SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
State-level solicitation for Nash Pond Shoreline Stabilization in Massachusetts involving coffer dam installation, dewatering, timber slope removal, and stone wall embankment restoration. Estimated cost $75,400. Pre-bid conference on March 16, 2026.
Nash Pond Shoreline Stabilization - installation of a temporary coffer dam and dewatering, removal of deteriorated timber slope checks and restoration of the shoreline embankment with a tiered stone wall system. Project cost is estimated to be $75,400. Pre Bid Conference: Pre Bid Conference Monday March 16, 2026 at 930am at the project location.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.