Active SLED Opportunity · LOUISIANA · CITY OF LAKE CHARLES CAPITAL PROJECTS
AI Summary
RFP for rehabilitation of gravity sewer pipelines at City of Lake Charles WWTP 'A' Basin, including point repairs, pipe bursting, and manhole lining under a compliance order with LDEQ.
Wastewater Treatment Plant A Basin A-02 Sewer Rehabilitation Funding by CDBG-DR (SAM.gov Assistance Listing 14.228) Resilient Communities Infrastructure Program (RCIP) RCIP Project No. 10LDRC7711 – CP3520 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. There is approximately 22,000 LF of 6-inch through 15-inch gravity sewer pipeline to be rehabilitated (Critical and Priority 1) as part of this project. Rehabilitation methods include point repairs, pipe bursting, and manhole lining.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.