SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
Rehabilitate well #2 at Greenfield Millbrook Well Field including equipment installation, well redevelopment, disinfection, and water level measurements.
The project consists of rehabilitating well #2 at the Greenfield Millbrook Well Field. Furnish and install new equipment as authorized by City. Refurnish any equipment that is to be reused. Furnish and install new well draw down measuring tube and connect tube to existing altitude gauge. Redevelop well to maximum specific yield capacity. Disinfect cleaned well and re-install pumping equipment. Record static water level, pumping water level, pumping rate, drawdown, and specific gravity.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.