SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
Massachusetts state project for Norfolk Road reconstruction including asphalt paving, stormwater drainage replacement, and highway guard installation. Requires MassDOT prequalification. Estimated value $948,852.50. Pre-bid meeting on March 5, 2026.
Work includes approx. 7,000 ft. of FDR with asphalt emulsion stabilization, HMA roadway, stormwater drainage structure and pipe replacement, highway guard and related work on Norfolk Road beginning at East Hill Road intersection and proceeding south. MassDOT Prequalification of contractors with Pavement-Surfacing as class of work is required. Estimated value of project is $948,852.50. Contact Michelle Messana at Foresight Land Service, Inc. to request documents - mmessana@foresightland.com. Pre Bid Conference: Onsite Pre-Bid Meeting on Thursday, March 5, 2026 at 2:00PM (Meet at intersection of East Hill Road and Norfolk Road in New Marlborough).
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.