    Old Jesup Road Drainage Improvement Project

    Issued by Glynn County
    countyIFBGlynn CountySol. 225987
    Closed
    STATUS
    Closed
    due Feb 11, 2026
    PUBLISHED
    Jan 7, 2026
    Posting date
    JURISDICTION
    Glynn County
    county
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Glynn County seeks bids for the Old Jesup Road Drainage Improvement Project involving removal of existing culvert and installation of 48-inch concrete storm pipes, including road work, traffic control, dewatering, erosion control, and site restoration.

    Opportunity details

    Solicitation No.
    225987
    Type / RFx
    IFB
    Status
    open
    Level
    county
    Published Date
    January 7, 2026
    Due Date
    February 11, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    Glynn County
    State
    Georgia
    Agency
    Glynn County

    Description

    This is an invitation to submit a bid to the Glynn County Board of Commissioners for the Old Jesup Road Drainage Improvement project. The successful bidder shall provide all skill, labor, material and equipment for the removal of the existing 6'x 2.5 box culvert and associated Storm pipe at Old Jesup Rd and the installation of a double run of 48 inch concrete RCP Class III pipe with associated head walls as indicated in the construction plans attached herein.

    The work to be performed under this contract includes, but is not limited to, the following items: Road cut and removal of existing asphalt and 12" concrete road base, Removal of the existing box culvert and storm system and the installation of approximately 64 linear feet of 48-inch Class III RCP storm pipe and installation of Headwalls, Traffic control and maintenance of traffic in accordance with approved traffic control plans, dewatering operations as required to facilitate construction, backfilling, compaction, grading, and restoration of disturbed areas, borrow material placement and grading, as necessary, Storm drainage and structure installation, bypass pumping if necessary to prevent flooding upstream. Erosion and sedimentation control measures, grassing and final site stabilization.

    All work shall be performed in strict accordance with: Construction plans and drawings, Technical specifications, Special provisions, and scope of work.

    Key dates

    1. January 7, 2026Published
    2. February 11, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.