Active SLED Opportunity · GEORGIA · COBB COUNTY, GA

    Request for Qualifications for Prequalification of New Contractors for Cobb County Water System for 2025-2028 Period

    Issued by Cobb County, Ga
    countyRFQCobb County, GaSol. 194808
    Open · 748d remaining
    DAYS TO CLOSE
    748
    due May 31, 2028
    PUBLISHED
    Aug 29, 2025
    Posting date
    JURISDICTION
    Cobb County,
    county
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Cobb County Water System seeks prequalified contractors for water, sewer, manhole, valve box, CIPP rehabilitation, and stormwater construction services for 2025-2028. Submissions reviewed quarterly via the county's eProcurement portal.

    Opportunity details

    Solicitation No.
    194808
    Type / RFx
    RFQ
    Status
    open
    Level
    county
    Published Date
    August 29, 2025
    Due Date
    May 31, 2028
    NAICS Code
    237110AI guide
    Jurisdiction
    Cobb County, Ga
    State
    Georgia
    Agency
    Cobb County, Ga

    Description

    Cobb County Water System is issuing this Solicitation for Request for Qualifications for Prequalification of New Contractors for Water and Sewer Line Construction, Manhole & Valve Box Adjustments, Cured-in-Place (CIPP) Rehabiliation, Manhole Rehabilitation, and Stormwater Construction. Submissions shall be reviewed on a quarterly basis but may be submitted at any time, via the County's eProcurement Portal at https://procurement.opengov.com/portal/cobbcoga.

    Background

    Contractors are invited to submit Statements of Qualification for bidding future construction and rehabiliation projects for the Cobb County Water System. Contractors who wish to make a new application to become prequalified are invited to submit their Statements of Qualifications. Contractors are not required to submit Statements of Qualifications for all the categories. There are attachments for new application for each category and completed applications should be uploaded where indicated on the Vendor Questionnaire to the applicable category.

    Project Details

    • Reference ID: NewPrequal2026
    • Department: Water System
    • Department Head: Jake Murray (Engineering Division Manager)

    Important Dates

    • Questions Due: 2028-05-24T21:00:00.000Z

    Evaluation Criteria

    • Minimum Requirements Met (100 pts)

      Firm must meet requirements as set forth in the RFQ.

    Submission Requirements

    • Water and Sewer Line Construction (New Application) - Category 1

      Please Upload your COMPLETE response for Category 1 here, including any and all required forms listed in the solicitation and the corresponding attachments.  Reference Forms for Applications required for Category 1.

      (Do not upload cost information in here)

    • Manhole & Valve Box Adjustments (New Application) - Category 2

      Please upload your COMPLETE response for Category 2 here, including any and all required forms listed in the solicitation and the corresponding attachments. Reference Forms for Applications required for Category 2.

    • Cured-in-Place (CIPP) Rehabilitation (New Application) - Category 3

      Please upload your COMPLETE response for Category 3 here, including any and all required forms listed in the solicitation and the corresponding attachments.  Reference Forms for Applications required for Category 3.

    • Manhole Rehabilitation (New Application) - Category 4

      Please upload your COMPLETE response for Category 4 here, including any and all required forms listed in the solicitation and the corresponding attachments.  Reference Forms for Applications required for Category 4.

    • Stormwater Construction (New Application) - Category 5

      Please upload your COMPLETE response for Category 5 here, including any and all required forms listed in the solicitation and the corresponding attachments.  Reference Forms for Applications required for Category 5.

    • Separate Cost Proposal (required)

      Confirm that your fee proposal is not attached in your Proposal and is attached separately here.

    • I certify that I have read, understood and agree to the terms in this solicitation, and that I am authorized to submit this response on behalf of my company. (required)
    • Advertisement dates? (required)
    • What is the intended bid opening date? (required)
    • Solicitation type? (required)
    • Will there be a pre-bid/pre-proposal conference? (required)
    • Will the pre-bid/pre-proposal meeting be mandatory or not? (required)
    • Do you have pricing table information? (required)
    • Will you be using the electronic pricing table or have vendors upload pricing? (required)
    • Will bonds be required? (required)
    • If yes, what type of bond(s)? (required)
    • Procurement and/or Project Contact

      Select the information you would like display.

    • E-Verify required? (required)
    • Funding source(s)?

    Questions & Answers

    Q (No subject): Is this only for new contractors? Or a renewal for those already qualified?

    A: This is only for new contractors who did not respond to the original solicitation.


    Q (Optional Questionnaire Question ): When trying to upload the Water and Sewer Prequal I was unable to simply attach a file to Category 1 and Submit. The system is stating that the other Categories need attachments as well. How should we proceed?

    A: We have gone into the system to resolve this issue. Please try uploading your file to category 1 again to submit. If you continue to have an issue, please email Linda.Weaver@cobbcounty.gov for assistance.


    Key dates

    1. August 29, 2025Published
    2. May 31, 2028Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.