Active SLED Opportunity · OREGON · CITY OF BEAVERTON

    Relocation of Sewer Lateral and Abandonment of Sewer Main – SW Canyon Rd to SW Cedar Hills Blvd

    Issued by City of Beaverton
    cityRFPCity of BeavertonSol. 286503
    Open · 7d remaining
    DAYS TO CLOSE
    7
    due Aug 13, 2026
    PUBLISHED
    Jul 22, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    City of Beaverton seeks contractors for relocating a sewer lateral and abandoning an existing sewer main along SW Canyon Rd. The project includes trenchless and open-trench construction, manhole installation, pavement restoration, and traffic control. Proposals due August 12, 2026, via the City's portal.

    Opportunity details

    Solicitation No.
    286503
    Type / RFx
    RFP
    Status
    open
    Level
    city
    Published Date
    July 22, 2026
    Due Date
    August 13, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    City of Beaverton
    State
    Oregon
    Agency
    City of Beaverton

    Description

    This project consists of relocating the Firestone sewer lateral to connect to the sewer main on SW Cedar Hills Blvd via a new manhole, using a combination of trenchless and open-trench construction methods. Following the lateral relocation, the existing sewer main along SW Canyon Rd will be abandoned, and the two existing cleanouts and sewer manhole located on SW Canyon Rd will be removed.

    Background

    SW Canyon Rd (Hwy 8) falls under ODOT jurisdiction; therefore, this project will adhere to all applicable ODOT standards, rules, and regulations. A sewer permit and an ODOT permit have already been obtained by the City.

    Project Details

    • Reference ID: CIP 6150
    • Department: Public Works - Engineering
    • Department Head: Tim Elsea (PW Director)

    Evaluation Criteria

    • Proposal Submittal

      Submissions in response to the RFP shall be submitted electronically through the City's Portal: https://procurement.opengov.com/portal/beavertonoregon . Proposals are to be submitted Wednesday, August 12, 2026, no later than 5:00 pm.

    • Proposal Format and Administrative Requirements

      Proposals must address all submission requirements and must describe how the services will be provided. Unless otherwise specified, no particular form is required.

    • Program Description

      The City is dedicated to increasing opportunities for enterprises that have been certified by the State of Oregon, through the Certification Office for Business Inclusion and Diversity (COBID).  A directory of these state-certified firms is available at www.oregon4biz.com/certification. 

       

      The City has an aspirational goal of a 15% utilization of COBID certified companies in its overall dollar value of contracting and purchasing activities.

    • Minimum Requirements

      TBD

    • Schedule of Work

      The City expects the Proposer selected for award of contract to start work as soon as a contract is signed, if contract is needed.

      The City anticipates all work will be completed on or before NO VALUE

    • Scope of Work

      Scope of Work

      Summary

      The City of Beaverton, OR is seeking qualified contractors to undertake the relocation of the Firestone sewer lateral and the abandonment of the existing sewer main along SW Canyon Rd. The project involves connecting the Firestone sewer lateral to the sewer main on SW Cedar Hills Blvd via a new manhole, utilizing a combination of trenchless and open-trench construction methods. Following the successful relocation of the lateral, the existing sewer main along SW Canyon Rd will be abandoned, and the two existing cleanouts and sewer manhole located on SW Canyon Rd will be removed.

      Detailed Specifications

      1. Relocation of Sewer Lateral
        1. Utilize trenchless construction methods (e.g., pipe bursting, directional drilling) to minimize surface disruption where feasible.
        2. Employ open-trench construction methods where trenchless methods are not feasible.
        3. Install new manhole in SW Cedar Hills Blvd. Connect existing main and new lateral to new structure. 
        4. Ensure all new sewer lateral connections meet the following standards:
          • American Society for Testing and Materials (ASTM) standards for sewer pipes and fittings.
          • Occupational Safety and Health Administration (OSHA) standards for trench safety.
          • City of Beaverton/Clean Water Services Standards for sewer construction.
        5. Conduct pressure testing and inspection of the new sewer lateral to ensure compliance with all relevant standards and specifications.
      2. Abandonment of Existing Sewer Main
        1. Disconnect and fill the existing sewer main along SW Canyon Rd with controlled low-strength material to abandon the pipe. 
        2. Remove the two existing cleanouts and sewer manhole located on SW Canyon Rd.
        3. Backfill and compact the excavated areas to restore the surface in accordance with ODOT standards and specifications. 
          1. Concrete sidewalk repair, driveway repair and asphalt pavement repair to ODOT standards. 
        4. Ensure all abandonment activities comply with the following standards:
          • ASTM standards for sewer pipe abandonment.
          • OSHA standards for excavation and trench safety.
          • City of Beaverton Public Works Standards for sewer abandonment.
          • ODOT Standard Specifications
      3. Pavement Restoration 
        1. All pavement and concrete restoration work shall be performed in accordance with ODOT standards. 
        2. All pavement and concrete restoration shall comply with the following:
          • ODOT pavement and sidewalk standards
          • ODOT Standard Specifications
      4. Traffic Control 
        1. The Contractor shall submit a traffic control plan for review and approval by the City Traffic Engineer prior to the start of work. 
        2. The Contractor shall be responsible for providing all traffic control measures and for supplementing them as needed if the approved traffic control plan proves insufficient 
        3. All work shall be performed between the hours of 9:00 PM and 5:00 AM

      Service Requirements

      1. Contractor must obtain all necessary permits and approvals from the City of Beaverton and other relevant authorities before commencing work. City of Beaverton has already obtained the ODOT permit and sewer permit. 
      2. Contractor will submit a traffic control plan that must be approved by the City before work can commence.
      3. Contractor must provide a detailed project schedule, including milestones and completion dates, for approval by the City of Beaverton.
      4. Contractor must maintain a safe and clean worksite, adhering to all OSHA regulations and City of Beaverton safety standards.
      5. Contractor must coordinate with local utilities to identify and avoid existing underground infrastructure.
      6. Contractor must provide regular progress reports to the City of Beaverton project manager.
      7. Contractor must conduct a final inspection with the City of Beaverton project manager to ensure all work meets the specified standards and requirements.

      Delivery Requirements

      1. All materials and equipment required for the project must be delivered to the worksite in a timely manner to avoid project delays.
      2. Contractor must provide a secure storage area for materials and equipment on or near the worksite.
      3. Contractor must ensure that all deliveries comply with the City of Beaverton's traffic and safety regulations.
      4. Contractor must dispose of all waste materials in accordance with local, state, and federal regulations.
      5. Contractor must restore all disturbed areas to their original condition or better upon completion of the project.

      By adhering to the above scope of work, the City of Beaverton aims to ensure the successful relocation of the Firestone sewer lateral and the abandonment of the existing sewer main along SW Canyon Rd, while minimizing disruption to the community and maintaining the highest standards of safety and quality.

       

      LINK to All City of Beaverton Standard Drawings

      LINK to All Oregon Department of Transportation (ODOT) Drawings

      LINK to ODOT Standard Specifications

    • Bidding Requirements

      Please submit a bid for the items listed below to complete the project, including a brief description with each item explaining what it covers. All work must comply with the standards set by the City of Beaverton and the Oregon Department of Transportation. There is no required format for the submission.

      • Mobilization
      • Work Zone Traffic Control
      • Erosion Control
      • 4" Sanitary Sewer Lateral
      • 48" Manhole
      • Filling Abandoned Structures
      • 4" Concrete sidewalk panels 
      • 8" Commercial Concrete Bay 
      • Trench Resurfacing 
      • Grind and Inlay 
    • Procurement Method

      The City is conducting this Informal Solicitation pursuant to pursuant to Beaverton Purchasing Code Section 47-0290. The City seeks proposals that will enable the City to determine which service provider and solution will best meet the City’s needs. The City expects this Informal Solicitation will result in a single contract with a single vendor for the preferred solution.

    • Contract Award

      The City may award one contract or multiple contracts, as a result of this procurement. Upon completion of the evaluation process, the selection committee will advise the Proposers of its number one selection via email to all proposers.

    • Award Consideration

      Whether to award a contract shall be determined by the City in its sole and absolute discretion to be in its best interest. The City reserves the right to withdraw any and/or all items from award consideration. 

    • No Contractual Obligation

      The City is not obligated because of the submission of a proposal to enter into a contract with any Proposer and has no financial obligation to any Proposer arising from this Informal RFP. 

    • Questions and Clarifications

      All questions regarding this project proposal shall be submitted through the portal.

    • Business License/Taxpayer ID Number

      A Proposer awarded a contract shall obtain a City business license as required by Beaverton Code Section 7.01 prior to beginning work under this contract and must pay all fees due under the Business License Law during the term of the contract.

      A Proposer awarded a contract shall complete an IRS Form W-9 for the City and provide the City with either the Proposer’s Social Security Number or federal taxpayer ID number. This number is requested pursuant to BPC 47-0770 of the Beaverton Purchasing Code. Social Security numbers provided pursuant to this requirement will be used for the administration of state, federal, and local tax laws.

    • Contract Administrator and Single Point of Contact

      The Contract Administrator will be Danica Ruud, PE, who can be reached by telephone at (971) 482-8292 or by e-mail at mphillips@beavertonoregon.gov

    • Insurance Requirements

      Contractor will be expected to meet the insurance requirements of the city when entering a contract, and a sample contract will be provided.

    • Multi-Year Contract

      At the conclusion of the first contract term, the contract may be renewed under similar terms for up to one (1) additional one-year terms at the option of the City.

    • Nondiscrimination

      The consultant agrees that, in performing the work called for by this proposal, the consultant shall comply with all federal, state, and local civil rights and rehabilitation laws prohibiting discrimination because of race, sex, national origin, religion, age or disability, and shall comply with all applicable provisions of ORS 279C.500 through 279C.565. 

    Submission Requirements

    • Proposal (required)

      Please refer to the Scope of Work & Proposal Content and Format.

    • Authorized Signatory Name & Title (required)
    • Is your firm currently certified by the State of Oregon COBID office? (required)
    • If yes, what Certifications do you hold and provide certification number.
    • ATTESTATION of COMPLIANCE with TAX LAWS (required)

      By confirming, the authorized signatory, hereby attest that: 

      1. I am an authorized agent of Bidder/Proposer, and I have full authority from Bidder/Proposer to submit this attestation and accept the responsibilities stated herein.

      2. I have knowledge regarding payment of taxes of Bidder/Proposer, and to the best of my knowledge, Bidder/Proposer is not in violation of any Oregon tax laws, including, without limitation, ORS 305.620 and ORS chapters 316, 317 and 318. 

      3. Bidder/Proposer shall provide written notice to City within two business days of any change to its compliance with tax laws.

    • By confirming, the authorized signatory verifies that they are a duly authorized officer of the company, and that their confirmation attests that information provided in response to this Request for Proposal Solicitation is accurate. (required)

      Request For Proposal CIP 6150 Relocation of Sewer Lateral and Abandonment of Sewer Main – SW Canyon Rd to SW Cedar Hills Blvd

    • Expected Contract Initial Term (required)

      Example: expected to commence on or about 12 July 2023 and end on or before 12 July 2024

    • How many additional 1-year term renewal options? (required)

      Standard Contracts are for a total of 5 years (Initial + Renewal) unless approved by purchasing. 

    Key dates

    1. July 22, 2026Published
    2. August 13, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.