SLED Opportunity · TEXAS · TARRANT REGIONAL WATER DISTRICT

    Pre-Qualifications for Section 2 Phase 2 Pipeline Rehabilitation, Section 4 Phase 1 Pipeline Rehabilitation, and Joint Pipelines Sections 1 & 6

    Issued by Tarrant Regional Water District
    educationSource SoughtTarrant Regional Water DistrictSol. 254043
    Closed
    STATUS
    Closed
    due Apr 22, 2026
    PUBLISHED
    Apr 9, 2026
    Posting date
    JURISDICTION
    Tarrant Regional
    education
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Tarrant Regional Water District seeks Statements of Qualifications for pre-qualification of contractors for pipeline rehabilitation projects in Texas.

    Opportunity details

    Solicitation No.
    254043
    Type / RFx
    Source Sought
    Status
    open
    Level
    education
    Published Date
    April 9, 2026
    Due Date
    April 22, 2026
    NAICS Code
    237110AI guide
    State
    Texas
    Agency
    Tarrant Regional Water District

    Description

    The Tarrant Regional Water District (Owner) is requesting Statements of Qualifications (SOQ) to prequalify Offerors considering submitting a Proposal for the construction of the following Project:

    Pre-Qualifications for Section 2 Phase 2 Pipeline Rehabilitation, Section 4 Phase 1 Pipeline Rehabilitation, and Joint Pipelines Sections 1 & 6

    Project Details

    • Reference ID: 26-092
    • Department: Infrastructure Engineering
    • Department Head: Jason Gehrig (Infrastructure Engineering Director)

    Important Dates

    • Questions Due: 2026-04-17T17:00:00.000Z

    Addenda

    • Addendum #1 (released 2026-04-10T20:19:13.072Z) —

      Update to Section 7.02 C and Table 2

    Submission Requirements

    • Table 1- General Information (required)

      Please download the below documents, complete, and upload.

    • Table 2- Information for Similar Projects (required)

      Please download the below documents, complete, and upload.

    • Table 3- Financial Information (required)

      Please download the below documents, complete, and upload.

    • Article 9- Certification (required)

      Please download the below documents, complete, and upload.

    • Submittal (required)

    Questions & Answers

    Q (Similar Project Experience): Will the Owner consider projects completed as part of a Joint Venture toward the Offeror’s “similar project” experience requirements when the Offeror was a member of the Joint Venture?

    A: If the Offeror is not going to submit as a joint venture again, then they will have to submit an SOQ.


    Q (ROCIP Insurance Appendix): The SOQ references the Owner’s ROCIP Insurance Program Appendix; however, this document does not appear to be included. Please provide the ROCIP appendix or confirm when it will be issued.

    A: This project will not require any of the ROCIP documentation


    Key dates

    1. April 9, 2026Published
    2. April 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.