SLED Opportunity · WYOMING · CITY OF CHEYENNE
AI Summary
City of Cheyenne seeks contractor for Parsley Boulevard Greenway project including sidewalk installation, curb and gutter work, asphalt patching, drainage, and signage relocation within public right of way.
Parsley Boulevard Greenway project includes installation of 640 lf of new 10-foot wide concrete sidewalk, removal of curb, gutter and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach and installation of crushed base at alley, installation of drainage appurtenances and relocation of signage and Greenway fence. Contractor shall NOT do any work or store any material within the Interior Heights Addition Blocks 32 & 33 as described on the plans. Project will be within the public right of way in accordance with City of Cheyenne Construction Standards.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.