Active SLED Opportunity · CALIFORNIA · RIALTO UNIFIED SCHOOL DISTRICT
AI Summary
Rialto Unified School District seeks lease-leaseback preconstruction and construction services for new gymnasiums and site improvements at Frisbie and Kolb Middle Schools in California, with an estimated construction cost of $50M. Services include sitework, track replacement, and accessible parking. Construction starts December 18, 2026, completing by March 19, 2028.
The Project generally consists of the following:• Frisbie Middle School: This project consists of a new gymnasium building (Building G), new outdoor amphitheater seating, new basketball courts and replacing existing d.g. track with rubberized track and synthetic field, including all associated sitework, accessible parking, path of travel upgrades, ramp replacements and required site utilities.• Kolb Middle School: This project consists of a new gymnasium building (Building G), new softball field and replacing existing d.g. track with rubberized track and synthetic field, including all associated sitework, accessible parking, EV parking, path of travel upgrades, ramp replacements and required site utilities.The Conceptual Drawings for the Project will be made available to contractors that register with the District as described in Part C of the main body of this RFQ/RFP. The District presently intends that the Project Contractor:(i) shall commence the preconstruction services on or about a date to be determined as agreed;(ii) shall commence construction of the Project on or about December 18, 2026, and (iii) shall fully and satisfactorily complete construction of the Project not later than March 19, 2028. Subject to adjustments of time in accordance with the LLB Agreements, the Project Contractor shall be responsible for procuring all materials and equipment, and performing all labor, services and other things, as necessary to meet the foregoing milestone dates. Estimated Bid Value: $50,000,000 Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Purchasing Services Address: Frisbie Middle School, 1442 N Eucalyptus Ave, Rialto, CA 92376 County: San Bernardino License Requirements: B General Other Details: The District, Architect, and/or other District consultant has estimated that the total construction cost for the Project will be approximately $50,000,000; which is estimated based on a cost of $25,000,000 per school site. Notes: NOTE: In the event of a discrepancy on PlanetBids, the District's Request for Qualifications and Proposals for Lease-Leaseback Preconstruction and Construction Services - Frisbie Middle School and Kolb Middle School New Gymnasiums solicitation documents shall take precedence.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.