Active SLED Opportunity · ILLINOIS · CITY OF CHAMPAIGN
AI Summary
The City of Champaign seeks a licensed asbestos inspection company to conduct NESHAP pre-demolition asbestos surveys for the Champaign Park Apartments complex prior to demolition. The project includes multiple residential buildings and requires detailed reporting and compliance with environmental standards.
The purpose of this RFP is to secure a Licensed Asbestos Inspection Company to conduct National Emission Standards for Hazardous Air Pollutants (NESHAP) Pre-Demolition asbestos inspections prior to demolition and provide the reports to the City.
The City of Champaign is preparing to move forward with the demolition of the Champaign Park Apartments complex under the terms of a consent decree. This apartment complex is bounded by Kenwood Road to the North, Springfield Avenue to the south, Kenwood Rd to the west, and Country Faior Drive to the east. The complex includes twelve 24-unit buildings, fifteen 12-unit buildings, and a total of 492 individual units. The buildings are 3 floors with tile and mastic on the lower level, and boiler heat. Each building includes a staircase, laundry room, storage room, and boiler room. There currently have not been any asbestos inspections conducted by the City. The Champaign Park Apartments complex contains an office building and pool less than 15 years old, and a guard shack less than 10 years old. The buildings have been boarded. The City will have a contractor to open up a door to the building and the Champaign Police Department will ensure that the buildings are unoccupied prior to the asbestos survey.
Please note: The City of Champaign is committed to web accessibility. This project may contain attachments that may not conform to the Web Content Accessibility Guidelines (WCAG) Version 2.1, Level AA. If you wish to access these materials in an accessible format, please use contact Tim Spear at tim.spear@champaignil.gov to request an accommodation.
The buildings have been boarded. The City will have a contractor to open up a door to the building and the Champaign Police Department will ensure that the buildings are unoccupied prior to the asbestos survey.
A brief company profile describing the chain of command for each person assigned to the project. Document the availability of all persons assigned to the project and whether the Vendor has sufficient resources to complete the project within the City’s time constraints.
Include a narrative or other statement by the firm of its qualifications for the proposed project.
Include the name, address, phone number, website and a contact person for each reference.
Include the name, address, phone number, website and a contact person for each reference.
Acknowledgment of any response to questions or addenda sent by the City. Should the City issue any addenda to the Request for Proposals, the Vendor shall submit acknowledgement of receipt of the addenda in their proposal and the proposal shall be based on all addenda. Any addenda issued by the City shall be considered part of the proposal documents and failure to submit acknowledgement of the receipt of all addenda may be cause for the City to reject the proposal.
By selecting "Please confirm", vendor agrees to this statement.
Please upload your specifications response as a PDF or Word File only.
The selected Vendor will be required to execute an original contract with the City in substantially the form provided. The person or persons signing on behalf of the selected Vendor must be authorized by said Vendor to sign such a contract. If the person signing for the Vendor is not a corporate officer in the case of a corporation, a partner in the case of a partnership, or a member in the case of an LLC, then the Vendor shall provide documentation of that person’s authority to execute the contract on behalf of the Vendor. Acceptable documentation of said authority shall include a resolution adopted by the board of the business entity in question or bylaws of that entity granting said authority, or a cover letter signed by a corporate officer, a partner or a member as the case may be, granting said authority.
A full and valid complement of all standard Vendor warranties should be included. The contract documents shall incorporate all requirements required in this Request and all elements of the Vendor’s proposal. The Vendor’s contract shall state that in the event of a conflict between the requirements of this Request or the Vendor’s contract, the Request requirements shall govern.
By selecting "Please confirm", vendor agrees to the statement.
Please download the below documents, complete, and upload as PDF or Word File only.
Please download the applicable document, complete, and upload as PDF or Word File only.
Please download the below documents, complete, and upload as PDF or Word File only.
1) If you have a current unexpired City of Champaign Affirmative Action Certificate, please upload (as a PDF).
OR
2) If you already have an affirmative action plan - Please download the Affirmative Action Form below, complete, and upload as PDF or Word File only.
OR
3) If you need to create an affirmative action plan - Please download the Affirmative Action Plan below, complete, and upload as PDF or Word File only.
Please download the below documents, complete, and upload as PDF or Word File only.
Please download the below documents, complete, and upload as PDF or Word File only.
Please download the below documents, complete, and upload as PDF or Word File only.
Please download the below documents, complete, and upload as PDF or Word File only.
Please download the below documents, complete, and upload as PDF or Word file only.
Ex: Name, Office Address, Email Address
If they are not listed in your specifications you will need to add them in the Evaluation Module.
By default, only the scoring criteria will be shown. The scoring method and weight will not be shown on the vendor portal.
Proposal bonds are typically required for projects above the administrative limit.
Select the type of project.
If unsure, please contact the Compliance Officer.
If you have not contacted the compliance officer, please do so to know which CDAP form to use.
If Utilization and Workforce goals are applicable, please select both options below. If only Good Faith Efforts, select Option 3. Not Applicable should only be selected if CDAP is not required or has been waived.
Ex: 10 (Do not insert the percentage sign)
Ex: 5 (Do not insert the percentage sign)
Ex. 20 (Do not insert the percentage sign)
Ex: 15 (Do not insert the percentage sign)
Please fill in the blank:
"All proposals submitted in response to this Request shall be irrevocable for a period of _______ (____) days after the Proposal due date and may not be withdrawn by the Vendor during this period."
Answer format: [Number of days in words] (Number of days)
Example: One Hundred Twenty (120)
If unsure which contract to use, please contact the Legal Department.
If unsure which contract to use, please contact the Legal Department.
If unsure, please contact the Legal Department.
Answer "Yes" if planning to upload your specifications. Otherwise, answer "No" if you plan to manually enter or copy/paste specifications.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.