Active SLED Opportunity · TEXAS · UPPER TRINITY REGIONAL WATER DISTRICT
AI Summary
Northeast Pipeline Phase 3 project involves installation of 27,500 linear feet of 36-inch water main and construction of a delivery point. TWDB funded with compliance requirements. Only pre-qualified bidders may submit.
Project geneally consists of:
Installation of approximately 27,500 linear feet of new 36-inch water main and associated fittings, valves, and appurtenances.
The project also includes construction of a point of delivery site with a control valve and meter.
The Project is a Texas Water Development Board (TWDB) funded project and must comply with all TWDB requirements and stipulations including but not limited to environmental restrictions, American Iron and Steel certifications, affirmative steps certifications, and Davis Bacon wage rate certifications.
## Details **Bid/Project ID:** 064563007 **Type of Work:** Pipeline and Delivery Point Construction **Pre-Bid Location:** 900 N. Kealy Street, Lewisville, TX **Pre-Bid Notes:** Only previously Pre-Qualified Bidders will be allowed to submit on this project **Bid Location:** 900 N. Kealy Street, Lewisville, TX **Bid Notes:** Only previously Pre-Qualified Bidders will be allowed to submit on this project **Engineer/Publisher:** Kimley-Horn and Associates, Inc. **Engineer Address:** 13455 Noel Road, 700, Dallas, Texas, 75240SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.