Active SLED Opportunity · WYOMING · CHEYENNE REGIONAL AIRPORT
AI Summary
Reconstruction of GA Ramp and Taxiway A1 at Cheyenne Regional Airport including asphalt pavement, drainage, lighting, and markings. Project scheduled for summer/fall 2026.
The project is located at the Cheyenne Regional Airport, Cheyenne Wyoming. The project will include the reconstruction of a portion of the GA Ramp and Taxiway A1. Work will include full depth asphalt pavement reconstruction, subsurface edge drains, taxiway edge light installation, and pavement markings. Project to take place in the summer/fall of 2026. A complete set of Drawings, Bidding Requirements, and Contract Documents may be obtained on or after April 10, 2026 through Quest Construction Data Network (QuestCDN) website (www.questcdn.com, No. 10148618). Project Engineer is Tripp Fox, (303) 941-8309.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.