Active SLED Opportunity · INDIANA · GARY SANITARY DISTRICT
AI Summary
Request for quotes for sanitary sewer repair at 301 King Street, Gary, IN. Scope includes removal and replacement of 12-inch PVC pipe, cleaning, and CCTV inspection. Quotes due by May 14, 2026.
Sanitary Sewer Repair at 301 King Street in the City of Gary, IN.
• Remove and replace existing 12-inch diameter pipe with 12-inch diameter PVC SDR 35 ± 165-linear feet from Manhole No. 2902 to Manhole No. 2903
(provide detail here)
Please download the below documents, complete, and upload.
If applicable
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.