SLED Opportunity · CALIFORNIA · PUBLIC WORKS/ENGINEERING DIVISION

    Orange Memorial Park Restroom Renovation

    Issued by Public Works/Engineering Division
    localRFPPublic Works/Engineering DivisionSol. 232050
    Closed
    STATUS
    Closed
    due Feb 20, 2026
    PUBLISHED
    Jan 28, 2026
    Posting date
    JURISDICTION
    Public Works/Engineering
    local
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Renovation of Orange Memorial Park restroom including demolition, ADA-compliant installations, plumbing, electrical upgrades, and ventilation improvements. Project funded partially by CDBG and subject to prevailing wage laws. City-approved plans by Dreiling Terrones Architecture.

    Opportunity details

    Solicitation No.
    232050
    Type / RFx
    RFP
    Status
    open
    Level
    local
    Published Date
    January 28, 2026
    Due Date
    February 20, 2026
    NAICS Code
    236220AI guide
    Agency
    Public Works/Engineering Division

    Description

    General work description:

    The Project includes renovation of the interior of an existing park restroom building and limited exterior improvements. The scope generally includes, but is not limited to:

    • Demolition and removal of existing interior finishes, fixtures, and accessories
    • Installation of new ADA-compliant and standard restroom stalls
    • Installation of new epoxy flooring with integral coved base
    • Installation of new FRP wall panels
    • Replacement of plumbing fixtures with vandal-resistant fixtures
    • Installation of new ADA-compliant lavatories, toilets, urinals, and mop basin
    • Modernization and replacement of restroom ventilation systems, including increased-capacity active ventilation and enhanced passive ventilation
    • Electrical upgrades to support new fixtures, lighting, ventilation, and no-touch amenities where feasible
    • Installation of a new exterior ADA-compliant drinking fountain with bottle filler
    • Associated plumbing, mechanical, and electrical work
    • All incidental work required to complete the Project as shown in the plans, specifications and contract documents
    • Contractor will be responsible for site security and safety through the duration of the project

    The Work shall be performed in accordance with the City-approved plans and specifications prepared by Dreiling Terrones Architecture, dated November 2025, and all applicable codes.

    This project is funded partially by a Community Development Block Grant (CDBG) and as such is subject to:

    Key dates

    1. January 28, 2026Published
    2. February 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.