SLED Opportunity · FLORIDA · MIAMI DADE STRATEGIC PROCUREMENT DEPARTMENT
AI Summary
Demolition and removal of Pump Station No. 315 including sewer pipe abandonment, installation of new PVC sewer pipes and manholes, and related construction services in Miami-Dade County, FL. Bids submitted electronically with strict submission requirements.
• Demolition and removal of existing Pump Station No.315 to the extent indicated on the plans, which includes; the existing wet well and dry well, the existing pumps, emergency pump discharge box, electrical and mechanical equipment, piping, fittings, conduits and all other appurtenances; cut and fill with flowable fill the existing influent 8-inch gravity sewer pipes and the effluent 4-inch ductile iron force main that is to be abandoned. Transport of demolition material, including asphalt pavement, miscellaneous concrete, sod, unsuitable backfill material, pipes, valves, pumps, electrical and mechanical equipment to be legally disposed and/or salvaged, as ordered by the Department; furnishing, delivering and placing suitable backfill material as necessary. • Furnishing, delivering and installing approximately 183 linear feet of 8-inch PVC (C900) DR25 colored green pipe with neoprene gaskets for gravity sanitary sewer; three (3) precast reinforced concrete shallow sanitary sewer manholes; one (1) precast reinforced concrete utility conflict manhole (Type J, 72"x52"); core drilling the existing reinforced concrete box culvert (abandoned pedestrian underpass); making a core drill connection to an existing gravity sewer manhole for connection of the proposed gravity sanitary sewer and including rehabilitation of the manhole; sheeting and shoring ordered left in place by the Engineer; sewage bypass operations with tankering, if required; furnishing all labor, materials, equipment and incidentals required for cleaning and testing the gravity sanitary sewer. Bid submission must be electronic, through the eBuilder Bid Portal, with a hard copy sent to WASD postmarked within one (1) business day of the bid submittal date, mailed to WASD [3071 SW 38th Avenue, Suite 107, Miami, FL 33146] The original Bid bond Security (in the form of a bid bond or cashier’s check) MUST be delivered to WASD, at the address above, BEFORE the bids are opened. Failure to deliver the original will result in the bid submission being rejected as non-responsive. Invited bidders should have received an Invitation to Bid with an Invitation Key linked to the Invitee’s email address. Upon request, an invitation can be sent to multiple email addresses within the same company. However, if multiple bids are submitted by the same company, ALL submitted bids will be rejected. The bid set includes electronic bid instructions. Training on electronic bid submission is available every Monday from 9 – 10 and every Wednesday from 1 – 2. Email the Contracting Officer or paul.adams@miamidade.gov for further information or to schedule training on alternative dates. The RFI cut-off date is five (5) business days prior to the bid due date. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.