SLED Opportunity · ARIZONA · ARIZONA
AI Summary
Maricopa County seeks sealed bids for roadway widening and storm sewer installation including paving, traffic signals, and railroad crossing improvements. Construction must be completed within 440 calendar days with an additional 120 days for administrative purposes.
Notice is hereby given that Maricopa County (County) is conducting this invitation for SEALED BIDS for the work described herein: This project consists of roadway widening and storm sewer installation including removals, grading, retention basins, roadside channels, asphalt concrete paving, asphalt rubber overlay, aggregate base course, curb and gutter, sidewalk ramps, concrete scuppers, concrete catch basins, raised medians, concrete driveways, irrigation mainline and lateral piping, irrigation ditches, traffic signals, traffic signing, pavement marking, and traffic control. This project also includes improvements to existing at-grade railroad crossings at Sarival Avenue and Reems Road. All construction work on this contract is to be completed within 440 CALENDAR DAYS beginning with the date specified in the Notice to Proceed. Exclusive of and following the contract time allowed for construction work are 120 CALENDAR DAYS for internal administrative purposes thereby resulting in a total contract performance period of 560 CALENDAR DAYS. No Pre-Bid Conference or site walk have been scheduled under this solicitation. Notice is hereby given that Maricopa County (County) is conducting this invitation for SEALED BIDS for the work described herein: This project consists of roadway widening and storm sewer installation including removals, grading, retention basins, roadside channels, asphalt concrete paving, asphalt rubber overlay, aggregate base course, curb and gutter, sidewalk ramps, concrete scuppers, concrete catch basins, raised medians, concrete driveways, irrigation mainline and lateral piping, irrigation ditches, traffic signals, traffic signing, pavement marking, and traffic control. This project also includes improvements to existing at-grade railroad crossings at Sarival Avenue and Reems Road. All construction work on this contract is to be completed within 440 CALENDAR DAYS beginning with the date specified in the Notice to Proceed. Exclusive of and following the contract time allowed for construction work are 120 CALENDAR DAYS for internal administrative purposes thereby resulting in a total contract performance period of 560 CALENDAR DAYS. No Pre-Bid Conference or site walk have been scheduled under this solicitation.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.