SLED Opportunity · SOUTH DAKOTA · SOUTH DAKOTA

    REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR A SECURE VESTIBULE CONSTRUCTION

    Issued by Harrison School District Two
    localRFPSouth DakotaSol. 8307201006
    Closed
    STATUS
    Closed
    due Feb 26, 2026
    PUBLISHED
    Feb 6, 2026
    Posting date
    JURISDICTION
    South Dakota
    local
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Seeking qualified General Contractors for construction of a secure entry vestibule at Fox Meadow Middle School, including building addition, security system integration, and site modifications.

    Opportunity details

    Solicitation No.
    8307201006
    Type / RFx
    RFP
    Status
    Active
    Level
    local
    Published Date
    February 6, 2026
    Due Date
    February 26, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    South Dakota
    Agency
    Harrison School District Two

    Description

    The District is seeking proposals from qualified General Contractors for the construction of a new secure entry vestibule at Fox Meadow Middle School (“Project”).The Project will generally consist of, but will not be limited to: • Construction of a building addition and/or reconfiguration at the main entrance to create a secure vestibule • Interior and exterior wall construction, including storefront or glazing systems • Door and hardware installation, including secure access control doors • Modifications to existing building systems impacted by the work, including but not limited to electrical, lighting, fire alarm, data, and mechanical systems • Integration of security systems including access control, intercom, and camera infrastructure (final device installation may be by District vendors; contractor to coordinate and provide pathways, power, and rough-ins) • Site modifications at the entry area, which may include concrete flatwork, sidewalks, ramps, ADA compliance adjustments, and exterior finishes • Roofing tie-ins and building envelope integration as required by the addition • Interior finishes including ceilings, flooring, painting, and casework as applicable • Temporary protection of existing facilities and safe egress during construction • Coordination with school operations and District personnel The District is seeking proposals from qualified General Contractors for the construction of a new secure entry vestibule at Fox Meadow Middle School (“Project”).The Project will generally consist of, but will not be limited to: • Construction of a building addition and/or reconfiguration at the main entrance to create a secure vestibule • Interior and exterior wall construction, including storefront or glazing systems • Door and hardware installation, including secure access control doors • Modifications to existing building systems impacted by the work, including but not limited to electrical, lighting, fire alarm, data, and mechanical systems • Integration of security systems including access control, intercom, and camera infrastructure (final device installation may be by District vendors; contractor to coordinate and provide pathways, power, and rough-ins) • Site modifications at the entry area, which may include concrete flatwork, sidewalks, ramps, ADA compliance adjustments, and exterior finishes • Roofing tie-ins and building envelope integration as required by the addition • Interior finishes including ceilings, flooring, painting, and casework as applicable • Temporary protection of existing facilities and safe egress during construction • Coordination with school operations and District personnel

    Key dates

    1. February 6, 2026Published
    2. February 26, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.