SLED Opportunity · MARYLAND · MARYLAND
AI Summary
University of Maryland seeks bids for renovation of Ellicott Hall including mechanical upgrades, roof and window replacement, piping infrastructure, and bathroom improvements. Construction from June to December 2026. Prequalification required.
James G. Davis Construction (DAVIS) is soliciting bids for the University of Maryland, College Park – Ellicott Community Renovation. This project is renovation of the existing Ellicott Hall Building (4052 Stadium Drive, College Park, MD 20740) to accommodate mechanical upgrades, roof replacement, replacement of piping infrastructure, and bathroom improvements. The design will incorporate new and relocated mechanical, electrical, plumbing, fire protection, and fire alarm systems both buildings. Dorm Rooms and other spaces will be renovated within the existing buildings to accommodate these new and relocated systems. The following are the scope of work options listed in order of preference by the University of Maryland College Park. -Mechanical Upgrades -Window Replacement -Roof Replacement -Replacement of piping infrastructure -Bathroom Improvements The construction will occur over a semester from June 1, 2026 to December 1, 2026. Bidders must complete pre-qualification forms included with the bid documents. Please reach out to Mark Ruiz (MRuiz@davisconstruction.com) for questions related to the prequalification process. Refer to the drawings and specifications for more information.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.