SLED Opportunity · TEXAS · CITY OF PILOT POINT
AI Summary
City of Pilot Point seeks contractors for electrical and instrumentation & controls systems installation at the Pilot Point Waste Water Treatment Plant. Scope includes installation, commissioning, temporary power, security systems, and site restoration with key milestones in 2027-2028.
This Work Package includes furnishing and installing complete Electrical and Instrumentation & Controls systems for the Project in accordance with the Contract Documents.
Key Scope Elements:
Provide all labor, materials, equipment, and supervision necessary to furnish and install complete Electrical and I&C systems per Plans and Specifications.
Instrumentation & Controls (I&C): Prime Controls, LP will be contracted to provide all I&C programming and commissioning services.
Furnish and install a complete security system, including all devices, cabling, terminations, programming, testing, and commissioning in compliance with applicable codes.
Coordinate all activities with the CMAR and other Work Package Contractors to maintain schedule and installation alignment.
Provide and maintain temporary electrical power for the jobsite, including electrical connections to six (6) construction trailers and two (2) or more power drops as required; coordinate with the City and/or serving utility. Electrical Contractor to remove all temporary installations at Project completion. (Electrical meter usage costs paid by CMAR.)
Furnish one Roll-Off Mover (Rolloffcaddy) (48V, 23,000-lb capacity) or approved equal and provide all required power, wiring, and charging equipment per Contract Documents.
Furnish, assemble, install, and commission a 1,750 kW generator, including all required electrical and instrumentation systems, fuel, servicing, and maintenance until final acceptance.
Furnish, install, and test Variable Frequency Drives (VFDs) as follows:
FEB Return Lift Station – Two (2)
Sludge Pumps – Two (2)
Influent Lift Station – Four (4)
UV System (VTPs) – Two (2)
Obtain and coordinate all required permits, inspections, certificates, and approvals for permanent power installations.
Perform startup, functional testing, commissioning, and operator training for all applicable systems and equipment.
Restore all disturbed areas and utilize the Borrow Area for backfill or disposal of clean spoils, as permitted.
Schedule & Milestones:
Operationally Ready: On or before December 2, 2027 (per Specification 01 75 23).
Electrical & I&C Complete: On or before March 23, 2028.
Failure to meet required milestones or final completion date will result in liquidated damages of $2,500 per day.
Exclusions:
Blowers with VFDs and harmonic filters (provided under WP#05).
Alternates:
None specified.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.