Contract opportunity for demolition, removal, and replacement of rubber flooring at Northtown Center in New York, including concrete slab preparation and installation of new resilient flooring with multiple bid alternates.
Demolition and removal of existing rubber flooring as indicated on project drawings. Legally dispose of all existing rubber flooring materials. Concrete slab preparation to allow for new flooring to be installed. Preparation includes all mastic removal and scraping to expose existing concrete surface. Concrete shall be patched as needed per the manufacture requirements to accept new flooring. Procure and install new resilient flooring and associated materials as per project drawings. Install new flooring as per manufacture requirements. Removal, storage, and reinstallation of trim at dasher boards where flooring will be replaced. Alternates 1, 2, 3, 4, 5, and 6: Contractor shall provide for demolition of existing rubber flooring, prepare concrete floor slab surface, procure and install new flooring as per bid alternates. Refer to project drawings for scope of work areas per each alternate. Alternate 7: Contractor shall prepare concrete floor slab surface, procure and install new flooring as per bid alternate #7 Rink 2 Player Area. Refer to project drawings for scope of work area. Alternate 8 : Contractor shall prepare existing concrete slab to apply single component moisture barrier coating. Coating shall be applied to areas as designated in the finishes schedules on the Contractor Documents. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.