings Commercial and Private. Pre-Bid Meeting: A pre-bid meeting will be held on June 17, 2026 at 9:00 AM, via Microsoft TEAMS. Bidders are strongly encouraged to attend. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/280401588942864?p=zYBiKsqd0NcjVflQYD Meeting ID: 280 401 588 942 864 Passcode: 73eP2zp6 Dial in by phone +1 763-600-8619,,25484005# United Bid Submission: Metropolitan Council via QuestCDN.com online Bidding system Bid documents are available for purchase through QuestCDN. Contact us and we will obtain the full document package on your behalf.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.