SLED Opportunity · OHIO · CITY OF COLUMBUS
AI Summary
The City of Columbus seeks bids for construction of the Parsons Avenue Water Plant CW112 Raw Water Line project, including installation of prestressed concrete pipes and directional drilling. Bids due by April 1, 2026, with a pre-bid meeting on March 17, 2026.
1.1 Scope: The City of Columbus, Department of Public Utilities is receiving bids until April 1, 2026, at 3:00 P.M. Eastern time for construction of the Division of Water’s Parsons Avenue Water Plant CW112 Raw Water Line project, C.I.P. No. 690580-100001, the work for which consists of: constructing the raw waterline from the Parsons Avenue Water Plant to an existing 42” raw waterline, installing approximately1015 LF of 36” and 1570 LF of 42” prestressed concrete cylinder pipe, approximately 376 LF of the 36” pipe is to be directionally drilled inside of a 60” steel casing pipe along with 4 -5” diameter electrical conduit with pull boxes, and other work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, special provisions, and City of Columbus Construction and Material specifications set forth in this Invitation For Bid (IFB). Bids are to be submitted only at www.bidexpress.com. Hard copies shall not be accepted. All questions concerning this project are to be sent to DPUConstructionBids@columbus.gov. The last day to submit questions will be March 20, 2026, at 3:00 P.M. Eastern Time, phone calls will not be accepted. Responses will be posted on Bid Express at www.bidexpress.com as an addendum. Notice of published addenda will be posted on the City’s Vendor Services web site and all addenda will be posted on www.bidexpress.com. A pre-bid meeting will be held. There will be a pre-bid conference held at Parsons Avenue Water Plant – Basement Conference Room at 5600 Parsons Avenue on March 17, 2026, at 1:00 P.M. Eastern Time. Bidders are encouraged to attend and participate in the conference and walk-through tour. Bidders are charged with knowing whatever was discussed in the pre-bid conference in preparing and submitting their bid. 1.2 Classification: All bid documents (Invitation for Bid, technical specifications, plans, and future addenda) will be available for review and download on Bid Express at www.bidexpress.com after the IFB is published. Firms must meet the mandatory requirements stated in the IFB for a bid to be considered for contract award. 1.3 Bid Express: If you do not have an account with Bid Express and you would like to review project information or submit a bid, you will need to register for an account. Go to www.bidexpress.com in order to sign up. 1.4 City of Columbus MBE/WBE Program: This project is NOT subject to the requirements of the City’s MBE/WBE Program. The MBE/WBE goal assigned to this project is 0.0%.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.