Inyo County seeks bids for procurement and installation of commercial laundry equipment at the Sheriff's Office Jail Facility, including removal of old equipment, training, and support. Extensive insurance and compliance requirements apply. Pre-proposal meeting on April 23, 2026; bids due by May 15, 2026.
The Inyo County Sheriff’s Office is soliciting proposals from qualified vendors for the supply, installation, and commissioning of commercial laundry equipment, as well as the removal of existing equipment. The scope of work shall include the purchasing, and installation of two (2) commercial washers and two (2) commercial drying tumblers, all of which must be compatible with the existing wiring. Contractor is to furnish all materials and labor to complete the scope of work in a satisfactory manner.
The optional job walk for April 23, 2026 walk has been cancelled.
Interested bidders can reach out to Marc Lucas at mlucas@inyocounty.us to visit the job site if necessary.
A C-36 licensed contractor in California can bid on this project. All minor electrical work for final connections must be performed by a C-10 California licensed Electrical Contractor. All Contractors shall be registered with the DIR.
Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
Coverage shall be at least as broad as Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
If the Vendor maintains broader coverage and/or higher limits than the minimums shown above, Inyo County requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to Inyo County.
Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 05 09 or 25 04 05 09) or the general aggregate limit shall be twice the required occurrence limit.
Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
The CONTRACTOR must maintain an acceptable cost accounting system. The CONTRACTOR agrees to provide the COUNTY, the Federal Aviation Administration and the Comptroller General of the United States or any of their duly authorized representatives access to any books, documents, papers and records of the CONTRACTOR which are directly pertinent to the specific contract for the purpose of making audit, examination, excerpts and transcriptions. The CONTRACTOR agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed.
The Bidder's bid shall include at a mimimum the following services:
Service Requirements
The successful Bidder shall provide the following services:
Delivery Requirements
The successful Bidder must adhere to the following delivery requirements:
Compliance and Standards
All equipment and services must comply with the following standards:
Bidder Qualifications
Prospective Bidders must meet the following qualifications to be considered:
Bid Submission Requirements
Prospective Bidders must include the following in their bid submission:
Evaluation Criteria
Bids will be evaluated based on the following criteria:
Insurance Services Office Form Number CA 00 01 covering any auto (Code 1), of if Contractor has no owned autos, hired (Code 8) and non-owned (Code 9) autos, with limit no less than $1,000,000 per accident for bodily injury and property damage. The policy must be endorsed to include transportation pollution liability insurance covering materials to be transported by Contractor pursuant to contract. This coverage may also be provided on the contractor’s pollution liability policy.
Any violation or breach of terms of this contract on the part of the CONTRACTOR or its subcontractors may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this agreement.
COUNTY will provide CONTRACTOR written notice that describes the nature of the breach and corrective actions the CONTRACTOR must undertake in order to avoid termination of the contract. COUNTY reserves the right to withhold payments to CONTRACTOR until such time the CONTRACTOR corrects the breach or the COUNTY elects to terminate the contract. The COUNTY’s notice will identify a specific date by which the CONTRACTOR must correct the breach. COUNTY may proceed with termination of the contract if the CONTRACTOR fails to correct the breach by the deadline indicated in the COUNTY’s notice.
The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder are in addition to, and not a limitation of, any duties, obligations, rights and remedies otherwise imposed or available by law.
Insurance Services Office Form Number CA 00 01 covering any auto (Code 1), or if Contractor has no owned autos, covering hired (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage. (Coverage requirement may be waived if Contract scope of work specifies that performance shall be remote.)
Insurance Services Office Form Number CA 00 01 covering any auto (Code 1), with limit no less than $5,000,000 per accident for bodily injury and property damage.
Insurance Services Office Form Number CA 0001 covering any auto (Code 1), or if Consultant has no owned autos, covering hired (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
Self-insured retentions must be declared to and approved by Inyo County. Inyo County may require the Vendor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Inyo County.
Insurance Services Office Form Number CA 00 01 covering any auto (Code 1), hired (Code 8), and non-owned (Code 9) autos, with limit no less than $1,000,000 per accident for bodily injury and property damage. Minimum increases to $5,000,000 if business is authorized to operate vehicles within the restricted area at Bishop Airport.
Insurance Services Office Form Number CA 0001 covering any auto (Code 1), or if Contractor has no owned autos, covering hired (Code 8) and non-owned autos (Code 9), with limit no less than $5,000,000 per accident for bodily injury and property damage.
Insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. (Provision may be waived if Contractor provides written declaration of the following: (a) Contractor has no employees and agrees to obtain workers’ compensation insurance and notify Inyo County if any employee is hired, (b) Contractor agrees to verify proof of coverage for any subcontractor, and (c) Contractor agrees to hold Inyo County harmless and defend Inyo County in the case of claims arising for failure to provide benefits.)
Insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status: Inyo County, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Vendor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Vendor’s insurance at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used.
Primary Coverage: For any claims related to this contract, the Vendor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects Inyo County, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by Inyo County, its officers, officials, employees, or volunteers shall be excess of the Vendor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
Notice of Cancellation: Each insurance policy required above shall state that coverage shall not be canceled, except with notice to Inyo County.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to Inyo County.
Umbrella or Excess Policy: The Vendor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and noncontributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Vendor’s primary and excess liability policies are exhausted.
Verification of Coverage: Vendor shall furnish Inyo County with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements and copies of all Declarations and Endorsements pages are to be received and approved by Inyo County before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Vendor’s obligation to provide them. Inyo County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Waiver of Subrogation: Vendor hereby grants to Inyo County a waiver of any right to subrogation which any insurer of said Vendor may acquire against Inyo County by virtue of the payment of any loss under such insurance. The Vendor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not Inyo County has received a waiver of subrogation endorsement from the insurer.
Special Risks or Circumstances: Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
Insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. (Provision may be waived if Contractor provides written declaration of the following: (a) Contractor has no employees and agrees to obtain workers’ compensation insurance and notify Inyo County if any employee is hired, (b) Contractor agrees to verify proof of coverage for any subcontractor, and (c) Contractor agrees to hold Inyo County harmless and defend Inyo County in the case of claims arising for failure to provide benefits.)
As required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. (Provision may be waived if Contractor provides written declaration of the following: (a) Contractor has no employees and agrees to obtain workers’ compensation insurance and notify Inyo County if any employee is hired, (b) Contractor agrees to verify proof of coverage for any subcontractor, and (c) Contractor agrees to hold Inyo County harmless and defend Inyo County in the case of claims arising for failure to provide benefits.)
Insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
In all its activities within the scope of its airport program, the CONTRACTOR agrees to comply with pertinent statutes, Executive Orders, and such rules as identified in Title VI List of Pertinent Nondiscrimination Acts and Authorities to ensure that no person shall, on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability be excluded from participating in any activity conducted with or benefiting from Federal assistance.
This provision is in addition to that required by Title VI of the Civil Rights Act of 1964.
3-1.04 Contract Award
Section 3-1.04 of the Standard Specifications shall be amended as follows:
Whenever possible, the award to the lowest bidder, if made, will be made no later than thirty (30) calendar days after the opening of bid proposals. However, failure of the County to make award within thirty (30) calendar days after the opening of the bid proposals shall not relieve the Contractor of its requirement to deliver an executed contract and bonds, and any other required documents, within 15 days of Notification of Award, as further described in Section 3-1.18: Contract Execution.
3-1.05 Contract Bonds (Public Contract Code §§ 10221 and 10222)
The successful bidder must furnish 2 bonds:
Payment bond to secure the claim payments of laborers, workers, mechanics, or materialmen providing goods, labor, or services under the Contract. This bond must be equal to at least 100 percent of the Contract amount.
Performance bond to guarantee the faithful performance of the Contract. This bond must be equal to at least 100 percent of the Contract amount.
The bond forms are included in the Attachments.
3-1.06 Contractor License
For a federal-aid contract, the Contractor must be properly licensed as a contractor from contract award through Contract acceptance (Pub Cont Code § 10164).
For a non-federal-aid contract:
The Contractor must be properly licensed as a contractor from bid opening through Contract acceptance (Bus & Prof Code § 7028.15)
Joint venture bidders must obtain a joint venture license before contract award (Bus & Prof Code § 7029.1)
3-1.07 Insurance Policies
The successful bidder must submit a certificate of insurance meeting the requirements in the Insurance Attachment included in this solicitation. If the successful bidder uses any form of self-insurance for workers compensation in lieu of an insurance policy, it shall submit a certificate of consent to self-insure under Labor Code § 3700.
3-1.08 Small Business Enterprise Participation
Section 3-1.08 is amended as follows:
This project is subject to Inyo County Ordinance No. 1258, which creates contracting preferences for local and/or small businesses, and is codified in Inyo County Code Chapter 6.06.
The bidder must:
Take necessary and reasonable steps to ensure that small business enterprises (SBEs) have opportunity to participate in the contract.
Make work available to SBEs and select work parts consistent with available SBE subcontractors and suppliers.
To qualify for the SBE contracting preference, the bidder must show that he/she is a SBE as described in Inyo County Code Section 6.06.020 or that the subcontractor(s) proposed for work on the project is/are a SBE(s) as described in Inyo County CodeSection 6.06.020.
It is the bidders’ responsibility to verify that the SBE(s) is certified as a small business enterprise at the date of bid opening.
SBE CONTRACTING PREFERENCE COMMITMENT SUBMITTAL:
If the bidder is claiming the SBE contracting preference via subcontractors, the bidder must submit SBE information on the “Small Business Enterprise Commitment” form included in the Attachments.
The bidder must Submit written confirmation from each SBE subcontractor stating that it is participating in the contract. Include confirmation with the SBE Commitment form. A copy of a SBE subcontractor’s quote will serve as written confirmation that the SBE is participating in the contract.
SUBCONTRACTOR AND SBE RECORDS:
The Contractor shall maintain records showing the name and business address of each firsttier subcontractor. The records shall also show the name and business address of every SBE subcontractor, SBE vendor of materials and SBE trucking company, regardless of tier. The records shall show the date of payment and the total dollar figure paid to all of these firms. SBE prime contractors shall also show the date of work performed by their own forces along with the corresponding dollar value of the work.
Upon completion of the contract, a summary of these records shall be prepared on “Final Report – Utilization of Small Business Enterprises - (SBE), First-Tier Subcontractors,” certified correct by the Contractor or his authorized representative, and submitted to the Engineer. The form shall be furnished to the Engineer within 90 days from the date of contract acceptance.
3-1.18 Contract Execution
The successful bidder must sign the Contract form.
The successful bidder must deliver two (2) fully executed (except for the County’s signature) to the Office Engineer:
Signed Contract form
Contract bonds
Documents identified in section 3-1.07
Payee Data Record
Small Business (SB) Participation Report form
For a federal-aid contract, Caltrans Bidder - DBE Information form
The Office Engineer must receive these documents before the 10th business day after the bidder receives the contract.
The bidder's security may be forfeited for failure to execute the contract within the time specified (Pub Cont Code §§ 10181, 10182, and 10183).
A copy of the Contract form is included as an attachment to the bid package.
Insurance appropriate to the Contractor’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. (If applicable. Professional liability insurance coverage is normally required if the contractor is providing a professional service regulated by the state, though Inyo County may require professional liability coverage from certain other types of service providers.)
Compliance with Nondiscrimination Requirements:
During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “Contractor”), agrees as follows:
Title VI List of Pertinent Nondiscrimination Acts and Authorities
During the performance of this contract, the CONTRACTOR, for itself, its assignees, and successors in interest (hereinafter referred to as the “CONTRACTOR”) agrees to comply with the following non-discrimination statutes and authorities; including but not limited to:
Insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.
Applicable to underground or above ground fuel storage tanks, fueling or refueling operations with a limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year. This policy shall include coverage for bodily injury, property damage, personal injury, and environmental site restoration, including fines and penalties in accordance with applicable EPA or state regulations.
Insurance applicable to the work being performed, with limits no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate per policy period of one year.
Section 7 of the Standard Specifications are amended to read as follows:
7-1.02K(2) Wages
The general prevailing wage rates, determined by the Department of Industrial Relations, for Inyo County, are available at the County of Inyo address or the California DIR web site at http://www.dir.ca.gov. Changes are available at the same locations. These wage rates are not included in the Contract Documents. All labor will be paid at not less than these minimum wage rates.
7-1.02K(3) Certified Payroll Records (Labor Code §1776)
Contractor must keep accurate payroll records, and submit a copy of your certified payroll records weekly, including those of subcontractors to the following:
Include in the certified payroll:
1. Each employee's:
1.1. Full name
1.2. Address
1.3. Social security number
1.4. Work classification
1.5. Straight time and overtime hours worked each day and week
1.6. Actual wages paid for each day to each:
1.6.1. Journeyman
1.6.2. Apprentice
1.6.3. Worker
1.6.4. Other employee you employ for the work
1.7. Pay rate
1.8. Itemized deductions made
1.9. Check number issued
2. Apprentices and the apprentice-to-journeyman ratio
3. A Statement of Compliance signed under penalty of perjury that declares:
The information contained in the payroll record is true, correct, and complete
The employer has complied with the requirements of sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project
The wage rates paid are at least those required by the Contract
7-1.05 Indemnification
Contractor shall hold harmless, defend, and indemnify the County of Inyo and its officers, officials, employees, and volunteers from and against all claims, damages, losses, and expenses including attorney fees and litigation costs, arising out of the performance of the work described herein, caused in whole or in part by any negligent act or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the County.
Insurance appropriate to the Consultant’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate.
If the CGL policy referenced above is not endorsed to include affirmative coverage for sexual abuse or molestation, Contractor shall obtain and maintain a policy covering Sexual Abuse and Molestation with a limit no less than $1,000,000 per occurrence.
with a limit not less than $1,000,000 combined single limit per occurrence and $1,000,000 aggregate.
As described in bid package.
If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, Inyo County requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to Inyo County.
If the Contractor maintains broader coverage and/or higher limits than the minimums shown above, Inyo County requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to Inyo County.
(Applies to ambulance and related services.)
With Medical Malpractice Errors & Omissions, with limit no less than $3,000,000 per occurrence or claim. (Applies to ambulance and related services.)
Amended to read as follows:
8-1.05 Time
The Contractor shall complete all designated portions of the work required to be provided pursuant to the contract no later than 30 from and including the Starting Date, plus such additional days, if any, which are expressly granted as extensions of time by Contract Change Orders signed and issued by the County. Such total number of days shall be referred to herein as the “Time for Completion.”
Failure of the Contractor to perform any covenant or condition contained in the Contract Documents within the time period specified shall constitute material breach of this Contract entitling the County to terminate the Contract unless the Contractor applies for, and receives, an extension of time in accordance with the procedures set forth in Section 8-107B SS, “Time Adjustments.”
8-1.10 Liquidated Damages
In accordance with Government Code Section 53069.85, the Contractor shall pay to the County of Inyo, liquidated damages in the amounts of:
100 for each and every calendar day or working day (as laid out in the contract documents) delay in finishing work in excess of the Time for Completion specified.
The County shall be entitled to deduct the amounts of liquidated damages from any payment otherwise due to the Contractor.
CONTRACTOR agrees to comply with all applicable standards, orders, and regulations issued pursuant to the Clean Air Act (42 USC § 740-7671q) and the Federal Water Pollution Control Act as amended (33 USC § 1251-1387). The CONTRACTOR agrees to report any violation to the COUNTY immediately upon discovery. The COUNTY assumes responsibility for notifying the Environmental Protection Agency (EPA) and the Federal Aviation Administration.
CONTRACTOR must include this requirement in all subcontracts that exceeds $150,000.
If the Contractor maintains broader coverage and/or higher limits than the minimums shown above, Inyo County requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to Inyo County.
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status: Inyo County, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).
Primary Coverage: For any claims related to this contract, the Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects Inyo County, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by Inyo County, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
Notice of Cancellation: Each insurance policy required above shall state that coverage shall not be canceled, except with notice to Inyo County.
Umbrella or Excess Policy: The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, includes, but not limited to, primary and noncontributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor’s primary and excess liability policies are exhausted.
Waiver of Subrogation: Contractor hereby grants to Inyo County a waiver of any right to subrogation which any insurer of said Contractor may acquire against Inyo County by virtue of the payment of any loss under such insurance. The contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not Inyo County has received a waiver of subrogation endorsement from the insurer.
Self-Insured Retentions: Self-insured retentions must be declared to and approved by Inyo County. Inyo County may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Inyo County. The CGL and any policies, including Excess liability policies, may not be subject to a self-insured retention (SIR) or deductible that exceeds $25,000 unless approved in writing by Inyo County. Any and all deductibles and SIRs shall be the sole responsibility of the Contractor or subcontractor who procured such insurance and shall not apply to the Indemnified Additional Insured Parties. Inyo County may deduct from any amounts otherwise due Contractor to fund the SIE/deductible. Policies shall not contain any self-insured retention (SIR) provision that limits the satisfaction pf the SIR to the Named. The policy must also provide that Defense costs, including ALAE, will satisfy the SIR or deductible. Inyo County reserves the right to obtain a copy of any policies and endorsements for verification.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to Inyo County.
Claims Made Policies: If any of the required policies provide coverage on a claims-made basis:
Verification of Coverage: Contractor shall furnish Inyo County with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements and copies of all Declarations and Endorsements pages are to be received and approved by Inyo County before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. Inyo County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Special Risks or Circumstances: Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Insurance appropriate to the Contractor’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate.
(Applies to transport of live animals.)
With limit no less than $1,000,000 per occurrence or claim.
Self-insured retentions must be declared to and approved by Inyo County. Inyo County may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Inyo County. The CGL and any policies, including Excess liability policies, may not be subject to a self-insured retention (SIR) or deductible that exceeds $25,000 unless approved in writing by Inyo County. Any and all deductibles and SIRs shall be the sole responsibility of the Contractor or subcontractor who procured such insurance and shall not apply to the Indemnified Additional Insured Parties. Inyo County may deduct from any amounts otherwise due Contractor to fund the SIE/deductible. Policies shall not contain any self-insured retention (SIR) provision that limits the satisfaction pf the SIR to the Named. The policy must also provide that Defense costs, including ALAE, will satisfy the SIR or deductible. Inyo County reserves the right to obtain a copy of any policies and endorsements for verification.
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status: Inyo County, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).
Primary Coverage: For any claims related to this contract, the Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects Inyo County, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by Inyo County, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
Notice of Cancellation: Each insurance policy required above shall state that coverage shall not be canceled, except with notice to Inyo County.
Umbrella or Excess Policy: The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute toa loss until the Contractor’s primary and excess liability policies are exhausted.
Waiver of Subrogation: Contractor hereby grants to Inyo County a waiver of any right to subrogation which any insurer of said Contractor may acquire against Inyo County by virtue of the payment of any loss under such insurance. The contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not Inyo County has received a waiver of subrogation endorsement from the insurer.
Self-Insured Retentions: Self-insured retentions must be declared to and approved by Inyo County. Inyo County may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Inyo County. The CGL and Professional Liability policies must provide that defense costs, including ALAE, will satisfy the SIR or deductible.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to Inyo County.
Claims Made Policies: If any of the required policies provide coverage on a claims-made basis:
Verification of Coverage: Contractor shall furnish Inyo County with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements and copies of all Declarations and Endorsements pages are to be received and approved by Inyo County before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. Inyo County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Special Risks or Circumstances: Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
If the contract is with any Vendor/Contractor/Operator that may provide IT services or software or that might involve the retention of private, non-public information about third parties then the following is also included:
Cyber Liability Insurance, with limits not less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Vendor/Contractor/Operator in this agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion and network security. The policy shall provide coverage for breach response costs as well as regulatory fines and penalties as well as credit monitoring expenses with limits sufficient to respond to these obligations.
Applicable to the work being performed, with limits no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate per policy period of one year. (Applies if transporting hazmat)
If the contract is with a Tenant or General Lessee, then the following is also included:
Property Insurance: Tenant/Lessee shall maintain not less than $1,000,000 Legal Liability Coverage (ISO Form CP 00 40 or equivalent) on all real property being leased, including improvements and betterments owned or leased by Inyo County, and shall name Inyo County as a loss payee. Tenant/Lessee shall also provide property insurance on all personal property and betterments and improvements contained within or on the leased premises. The policy must be written on an “all risks” replacement cost basis, excluding earthquake and flood, with no more than a ninety (90) percent co-insurance requirement, and Tenant/Lessee shall name Inyo County as a loss payee for its interest in the property.
Contractor must comply with the requirements of the Copeland “Anti-Kickback” Act (18 USC 874 and 40 USC 3145), as supplemented by Department of Labor regulation 29 CFR part 3. Contractor and subcontractors are prohibited from inducing, by any means, any person employed on the project to give up any part of the compensation to which the employee is entitled. The Contractor and each Subcontractor must submit to the COUNTY, a weekly statement on the wages paid to each employee performing on covered work during the prior week. COUNTY must report any violations of the Act to the Federal Aviation Administration.
The General Liability, Automobile Liability, Contractors Pollution Liability and/or Asbestos Pollution policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status: Inyo County, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).
Primary Coverage: For any claims related to this contract, the Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects Inyo County, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by Inyo County, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
Notice of Cancellation: Each insurance policy required above shall state that coverage shall not be canceled, except with notice to Inyo County.
The Automobile Liability policy shall be endorsed to include Transportation Pollution Liability insurance, covering materials to be transported by Contractor pursuant to the contract. This coverage may also be provided on the Contractors Pollution Liability policy.
If the General Liability, Contractors Pollution Liability and/or Asbestos Pollution and/or Errors & Omissions coverages are written on a claims-made form:
Umbrella or Excess Policy: The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, includes, but not limited to, primary and noncontributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor’s primary and excess liability policies are exhausted.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable to Inyo County.
Verification of Coverage: Contractor shall furnish Inyo County with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements and copies of all Declarations and Endorsements pages are to be received and approved by Inyo County before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. Inyo County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Waiver of Subrogation: Contractor hereby grants to Inyo County a waiver of any right to subrogation which any insurer of said Contractor may acquire against Inyo County by virtue of the payment of any loss under such insurance. The contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not Inyo County has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of Inyo County for all work performed by the Contractor, its employees, agents, and subcontractors.
Subcontractors: Contractor shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and Contractor shall ensure Inyo County is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13.
Duration of Coverage: CGL and Excess liability policies for any construction related work, including, but not limited to, maintenance, service, or repair work, shall continue coverage for a minimum of 5 years for Completed Operations liability coverage. Such insurance must be maintained, and evidence of insurance must be provided for at least five years after completion of the contract of work.
Special Risks or Circumstances: Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.
(Applies to projects with environmental hazards)
Insurance with limits no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate.
Lessee shall, at its sole cost and expense, maintain business interruption insurance by which the minimum monthly rent will be paid to Lessor (Inyo County) for a period of up to one (1) year if the premises are destroyed or rendered inaccessible by a risk insured against by a policy of standard fire and extended coverage insurance, with vandalism and malicious mischief endorsements.
1. Minimum Wages.
(i) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by the Secretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalent thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics.
Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (1)(iv) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR § 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, that the employer’s payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under (1)(ii) of this section) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the site of the work in a prominent and accessible place where it can easily be seen by the workers.
(ii)(A) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met:
(1) The work to be performed by the classification requested is not performed by a classification in the wage determination;
(2) The classification is utilized in the area by the construction industry; and
(3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(B) If the Contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
(C) In the event the Contractor, the laborers, or mechanics to be employed in the classification, or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
(D) The wage rate (including fringe benefits where appropriate) determined pursuant to subparagraphs (1)(ii) (B) or (C) of this paragraph, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
(iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.
(iv) If the Contractor does not make payments to a trustee or other third person, the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, that the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
2. Withholding. The Federal Aviation Administration or the Sponsor shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the Contractor under this contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the Federal Aviation Administration may, after written notice to the Contractor, Sponsor, Applicant, or COUNTY, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
3. Payrolls and Basic Records.
(i) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker; his or her correct classification; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 1(b)(2)(B) of the Davis-Bacon Act); daily and weekly number of hours worked; deductions made; and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the Contractor shall maintain records that show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual costs incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
(ii)(A) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Federal Aviation Administration if the agency is a party to the contract, but if the agency is not such a party, the Contractor will submit the payrolls to the applicant, Sponsor, or COUNTY, as the case may be, for transmission to the Federal Aviation Administration. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR § 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee’s social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division Web site at https://www.dol.gov/agencies/whd/government-contracts/construction/payroll-certification or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker and shall provide them upon request to the Federal Aviation Administration if the agency is a party to the contract, but if the agency is not such a party, the Contractor will submit them to the applicant, Sponsor, or COUNTY, as the case may be, for transmission to the Federal Aviation Administration, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the sponsoring government agency (or the applicant, Sponsor, or COUNTY).
(B) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following:
(1) That the payroll for the payroll period contains the information required to be provided under 29 CFR § 5.5(a)(3)(ii), the appropriate information is being maintained under 29 CFR § 5.5 (a)(3)(i), and that such information is correct and complete;
(2) That each laborer and mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR Part 3;
(3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.
(C) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the “Statement of Compliance” required by paragraph (3)(ii)(B) of this section.
(D) The falsification of any of the above certifications may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 231 of Title 31 of the United States Code.
(iii) The Contractor or subcontractor shall make the records required under paragraph (3)(i) of this section available for inspection, copying, or transcription by authorized representatives of the Sponsor, the Federal Aviation Administration, or the Department of Labor and shall permit such representatives to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit the required records or to make them available, the Federal agency may, after written notice to the Contractor, Sponsor, applicant, or COUNTY, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR § 5.12.
4. Apprentices and Trainees.
(i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman’s hourly rate) specified in the Contractor’s or subcontractor’s registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice’s level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(ii) Trainees. Except as provided in 29 CFR § 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination that provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate that is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(iii) Equal Employment Opportunity. The utilization of apprentices, trainees, and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR Part 30.
5. Compliance with Copeland Act Requirements.
The Contractor shall comply with the requirements of 29 CFR Part 3, which are incorporated by reference in this contract.
6. Subcontracts.
The Contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR §§ 5.5(a)(1) through (10) and such other clauses as the Federal Aviation Administration may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR § 5.5.
7. Contract Termination: Debarment.
A breach of the contract clauses in paragraph 1 through 10 of this section may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR § 5.12.
8. Compliance with Davis-Bacon and Related Act Requirements.
All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR Parts 1, 3, and 5 are herein incorporated by reference in this contract.
9. Disputes Concerning Labor Standards.
Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR Parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.
10. Certification of Eligibility.
(i) By entering into this contract, the Contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the Contractor’s firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR § 5.12(a)(1).
(ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR § 5.12(a)(1).
(iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 USC § 1001.
If the Contractor maintains broader coverage and/or higher limits than the minimums shown above, Inyo County requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to Inyo County.
If the Contractor maintains broader coverage and/or higher limits than the minimums shown above, Inyo County requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor.
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status: Inyo County, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy, and SAM policy if SAM applies, with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).
Primary Coverage: For any claims related to this contract, the Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects Inyo County, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by Inyo County, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
Umbrella or Excess Policy: The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General liability insurance.
Notice of Cancellation: Each insurance policy required above shall state that coverage shall not be canceled, except with notice to Inyo County.
Waiver of Subrogation: Contractor hereby grants to Inyo County a waiver of any right to subrogation which any insurer of said Contractor may acquire against Inyo County by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not Inyo County has received a waiver of subrogation endorsement from the insurer.
Self-Insured Retentions: Self-insured retentions must be declared to and approved by Inyo County. Inyo County may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Inyo County. The CGL and any policies, including Excess liability policies, may not be subject to a self-insured retention (SIR) or deductible that exceeds $25,000 unless approved in writing by Inyo County.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in California with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to Inyo County.
Claims Made Policies: If any of the required policies provide coverage on a claims-made basis:
Verification of Coverage: Contractor shall furnish Inyo County with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements and copies of all Declarations and Endorsements pages are to be received and approved by Inyo County before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. Inyo County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Special Risks or Circumstances: Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
In accordance with Executive Order 13513, “Federal Leadership on Reducing Text Messaging While Driving”, (10/1/2009) and DOT Order 3902.10, “Text Messaging While Driving”, (12/30/2009), the Federal Aviation Administration encourages recipients of Federal grant funds to adopt and enforce safety policies that decrease crashes by distracted drivers, including policies to ban text messaging while driving when performing work related to a grant or subgrant.
In support of this initiative, the COUNTY encourages the Contractor to promote policies and initiatives for its employees and other work personnel that decrease crashes by distracted drivers, including policies that ban text messaging while driving motor vehicles while performing work activities associated with the project. The Contractor must include the substance of this clause in all sub-tier contracts exceeding $10,000 that involve driving a motor vehicle in performance of work activities associated with the project.
Self-insured retentions must be declared to and approved by Inyo County. Inyo County may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Inyo County. The CGL and any policies, including Excess liability policies, may not be subject to a self-insured retention (SIR) or deductible that exceeds $25,000 unless approved in writing by Inyo County. Any and all deductibles and SIRs shall be the sole responsibility of the Contractor or subcontractor who procured such insurance and shall not apply to the Indemnified Additional Insured Parties. Inyo County may deduct from any amounts otherwise due Contractor to fund the SIE/deductible. Policies shall not contain any self-insured retention (SIR) provision that limits the satisfaction pf the SIR to the Named. The policy must also provide that Defense costs, including ALAE, will satisfy the SIR or deductible. Inyo County reserves the right to obtain a copy of any policies and endorsements for verification.
If the Vendor/Contractor/Operator maintains broader coverage and/or higher limits than the minimums shown above, Inyo County requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Vendor/Contractor/Operator. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to Inyo County.
During the performance of this contract, the CONTRACTOR agrees as follows:
(1) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, sexual orientation, gender identify, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff, or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
(2) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
(3) The contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the contractor's legal duty to furnish information.
(4) The Contractor will send to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, a notice to be provided by the agency contracting officer, advising the labor union or workers’ representative of the Contractor’s commitments under this section 202 of Executive Order 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
(5) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
(6) The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
(7) In the event of the Contractor’s noncompliance with the nondiscrimination clauses of this contract or with any such rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
(8) The Contractor will include the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action with respect to any subcontract or purchase order as may be directed by the Secretary of Labor as a means of enforcing such provisions, including sanctions for noncompliance: Provided, however, that in the event the contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction, the Contractor may request the United States to enter into such litigation to protect the interests of the United States.
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status: Inyo County, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).
Primary Coverage: For any claims related to this contract, the Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects Inyo County, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by Inyo County, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
Notice of Cancellation: Each insurance policy required above shall state that coverage shall not be canceled, except with notice to Inyo County.
Builder’s Risk (Course of Construction) Insurance: Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name Inyo County as a loss payee as their interest may appear. If the project does not involve new or major reconstruction, at the option of Inyo County, as Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversation, or adjustment to existing buildings, structures, processes, machinery, and equipment. The Property Installation Floater shall provider property damage coverage for any building, structure, machinery, or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at Inyo County’s site.
Claims Made Policies: If any of the required policies provide coverage on a claims-made basis:
Umbrella or Excess Policy: The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, includes, but not limited to, primary and noncontributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor’s primary and excess liability policies are exhausted.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable to Inyo County.
Waiver of Subrogation: Contractor hereby grants to Inyo County a waiver of any right to subrogation which any insurer of said Contractor may acquire against Inyo County by virtue of the payment of any loss under such insurance. The contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not Inyo County has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of Inyo County for all work performed by the Contractor, its employees, agents, and subcontractors.
Verification of Coverage: Contractor shall furnish Inyo County with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements and copies of all Declarations and Endorsements pages are to be received and approved by Inyo County before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. Inyo County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Subcontractors: Contractor shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and Contractor shall ensure Inyo County is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13.
Duration of Coverage: CGL and Excess liability policies for any construction related work, including, but not limited to, maintenance, service, or repair work, shall continue coverage for a minimum of 5 years for Completed Operations liability coverage. Such insurance must be maintained, and evidence of insurance must be provided for at least five years after completion of the contract of work.
Surety Bonds: Contractor shall provide the following Surety Bonds in accordance with the bid package: bid, performance, payment, and maintenance. The payment bond and the performance bond shall be in a sum equal to the contract price. If the performance bond provides for a one-year warranty, a separate maintenance bond is not necessary. If the warranty period specified in the contract is for longer than one year, a maintenance bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the state of California and secured through an authorized agent with an office in California.
Special Risks or Circumstances: Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.
Self-insured retentions must be declared to and approved by Inyo County. Inyo County may require the Vendor/Contractor/Operator to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Inyo County.
The General Liability, Automobile Liability, Hanger Keepers Liability, Pollution Legal Liability and Remediation, policies are to contain, or be endorsed to contain, the following provisions:
The Automobile Liability policy shall be endorsed to include Transportation Pollution Liability insurance, covering materials to be transported by Vendor/Contractor/Operator pursuant to the contract. This coverage may also be provided as part of the Pollution Legal Liability and Remediation policy.
Claims Made Policies: If the Airport Liability, General Liability, Pollution Legal Liability and Remediation policy and/or Errors & Omissions coverages are written on a claims-made form:
Umbrella or Excess Policy: The Vendor/Contractor/Operator may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and non-contributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General Liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Vendor/Contractor/Operator’s primary and excess liability policies are exhausted.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A:VII.
Verification of Coverage: Vendor/Contractor/Operator shall furnish Inyo County with original Certificates of Insurance and amendatory endorsements, or copies of the applicable policy language effecting coverage required by this clause and a copy of the Declarations and Endorsement Pages of the CGL and any Excess policies listing all policy endorsements. All certificates and endorsements and copies of the Declarations & Endorsements pages are to be received and approved by Inyo County Risk Management (Risk@inyocounty.us) before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Vendor/Contractor/Operator obligation to provide them. Inyo County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Waiver of Subrogation: Vendor/Contractor/Operator hereby grants to Inyo County a waiver of subrogation which any insurer may acquire against Inyo County, its officers, officials, employees, and volunteers, from Vendor/Contractor/Operator by virtue of the payment of any loss. Vendor/Contractor/ Operator agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not Inyo County has received a waiver of subrogation endorsement from the insurer.
The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of Inyo County for all work performed by the Vendor/Contractor/Operator, its employees, agents, and subcontractors.
Subcontractors: Vendor/Contractor/Operator shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Vendor/Contractor/ Operator shall ensure that Inyo County is an additional insured on insurance required from subcontractors. For CGL coverage subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.
Special Risks or Circumstances: Inyo County reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
1. The Offeror’s or Bidder’s attention is called to the “Equal Opportunity Clause” and the “Standard Federal Equal Employment Opportunity Construction Contract Specifications” set forth herein.
2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Timetables
Goals for minority participation for each trade: 24.5%
Goals for female participation in each trade: 6.9%
These goals are applicable to all of the Contractor’s construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and nonfederally involved construction.
The Contractor’s compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.
3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.
4. As used in this notice and in the contract resulting from this solicitation, the “covered area” is Inyo County, CA.
1. As used in these specifications:
a. “Covered area” means the geographical area described in the solicitation from which this contract resulted;
b. “Director” means Director, Office of Federal Contract Compliance Programs (OFCCP), U.S. Department of Labor, or any person to whom the Director delegates authority;
c. “Employer identification number” means the Federal social security number used on the Employer’s Quarterly Federal Tax Return, U.S. Treasury Department Form 941;
d. “Minority” includes:
(1) Black (all persons having origins in any of the Black African racial groups not of Hispanic origin);
(2) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race);
(3) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and
(4) American Indian or Alaskan native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).
2. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted.
3. If the Contractor is participating (pursuant to 41 CFR part 60-4.5) in a Hometown Plan approved by the U.S. Department of Labor in the covered area either individually or through an association, its affirmative action obligations on all work in the Plan area (including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. Contractors must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each contractor or subcontractor participating in an approved plan is individually required to comply with its obligations under the EEO clause and to make a good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other contractors or subcontractors toward a goal in an approved Plan does not excuse any covered contractor’s or subcontractor’s failure to take good faith efforts to achieve the Plan goals and timetables.
4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 7a through 7p of these specifications. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Covered construction contractors performing construction work in a geographical areas where they do not have a Federal or federally assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any Office of Federal Contract Compliance Programs office or from Federal procurement contracting officers. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified.
5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the Contractor has a collective bargaining agreement, to refer either minorities or women shall excuse the Contractor’s obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto.
6. In order for the nonworking training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees must be employed by the Contractor during the training period, and the Contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor.
7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor’s compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following:
a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the Contractor’s employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents, and other onsite supervisory personnel are aware of and carry out the Contractor’s obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.
b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations’ responses.
c. Maintain a current file of the names, addresses, and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source, or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefor, along with whatever additional actions the Contractor may have taken.
d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor’s efforts to meet its obligations.
e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor’s employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 7b above.
f. Disseminate the Contractor’s EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed.
g. Review, at least annually, the company’s EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination, or other employment decisions including specific review of these items with onsite supervisory personnel such superintendents, general foremen, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter.
h. Disseminate the Contractor’s EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the Contractor’s EEO policy with other contractors and subcontractors with whom the Contractor does or anticipates doing business.
i. Direct its recruitment efforts, both oral and written, to minority, female, and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the Contractor’s recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.
j. Encourage present minority and female employees to recruit other minority persons and women and, where reasonable, provide after school, summer, and vacation employment to minority and female youth both on the site and in other areas of a contractor’s work force.
k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR part 60-3.
l. Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel, for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities.
m. Ensure that seniority practices, job classifications, work assignments, and other personnel practices do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the Contractor’s obligations under these specifications are being carried out.
n. Ensure that all facilities and company activities are nonsegregated except that separate or single-user toilet and necessary changing facilities shall be provided to assure privacy between the sexes.
o. Document and maintain a record of all solicitations of offers for subcontracts from minority and female construction contractors and suppliers, including circulation of solicitations to minority and female contractor associations and other business associations.
p. Conduct a review, at least annually, of all supervisor’s adherence to and performance under the Contractor’s EEO policies and affirmative action obligations.
8. Contractors are encouraged to participate in voluntary associations, which assist in fulfilling one or more of their affirmative action obligations (7a through 7p). The efforts of a contractor association, joint contractor-union, contractor-community, or other similar group of which the Contractor is a member and participant may be asserted as fulfilling any one or more of its obligations under 7a through 7p of these specifications provided that the Contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the Contractor’s minority and female workforce participation, makes a good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the Contractor. The obligation to comply, however, is the Contractor’s and failure of such a group to fulfill an obligation shall not be a defense for the Contractor’s noncompliance.
9. A single goal for minorities and a separate single goal for women have been established. The Contractor, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation of the Executive Order if a particular group is employed in a substantially disparate manner (for example, even though the Contractor has achieved its goals for women generally, the Contractor may be in violation of the Executive Order if a specific minority group of women is underutilized).
10. The Contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race, color, religion, sex, sexual orientation, gender identity, or national origin.
11. The Contractor shall not enter into any subcontract with any person or firm debarred from Government contracts pursuant to Executive Order 11246.
12. The Contractor shall carry out such sanctions and penalties for violation of these specifications and of the Equal Opportunity Clause, including suspension, termination, and cancellation of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended, and its implementing regulations, by the Office of Federal Contract Compliance Programs. Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246, as amended.
13. The Contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps, at least as extensive as those standards prescribed in paragraph 7 of these specifications, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the Contractor fails to comply with the requirements of the Executive Order, the implementing regulations, or these specifications, the Director shall proceed in accordance with 41 CFR part 60-4.8.
14. The Contractor shall designate a responsible official to monitor all employment related activity to ensure that the company EEO policy is being carried out, to submit reports relating to the provisions hereof as may be required by the Government, and to keep records. Records shall at least include for each employee, the name, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records.
15. Nothing herein provided shall be construed as a limitation upon the application of other laws which establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g. those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program).
The Bidder or Offeror certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
All contracts and subcontracts that result from this solicitation incorporate by reference the requirements of 29 CFR Part 1910 with the same force and effect as if given in full text. The employer must provide a work environment that is free from recognized hazards that may cause death or serious physical harm to the employee. The employer retains full responsibility to monitor its compliance and their subcontractor’s compliance with the applicable requirements of the Occupational Safety and Health Act of 1970 (20 CFR Part 1910). The employer must address any claims or disputes that pertain to a referenced requirement directly with the U.S. Department of Labor – Occupational Safety and Health Administration.
CONTRACTOR and subcontractor agree to comply with Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, and the regulatory provisions of 40 CFR Part 247. In the performance of this contract and to the extent practicable, the CONTRACTOR and subcontractors are to use products containing the highest percentage of recovered materials for items designated by the Environmental Protection Agency (EPA) under 40 CFR Part 247 whenever:
The list of EPA-designated items is available at www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products.
Section 6002(c) establishes exceptions to the preference for recovery of EPA-designated products if the CONTRACTOR can demonstrate the item is:
a) Not reasonably available within a timeframe providing for compliance with the contract performance schedule;
b) Fails to meet reasonable contract performance requirements; or
c) Is only available at an unreasonable price.
The COUNTY may terminate this contract in whole or in part at any time by providing written notice to the CONTRACTOR. Such action may be without cause and without prejudice to any other right or remedy of COUNTY. Upon receipt of a written notice of termination, except as explicitly directed by the COUNTY, the CONTRACTOR shall immediately proceed with the following obligations regardless of any delay in determining or adjusting amounts due under this clause:
COUNTY agrees to pay CONTRACTOR for:
COUNTY will not pay CONTRACTOR for loss of anticipated profits or revenue or other economic loss arising out of or resulting from the COUNTY’s termination action.
The rights and remedies this clause provides are in addition to any other rights and remedies provided by law or under this contract.
Section 80-09 of FAA Advisory Circular 150/5370-10 establishes standard language for conditions, rights, and remedies associated with COUNTY termination of this contract for cause due to default of the Contractor.
In the employment of labor (excluding executive, administrative, and supervisory positions), the CONTRACTOR and all sub-tier CONTRACTORs must give preference to covered veterans as defined within Title 49 United States Code Section 47112. Covered veterans include Vietnam-era veterans, Persian Gulf veterans, Afghanistan-Iraq war veterans, disabled veterans, and small business concerns (as defined by 15 USC 632) owned and controlled by disabled veterans. This preference only applies when there are covered veterans readily available and qualified to perform the work to which the employment relates.
Contractor and Subcontractor agree to comply with mandatory standards and policies relating to use and procurement of certain telecommunications and video surveillance services or equipment in compliance with the National Defense Authorization Act [Public Law 115-232 § 889(f)(1)].
By submission of an offer, the Offeror certifies that with respect to this solicitation and any resultant contract, the Offeror –
This certification concerns a matter within the jurisdiction of an agency of the United States of America and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18 USC § 1001.
The Offeror/Contractor must provide immediate written notice to the Owner if the Offeror/Contractor learns that its certification or that of a subcontractor was erroneous when submitted or has become erroneous by reason of changed circumstances. The Contractor must require subcontractors provide immediate written notice to the Contractor if at any time it learns that its certification was erroneous by reason of changed circumstances.
Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with 49 CFR § 30.17, no contract shall be awarded to an Offeror or subcontractor:
Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by this provision. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
The Offeror agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in all lower tier subcontracts. The Contractor may rely on the certification of a prospective subcontractor that it is not a firm from a foreign country included on the list of countries that discriminate against U.S. firms as published by USTR, unless the Offeror has knowledge that the certification is erroneous.
This certification is a material representation of fact upon which reliance was placed when making an award. If it is later determined that the Contractor or subcontractor knowingly rendered an erroneous certification, the Federal Aviation Administration (FAA) may direct through the Owner cancellation of the contract or subcontract for default at no cost to the Owner or the FAA.
A. Contract Assurance (49 CFR § 26.13)
The Contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the Contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:
B. Prompt Payment (49 CFR § 26.29)
The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than 30 days from the receipt of each payment the prime contractor receives from Inyo County. The prime contractor agrees further to return retainage payments to each subcontractor within 30 days after the subcontractor’s work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of Inyo County. This clause applies to both DBE and non-DBE subcontractors.
C. Termination of DBE Subcontracts (49 CFR § 26.53(f))
The prime contractor must not terminate a DBE subcontractor listed in response to the DBE requirements listed on page two of the Notice Inviting Bids (or an approved substitute DBE firm) without prior written consent of Inyo County. This includes, but is not limited to, instances in which the prime contractor seeks to perform work originally designated for a DBE subcontractor with its own forces or those of an affiliate, a non-DBE firm, or with another DBE firm.
The prime contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains written consent Inyo County. Unless Inyo County consent is provided, the prime contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE.
Inyo County may provide such written consent only if Inyo County agrees, for reasons stated in the concurrence document, that the prime contractor has good cause to terminate the DBE firm. For purposes of this paragraph, good cause includes the circumstances listed in 49 CFR §26.53.
Before transmitting to Inyo County its request to terminate and/or substitute a DBE subcontractor, the prime contractor must give notice in writing to the DBE subcontractor, with a copy to Inyo County, of its intent to request to terminate and/or substitute, and the reason for the request.
The prime contractor must give the DBE five days to respond to the prime contractor's notice and advise Inyo County and the contractor of the reasons, if any, why it objects to the proposed termination of its subcontract and why Inyo County should not approve the prime contractor's action. If required in a particular case as a matter of public necessity (e.g., safety), Inyo County may provide a response period shorter than five days.
In addition to post-award terminations, the provisions of this section apply to preaward deletions of or substitutions for DBE firms put forward by offerors in negotiated procurements.
The Contractor certifies that its bid/offer is in compliance with 49 USC § 50101, BABA and other related Made in America Laws,[1] U.S. statutes, guidance, and FAA policies, which provide that Federal funds may not be obligated unless all iron, steel and manufactured goods used in AIP funded projects are produced in the United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list.
The bidder or offeror must complete and submit the certification of compliance with FAA’s Buy American Preference, BABA and Made in America laws included herein with their bid or offer. The Airport Sponsor/Owner will reject as nonresponsive any bid or offer that does not include a completed certification of compliance with FAA’s Buy American Preference and BABA.
The bidder or offeror certifies that all constructions materials, defined to mean an article, material, or supply other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives that are or consist primarily of: non-ferrous metals; plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); glass (including optic glass); lumber; or drywall used in the project are manufactured in the U.S.
[1] Per Executive Order 14005 “Made in America Laws” means all statutes, regulations, rules, and Executive Orders relating to federal financial assistance awards or federal procurement, including those that refer to “Buy America” or “Buy American,” that require, or provide a preference for, the purchase or acquisition of goods, products, or materials produced in the United States, including iron, steel, and manufactured products offered in the United States.
The address provided may be used to send official communications regarding this bid.
Please enter your CSLB Number which will be verified on the CSLB Website: https://www2.cslb.ca.gov/onlineservices/checklicenseII/checklicense.aspx
THE BIDDER HEREBY DECLARES, UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA, THAT THE STATEMENTS MADE IN THIS BID PROPOSAL FORM, INCLUDING ALL OF THE ATTACHED STATEMENTS, DESIGNATIONS, CERTIFICATES, AND AFFIDAVITS, ARE TRUE AND CORRECT, AND THAT THEY ARE THE INDIVIDUAL, MANAGING PARTNER, OR CORPORATE OFFICER, DULY AUTHORIZED BY LAW TO MAKE THIS BID ON BEHALF OF CONTRACTOR, AND BY CONFIRMING BELOW DO MAKE THIS BID ON BEHALF OF CONTRACTOR ACCORDING TO ALL OF THE TERMS AND CONDITIONS SET FORTH OR REFERENCED HEREIN.
If you click 'No' you will be given the option to upload a copy of your hard copy bid bond.
Please enter your Bid Bond information from Surety2000 below. If you do not have a Vendor ID, please use your company's EIN.
No County form is included, bidder may use the form from their bonding company.
Bidder hereby agrees that County shall be entitled to payment by forfeiture of the Proposal Guarantee if County awards the Project Contract to Bidder, but Bidder fails or refuses to execute the Contract and/or furnish all of the bonds, certificates and/or endorsements of insurance coverage, and other required documents no later than fifteen (15) calendar days after the date on which Bidder receives notice of the award from County.
Please download the below documents, complete, and upload.
Section 6.06 of the Inyo County Code explains the Local Business/Small Business contracting preferences.
Please download the below documents, complete, and upload the forms that pertain to your bid.
During the performance of this Contract, the Contractor and its subcontractors shall not unlawfully deny the Contract's benefits to any person, nor shall any person be unlawfully subjected to discrimination under the contract and its performance on the basis of religion, color, ethnic group identification, sex, age, or disability. In addition, the Contractor and its subcontractors shall not discriminate unlawfully against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, age, or sex. The Contractor shall insure that the evaluation and treatment of employees and applicants for employment are free from such discrimination.
The Contractor shall comply with the provisions of the Fair Employment and Housing Act (Government Code, Section 12900 et seq.), the regulations promulgated thereunder (California Code of Regulations, Title 2, Section 7285.0 et seq.), and the Provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the Government Code (Government Code, Sections 11135-11139.7).
Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.
The Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract.
I am aware of the provisions of Section 3700 and following of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
Please type in your DIR Registration number which will be verified by the County on the DIR website.
Bidder hereby certifies that they, and all subcontractors listed on the submitted Bid Form documents, are registered with the CA Department of Industrial Relations pursuant to requirements of California Labor Code Section 1725.5 and will comply with all requirements as noted in the aforementioned Labor Code section.
Pursuant to Cal. Public Contract Code section 7106 and Cal. Code of Civil Procedure section 2015.5, bidder hereby declares that I am the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
By checking the box below, I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
In accordance with Public Contract Code Section 10162, the Bidder shall answer, under penalty of perjury, the following question:
Has the Bidder, any officer of the Bidder, or any employee of the Bidder who has a proprietary interest in the Bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Please explain the circumstances if you responded "yes" to the Disqualification Questionnaire.
Government Code Section 84308, also known as the "Levine Act", to prohibit County “officers” from participating in any action related to a contract if such member receives political contributions totaling more than $500 within the previous twelve months, and for three months following the date a final decision concerning the contract has been made, from the person or company awarded the contract. The Levine Act also requires disclosure of such contribution by a party to be awarded a specific contract.
Section 84308(a)(4) of the Levine Act defines an "officer" as follows: “Officer” means any elected or appointed officer of an agency, any alternate to an elected or appointed officer of an agency, and any candidate for elective office in an agency. The term “officer” is further defined 2 Cal. Code Regs. Section 18438.1, which states:
An officer of an agency includes only those persons who make, participate in making, or in any way attempt to use their official position to influence a decision in the license, permit, or entitlement for use proceeding, or who exercise authority or budgetary control over the agency of officers who may do so, and:
(1) Serve in an elected position, including an official appointed to an elected position due to an interim vacancy or an election otherwise canceled because the official was the sole candidate for the position;
(2) Serve as a member of a board or commission;
(3) Serve as the chief executive of a state agency, or county, city or district of any kind; or
(4) Have decision making authority with respect to the proceeding involving a license, permit, or other entitlement for use and is also a candidate for elected office or has been a candidate for elective office in the 12 months prior to the proceeding.
The party making this certification isresponsible for determining whether a recipient of a political contribution is a County officer prior to answering.
In accordance with Public Contract Code Section 10232, the Contractor hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.
By checking the box below, Bidder certifies, under penalty of perjury under the laws of the State of California, that the foregoing statements in accordance with Public Contract Code Section 10232 are true and correct.
Is the applicant a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
The applicant agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification in all lower tier subcontracts.
Note
If an applicant responds in the affirmative to the above representation, the applicant is ineligible to receive an award unless the sponsor has received notification from the agency suspension and debarment official (SDO) that the SDO has considered suspension or debarment and determined that further action is not required to protect the Government’s interests. The applicant therefore must provide information to the COUNTY about its tax liability to the COUNTY, who will then notify the FAA Airports District Office, which will then notify the agency’s SDO to facilitate completion of the required considerations before award decisions are made.
A tax delinquency is any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted, or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
Is the applicant a corporation that was convicted of a criminal violation under any Federal law within the preceding 24 months.
Note
If an applicant responds in the affirmative the above representation, the applicant is ineligible to receive an award unless the sponsor has received notification from the agency suspension and debarment official (SDO) that the SDO has considered suspension or debarment and determined that further action is not required to protect the Government’s interests. The applicant therefore must provide information to the COUNTY about its or conviction to the COUNTY, who will then notify the FAA Airports District Office, which will then notify the agency’s SDO to facilitate completion of the required considerations before award decisions are made.
Felony conviction means a conviction within the preceding twenty four (24) months of a felony criminal violation under any Federal law and includes conviction of an offense defined in a section of the U.S. code that specifically classifies the offense as a felony and conviction of an offense that is classified as a felony under 18 U.S.C. § 3559.
The prospective participant certifies, to the best of his or her knowledge and belief, that:
(l) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload the DBE Commitment form. If your bid does not meet the stated DBE goal for the project, you must also submit the Good Faith Effort form.
The type of funding determines some of the bid package requirements. If you feel that your project does not fall into one of these categories, please check with your supervisor.
Specify number of Calendar Days or Working Days
Enter the daily amount of liquidated damages the contractor must pay if they do not complete the work within the time for completion specified in the contract. E.g. $500/Calendar Day or $1000/Working Day
Leave this blank if the project is not federally funded.
Generally we use 60 days, but some projects may require a longer period.
Select all that apply.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.