SLED Opportunity · VIRGINIA · VIRGINIA

    Request for Information - Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades

    Issued by Virginia Department of Energy
    stateRFIvirginiaSol. 116574
    Closed
    STATUS
    Closed
    due Mar 27, 2026
    PUBLISHED
    Mar 24, 2026
    Posting date
    JURISDICTION
    virginia
    state
    NAICS CODE
    221121
    AI-classified industry

    AI Summary

    Virginia Department of Energy requests project concepts for DOE grant opportunity SPARK to enhance electric grid capacity and reliability through accelerated reconductoring and advanced transmission technology upgrades.

    Opportunity details

    Solicitation No.
    116574
    Type / RFx
    RFI
    Status
    Open
    Level
    state
    Published Date
    March 24, 2026
    Due Date
    March 27, 2026
    NAICS Code
    221121AI guide
    Jurisdiction
    virginia
    Agency
    Virginia Department of Energy

    Description

    The Virginia Department of Energy is accepting project concepts from potential partners to pursue an application to the grant funding opportunity released by the U.S. Department of Energy’s (DOE) Office of Electricity (OE) titled Infrastructure Investment and Jobs Act (IIJA) – Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK) – [Grid Resilience and Innovation Partnerships (GRIP) Round 3], Notice of Funding Opportunity (NOFO) Number: DE-FOA-0003580.Per the NOFO, “SPARK is an opportunity to meet load demand growth and resource adequacy, and to address critical national, interregional, and regional needs. OE achieves these goals by stimulating investment in power system infrastructure and building partnerships between states, local governments, tribes, and power system operators to enhance reliability and affordability of the electric grid. Projects submitted under this NOFO must demonstrate measurable improvements in electric grid capacity and system value (usefulness), combining physical capacity gains, which include solutions such as reconductoring or other infrastructure upgrades with operational efficiency and/or flexibility from other Advanced Transmission Technologies (ATTs). Applications must show how these complementary technologies expand transfer capability, strengthen reliability and resource adequacy, and reduce consumer cost impact while utilizing existing rights of way. DOE will prioritize projects that can be implemented quickly to deliver durable physical upgrades and dynamic operational gains that together increase the value, performance, security, resilience, affordability, and reliability of the nation’s electric grid.”

    Key dates

    1. March 24, 2026Published
    2. March 27, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.