Active SLED Opportunity · VIRGINIA · VIRGINIA
AI Summary
Prequalification opportunity for Construction Manager at Risk for Campbell Hall renovation at Virginia Tech, including building system upgrades and ADA compliance.
Virginia Techâs 2026-2032 Non-General Fund Capital Outlay Plan includes a capital project to renovate Campbell Hall. The renovation of Campbell Hall will include comprehensive updates to the buildingâs interior, including residential rooms and bathrooms. The project will repair and modernize the building envelope, mechanical, electrical, and plumbing systems, as well as the installation of elevators and air conditioning. The renovation will also ensure compliance with ADAstandards.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.