Active SLED Opportunity · UTAH · WASHINGTON COUNTY WATER CONSERVANCY DISTRICT

    Request for Proposals – CM/GC Services For The Advanced Water Purification Demonstration Facility and Conservation Garden Project

    Issued by Washington County Water Conservancy District
    localRFPWashington County Water Conservancy DistrictSol. request-for-proposals-cm-gc-services-for-the-advanced-water-purification-demonstration-facility-and-conservation-garden-project
    Open · 21d remaining
    DAYS TO CLOSE
    21
    due Jun 24, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    Washington County
    local
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Washington County Water Conservancy District seeks CM/GC services for the Advanced Water Purification Demonstration Facility and Conservation Garden Project, part of a regional water reuse system funded federally.

    Opportunity details

    Solicitation No.
    request-for-proposals-cm-gc-services-for-the-advanced-water-purification-demonstration-facility-and-conservation-garden-project
    Type / RFx
    RFP
    Status
    Open
    Level
    local
    Published Date
    Due Date
    June 24, 2026
    NAICS Code
    236220AI guide
    State
    utah
    Agency
    Washington County Water Conservancy District

    Description

    Washington County Water Conservancy District (district) is a water conservancy district organized and existing under the Utah Water Conservancy District Act. The district is seeking proposals from qualified vendors to provide Construction Manager/General Contractor (CM/GC) services for the Advanced Water Purification (AWP) Demonstration Facility and Conservation Garden Project (procurement item). The project is a component of the Regional Reuse Purification System (system). More information on the system can be found at wcwcd.gov/reuse . The anticipated CM/GC scope of work is attached and incorporated as Attachment A. The district has already procured an architect for the design of the procurement item, and has completed a preliminary design report (PDR). The PDR is available HERE for review. The district has received federal funding for portions of the system as part of the Bureau of Reclamation’s Large-Scale Water Recycling Program (Funding Opportunity No. R23AS00433) and is required to develop projects through a series of review stages prior to the release of funds allocated for the system. A description of the design deliverables and required review stages for this project is attached and incorporated as Attachment B.

    Key dates

    1. June 24, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.