SLED Opportunity · UTAH · UTAH
AI Summary
Invitation to bid for the Vae View Elementary School addition and remodel in Layton, Utah. The project includes new classroom and administration space, courtyard addition, interior remodel, and installation of a new fire sprinkler system. Construction starts February 2026 and completes March 2027. Bids due January 15, 2026.
**** THIS IS A PUBLIC NOTICE ONLY - BIDS WILL BE ACCEPTED BY NORTH RIDGE CONSTRUCTION **** Bid Invitation – Vae View Elementary Addition/Remodel North Ridge Construction has been awarded a CMGC contract for the Vae View Elementary School project for the Davis School District. The School is an Existing Elementary in Layton UT that was built in 1962. The project includes 11,270 SF of new Class Room and Administration Space, 6,288 SF of Addition in the center area of the school that is currently an open courtyard space, and the remodel of selective interior spaces. The courtyard and entry way additions will be constructed out of a timber/steel hybrid system. The classrooms/administrative additions will be masonry and steel. The existing school currently does not have a Fire Sprinkler System. As a part of this project we will be adding a complete new fire system throughout the entirety of the existing school and the new additions. Construction is scheduled to begin with selective demolition in early February 2026 and complete the end of March 2027. Much of the interior remodel work will be conducted during the Below you will find the dropbox link for plans and specs and all other documents needed to submit your bid. · Bids are due Thursday January 15th at 2:00 pm. A Non-Mandatory site visit will be conducted 1/5/2026 at 3:00 for all trades. We will meet at the front entry of the School (South Side of the Building at the Flag Pole). 1750 W 1600 N, Layton UT 84041 Question Deadline will be 1/8/2026 at 4:00. All question after this date will not be answered. All Questions to be submitted to Ross Barrell at ross@northridgegc.com Final Addendum will be 1/12/2026 by the end of the day. Bids can be emailed to ross@northridgegc.com Important Notes · This school will be occupied during construction. We will push to get large amounts of the disruptive work completed during the summer break. So it will be imperative that bidders have the ability to meet work load demands during those critical months. · Schedule will be critical on this project. All bidders must acknowledge the critical schedule dates and adhere to the Critical Path Schedule and substantial completion dates. · Due to safety concerns and school disruptions, certain activities such as cranes, overhead safety, heavy equipment use, demolition and the use of gas/diesel powered equipment may be limited to designated hours or days when school is not in secession. · Due to the nature of working inside an occupied school facility, any and all labor force must be able to pass a full background check. https://www.dropbox.com/scl/fo/lkqjb7i5pq4l0jyng8i77/AAZ0kNpQai3Yz2-zREcAYs8?rlkey=ber7gpjmkkvovarps6uheiqwi&st=5grot46d&dl=0 If you have any questions please contact Ross (435) 658-9460 or email ross@northridgegc.com. **** THIS IS A PUBLIC NOTICE ONLY - BIDS WILL BE ACCEPTED BY NORTH RIDGE CONSTRUCTION **** **** THIS IS A PUBLIC NOTICE ONLY - BIDS WILL BE ACCEPTED BY NORTH RIDGE CONSTRUCTION **** Bid Invitation – Vae View Elementary Addition/Remodel North Ridge Construction has been awarded a CMGC contract for the Vae View Elementary School project for the Davis School District. The School is an Existing Elementary in Layton UT that was built in 1962. The project includes 11,270 SF of new Class Room and Administration Space, 6,288 SF of Addition in the center area of the school that is currently an open courtyard space, and the remodel of selective interior spaces. The courtyard and entry way additions will be constructed out of a timber/steel hybrid system. The classrooms/administrative additions will be masonry and steel. The existing school currently does not have a Fire Sprinkler System. As a part of this project we will be adding a complete new fire system throughout the entirety of the existing school and the new additions. Construction is scheduled to begin with selective demolition in early February 2026 and complete the end of March 2027. Much of the interior remodel work will be conducted during the Below you will find the dropbox link for plans and specs and all other documents needed to submit your bid. · Bids are due Thursday January 15th at 2:00 pm.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.