SLED Opportunity · FLORIDA · MIAMI DADE STRATEGIC PROCUREMENT DEPARTMENT

    Multiple Marina Piling Replacement - South of SW 120th St to County Line

    State, local, and education procurement opportunity
    countyRFQmiami dade Strategic Procurement DepartmentSol. RPQ No 340626
    Closed
    STATUS
    Closed
    PUBLISHED
    May 22, 2026
    Posting date
    JURISDICTION
    miami dade
    county
    NAICS CODE
    237990
    AI-classified industry

    AI Summary

    Miami Dade County seeks contractors for as-needed replacement of marine pilings with fiberglass composite at multiple marina locations south of SW 120th St. The contract is work order driven for 365 days, requiring permits, erosion control, and compliance with sea level rise initiatives.

    Opportunity details

    Solicitation No.
    RPQ No 340626
    Type / RFx
    RFQ
    Level
    county
    Published Date
    May 22, 2026
    Due Date
    NAICS Code
    237990AI guide
    State
    florida

    Description

    This Contract is intended to provide services on an as-needed basis across multiple locations within Miami Dade County Park Facilities, as may be requested by the Owner. This is a blanket project which is work order driven. The RPQ term shall be three hundred sixty-five (365) calendar days, or until the not-to-exceed contract allocation is fully expended, whichever occurs first. The purpose of this solicitation is to establish a contract for the replacement of Marine Pilings, with Pearson Fiberglass Composite (Brown in color) or approved equal. This contract will be replacing existing pilings throughout all of Miami Dade County Parks and Recreation Marinas within South of SW 120th St to County Line. 1 CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade County Park & Recreation Construction Division for work to be completed. Furnish all labor, equipment and materials required. 2 Contractor shall be responsible for attaining all pertinent permits from any and all governing entities (i.e., City of Miami, Miami-Dade RER, Electrical, Plumbing, Miami-Dade Public Works, Miami-Dade Water & Sewer, DERM, Fire, FDEP, Florida Department of Health, South Florida Water Management, US Army Corps of Engineers, Florida Department of Environmental Protection, USCG etc.) needed to begin and complete all phases of work. 3 If applicable, prior to starting project, CONTRACTOR shall notify any departments having jurisdiction of the work being performed. 4 CONTRACTOR shall comply with Office of Resilience initiatives, to include Sea Level Rise. 5 Contractor shall coordinate all required inspections/tests and documentation required by any/all governing entities, i.e., City of Miami, Miami-Dade Building Department, etc. 6 It shall be the contractor’s responsibility to ensure that all required regulatory or proprietary permits are obtained prior to commencement of work. 7 Contractor shall use silt barrier, turbidity barriers or any other form of erosion control necessary to avoid contaminating boat basin area. 8 All new pilings being installed shall be Pearson Fiberglass Composite or equivalent. All substitutions shall be submitted to the Miami Dade County Project Manager. 9 Due to sea level rise, all new pilings shall be raised up 3 feet above existing pilings’ elevation. 10 The contractor shall notify the project manager prior to starting the job. 11 All new Fiberglass Composite being installed shall be the approximate diameter as existing wood pilings. Existing size to be identified and new piling size shall be approved prior to installation. 12 Contractor shall complete site visit for inspection of existing damage square pile for replacement to match existing in size, dimension, and structural bearing specifications with same materials. 13 All new pilings shall be driven to equal/greater depth of existing pilings being removed to prevent leaning, swaying, twisting, etc. 14 Piles which require excessive bending to straighten shall be withdrawn and re-installed to the proper vertical upright position. (Piles shall not be installed and then pulled into position). 15 Contractor shall be required during installation of new piling to be monitored by pile driving report/records submitted by location to ensure minimum driving resistance, record of depth to existing pilings which were removed, record total length to include above ground height/elevation to equal depth/embedment. All requests for information (RFI) must be submitted in writing by 06/15/2026 to Roberto.Ciprian@miamidade.gov and copy the Clerk of the Board at clerkbcc@miamidade.gov. NO PHONE CALLS WILL BE ACCEPTED. Verbal statements made by the County or the Owner’s Representative that are not contained in an RPQ or addendum to the RPQ are not binding on the County and should not form any basis for a bidder’s response to an RPQ. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.

    Key dates

    1. May 22, 2026Published

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.