Active SLED Opportunity · HAWAII · HAWAII
AI Summary
Installation of a new elevator boat lift and foundation at Pier 1, Hilo Harbor, including electrical conduit trenching, pavement restoration, and fencing.
The scope of work generally consists of the installation of a new pre-engineered elevator boat lift structure and its foundation, trenching for electrical conduits, installation of electrical connections for the boat lift, and restoration of asphalt concrete pavement, chain link fencing, gates and other miscellaneous site elements. Each boat lift track will be mounted on a concrete pile cap supported by micropile below. The estimated cost of construction is $350,000 to $450,000.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.