SLED Opportunity · ARIZONA · ARIZONA
AI Summary
RFQ for construction management services for Alley Rehab Dust Emissions Reduction Phase III in Arizona, focusing on dust mitigation using recycled asphalt milling material over 19.99 miles of alleys.
Solicitation documents and addenda may be downloaded on the Arizona Procurement Portal. DO NOT submit questions to the APP Vendor Forum as they will not be responded to. Questions must be submitted via e-mail to soq.questions@chandleraz.gov for consideration. Also, you must follow SOQ submittal instructions in the RFQ Document. DO NOT submit SOQ’s through the APP portal. Project Description: This project mitigates dust by replacing the top 4" to 6" of dirt/older ABC with asphalt milling material. The surfacing material utilized is discarded roadway asphalt milled material that will be recycled and used to create a more dust free driving surface on 19.99 miles of alleys. Alleys are used by homeowners, utility companies and garbage trucks to access backyards, utility boxes and garbage cans daily. This project will improve the alley surface, improve the air quality and reuse/recycle material that is considered discarded from other projects. Scope of Work: The construction management scope of work includes but is not limited to attendance of weekly construction meetings, review, evaluation, and response to CPM schedules, Requests for Information (RFIs), shop drawing submittals, field directives, Requests for Proposals (RFPs), and contractor pay applications, as well as field inspections and associated services. Coordination with the designer of record, the contractor, and key stakeholders will be critical to the success of this project.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.