Active SLED Opportunity · TEXAS · TRAVIS COUNTY

    Ned Granger 1st Floor County Attorney Expansion

    Issued by Travis County
    countyIFBTravis CountySol. 9076653903
    Open · 1d remaining
    DAYS TO CLOSE
    1
    due Aug 6, 2026
    PUBLISHED
    Jul 8, 2026
    Posting date
    JURISDICTION
    Travis County
    county
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Travis County, Texas seeks bids for the Ned Granger 1st Floor County Attorney Expansion project. This is a formal Invitation for Bid (IFB) with lump sum pricing. Bids are due by July 30, 2026, with a recommended prebid conference on July 15, 2026, held via Microsoft TEAMS.

    Opportunity details

    Solicitation No.
    9076653903
    Type / RFx
    IFB
    Status
    Active
    Level
    county
    Published Date
    July 8, 2026
    Due Date
    August 6, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    Travis County
    State
    Texas
    Agency
    Travis County

    Description

    See plans. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.OTH.USA.2774764.C19617376 **Piggyback Contract**: No **Questions are submitted online**: Yes **Bid Submission Type**: Electronic or Physical Bid Submission **Reference Number**: 0000426090 **Pricing**: Lump sum **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Completed Documents | Completed Documents | Yes | No | | W9 | W9 | Yes | No | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/15/2026 11:00 AM EDT | Location: Microsoft TEAMS **Line Items**: | description | quantity | uom | |---|---|---| | Ned Granger 1st Floor County Attorney Expansion | 1.0 | Lump-Sum | **Questions and Answers**: | Question | Answer | |---|---| | Will there be a site visit for this solicitation? | Answered in Communication 1 | | Drawing AD1.0 under demo keynote #2, indicates removal of old flooring and replacing with new flooring. Is there a detail for new LVT flooring and advice if self-leveling underlayment is required for the LVT flooring. | Answered in Communication 2 | | Please advise if there are any details for signage as per drawing A2.0 | Answered in Communication 2 | | Drawing AD1.0 under demo keynote #4, indicates repurposing the exiting door. Existing doors to be repurposed cannot be located in plan. | Answered in Communication 2 | | Please provide if applicable specification for door hardware’s. | Answered in Communication 2 | | Please advise if there are any additional specifications for the job. Specification for the remaining sections is missing from the original bid documents. | Answered in Communication 1 | | Please provide if possible architectural drawings in 24x36 or higher size. The bid drawings provided are smaller sizes and therefore not legible in takeoff software’s. | Answered in Communication 2 | | Is there a map of where the containment walls are to be located? | Answered in Communication 3 | | What is the substantial completion date? | Answered in Communication 1 | | What will be the Notice to Proceed (NTP) date? | Answered in Communication 1 | | Confirm if scale on AD1.1 is as mentioned below the drawing. There seems to be a conflict within the estimating software and there are no dimensions to verify. Please advise. | Answered in Communication 2 | | Would you please post the Prebid Sign in Sheet? | Answered in Communication 1 | | The project manual stops on section 01 47 19. When will the full project manual be uploaded? | Answered in Communication 1 | | Addendum 2 states it is an updated plan but appears to be the Project Manual - there are no plans. | Answered in Communication 3 | | What is the make and model of the fire alarm panel? Who currently monitors this system? | Answered in Communication 3 | | Please confirm if bid due date is 08.06.2026 as shown in bidnet. Addendum 1, shows bid due date as 07.30.2026. | Answered in Communication 2 | | Please advise if there is abatement involved. Specification directs to Appendix A for hazardous materials, but appendix A does not mention about them. | Answered in Communication 3 | | Is the network rack for this work existing or do we need to provide new racks? | Answered in Communication 3 | | Is there an estimated construction budget for this project? | Answered in Communication 3 | | Do prevailing wage rates apply on this project? | Answered in Communication 3 | | Please confirm that all access-control and video-surveillance devices, security cabling, programming, panels, power supplies, and system integration will be furnished and installed through the $5,929.44 Travis County security allowance/named subcontractor. Please also identify the doors receiving access control and clarify whether the electrical contractor is responsible for any conduit, backboxes, dedicated power, or fire-alarm interface beyond what is currently shown. | Answered in Communication 3 | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/16/2026 10:23 AM EDT | | | Addendum No. 2 | 07/16/2026 10:30 AM EDT | | | Addendum No. 3 | 07/21/2026 09:57 AM EDT | | | Addendum No. 4 | 07/21/2026 04:58 PM EDT | | | Addendum No. 5 | 07/24/2026 02:11 PM EDT | | | Addendum No. 6 | 07/28/2026 11:06 AM EDT | | **Communications**: - Communication No.3: Answers to questions attached. — Q&A Document 3.pdf - Communication No.2: Q&A Published. — Q&A Document 2.pdf - Communication No.1: Q&A attached. — Q&A Document 1.pdf

    Key dates

    1. July 8, 2026Published
    2. August 6, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.