Active SLED Opportunity · CALIFORNIA · PECHANGA BAND OF INDIANS

    Recycling Center Construction RFP-PTG2026-07

    Issued by Pechanga Band of Indians
    localRFPPechanga Band of IndiansSol. 5fa20eab-445a-44c4-80cd-c256f0e1accd
    Open · 35d remaining
    DAYS TO CLOSE
    35
    due Jul 28, 2026
    PUBLISHED
    Jun 19, 2026
    Posting date
    JURISDICTION
    Pechanga Band
    local
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    The Pechanga Band of Indians seeks qualified contractors to construct a 40x50 ft premanufactured steel Recycling Center on their reservation. The project includes office, bathroom, mezzanine, and utilities. Proposals due July 28, 2026. Mandatory job walk on July 7, 2026.

    Opportunity details

    Solicitation No.
    5fa20eab-445a-44c4-80cd-c256f0e1accd
    Type / RFx
    RFP
    Status
    active
    Level
    local
    Published Date
    June 19, 2026
    Due Date
    July 28, 2026
    NAICS Code
    236220AI guide
    Agency
    Pechanga Band of Indians

    Description

    NOTICE TO POTENTIAL BIDDERS

    PTG Non-Disclosure Agreement must be signed and emailed to orders@pechanga-nsn.gov. Once received the official RFP will be released.

    The Pechanga Band of Indians (“Tribe”) is soliciting proposals from qualified contractors to construct a Recycling Center on the Pechanga Indian Reservation for the Tribal residential community.

    This building will be a 40ft by 50ft premanufactured steel building assembled on a cement foundation built at the existing Pechanga Transfer Station. The building will have an interior office and bathroom for staff, mezzanine for light storage, and utilities.

    The purpose of this work is to construct a Recycling Center that will house staff and be used for sorting, processing, and temporarily storing recyclable materials. The design/build contractor will produce a coordinated plan and assemble a team to construct the Recycling Center based on existing prepared plans to complete the project in collaboration with the Tribe.

    Insurance Requirements

    ·         General Liability Insurance $1,000,000

    ·         Total Aggregate Insurance $2,000,000

    ·         Professional Liability Insurance $1,000,000  

    ·         Motor Vehicle Liability Insurance $1,000,000  

    ·         Workers’ Compensation Statutory Coverage

    Required Permitting & Plan Check

    Construction Permit

    https://www.pechanga-nsn.gov/images/fire/P005A_constructionPermit11.pdf

    Plan Review Submittal

    https://www.pechanga-nsn.gov/images/fire/p007_PlanReviewSubmittal26.pdf

    Fire Ordinances

    https://www.pechanga-nsn.gov/images/fire/O_NonGamingNonResidentialBuildingOrdinance.pdf

    Timeframe and Milestones

    Event / Activities

    Anticipated Date / Timeframes

    RFP Release Date

    June 19, 2026

    Mandatory Job Walk/ Pre-Bid Site Visit

    July 7, 2026

    RFI Deadline

    July 10, 2026

    Proposal Submission Deadline

    July 28, 2026

    Post-Submission Review/Interviews (if applicable)

    August 3, 2026

    Notice to Proceed/Contract Award

    August 28, 2026

    Kickoff Meeting

    TBD

    Key dates

    1. June 19, 2026Published
    2. July 28, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.