Active SLED Opportunity · OREGON · OREGON
AI Summary
Construction services for a pedestrian bridge including erosion control, abutment construction, ADA-compliant ramps, bollard installation, and site restoration in Sheridan, Oregon.
Work includes erosion controls, site security, and ultra-block abutment construction. The Owner-supplied 66,000 lb., 80-foot railcar bridge will be unloaded, set onto abutments, and anchored per Project Drawings. ADA-compliant concrete ramps will be constructed on both sides for accessible entry. Removable bollards will be installed. Project concludes with site cleanup and vegetation restoration. All work per Project Specifications and Drawings. Pre Bid Conference: 120 SW Mill St Sheridan Oregon 97378 7-2-26 10AM-11AM
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.