SLED Opportunity · MINNESOTA · STATEWIDE — STATE OF MINNESOTA
AI Summary
Construction project for replacement of water control structures at Mille Lacs Wildlife Management Area, including demolition, excavation, concrete work, and metal fabrication. Estimated value $130,960, bids due May 28, 2026.
State Project No. 2026-689-8W265 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. SUMMARY OF WORK: 1. Demolition and Disposal 2. Dewatering 3. Excavation and Embankment 4. Sediment and Erosion Control 5. Sheet Pile 6. Cast-In-Place Concrete 7. Culvert and Water Control Structure Installation 8. Metal Fabrication 9. Gravel Surfacing 10. Turf Establishment Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Jeff Erickson, email: jeff.erickson@state.mn.us, Telephone: (218) 308-2639. Category: Construction. Estimated Value: $ 130,960.00. Estimated Completion Date: Oct. 2, 2026. Pre-Bid Meeting: No Pre Bid Meeting Bid Submission: All responses to this solicitation must be submitted and received in the Quest CDN Plan Room no later than 2:00pm on May 28, 2026. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com. Bid documents are available for purchase through QuestCDN. Contact us and we will obtain the full document package on your behalf.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.