SLED Opportunity · CONNECTICUT · CONNECTICUT
AI Summary
Prequalification for renovation and installation of a PET-CT system at UConn Health's Connecticut Tower, requiring general building construction prequalification.
UConn Health (UCH) will be renovating approximately 1,200 square feet of the main floor hospital located in the Connecticut Tower (Building H) at 263 Farmington Ave. Farmington, CT including the renovation of existing space to accommodate installation of a new PETCT system and supporting spaces. The spaces will receive layout modifications, new finishes, millwork, imaging equipment, hot lab and modified MEPs. Applicants must be prequalified by the Department of Administrative Services (DAS), for the Classification of GENERAL BUILDING CONSTRUCTION (GROUP C) to participate in this Prequalification Application.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.