SLED Opportunity · TEXAS · TEXAS
AI Summary
MLK 42” Sewer Repair in Texas involves manhole removal and adjustment, installation of 115 LF of 42” steel pipe by non-open cut methods, and replacement of concrete riprap and channel.
MLK 42” Sewer Repair Project will include removal of existing manhole, 115 LF of 42” steel pipe to be installed by other than open cut, resetting existing manhole, adjusting manholes, and removal and replacement of concrete riprap and channel.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.