Active SLED Opportunity · FLORIDA · CITY OF NORTH PORT

    RFB 2026-19 Confined Space Prop Project

    Issued by City of North Port
    cityRFBCity of North Port Sol. 531319
    Open · 21d remaining
    DAYS TO CLOSE
    21
    due Jun 4, 2026
    PUBLISHED
    May 5, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    City of North Port seeks contractor for construction of a confined space training facility using connex boxes. Scope includes grading, placement, decking, and all related work. Requires performance bond, compliance with safety and quality standards, and completion within contract time. Bid due June 4, 2026.

    Opportunity details

    Solicitation No.
    531319
    Type / RFx
    RFB
    Status
    Active
    Level
    city
    Published Date
    May 5, 2026
    Due Date
    June 4, 2026
    NAICS Code
    237310AI guide
    State
    Florida
    Agency
    City of North Port

    Description

    > **Attachments are gated.** To access the full download package ($5), contact [support@samsearch.co](mailto:support@samsearch.co). 1. SCOPE OF WORK 1.1 Intent of Contract: It is the intent of the City of North Port (hereinafter referred to as City) to provide a confined space/trench prop adjacent existing Fire Training Tower, located at 6664 W. Price Boulevard within the City of North Port, FL. The proposed development will consist of the construction of a +/- 2,000 SF confined space training facility constructed of Owner-supplied connex boxes. Grading and final placement of the connex boxes, as well as decking and all other required materials will be the responsibility of the contractor. For final purposes of this Bid, the term “contractor” shall be defined as the company submitting the proposal and shall include all subsidiaries, affiliates, and subcontractors. As such, any requested documentation shall apply to all subsidiaries and affiliated companies as well as any subcontractors. If a company is using a subcontractor to either manufacture or deliver the product, the requested items (e.g., references, terminations, safety incidents) shall apply to the subcontractor as well. Bid forms shall set forth firm bid unit prices for furnishing all necessary materials and completing all work, including but not limited to labor, transportation, supervision, electricity, water, equipment, startup, testing, training, and all other work needed for a complete and operational system, as described in the Technical Specifications and/or shown on the Contract Drawings attached herewith. The City reserves the right to establish the exact limits of work in the field and to add or delete from the Project, as it deems necessary. The intent of the Technical Specifications and Contract Drawings is to describe a complete project to be constructed in accordance with the Contract Documents. The Contract Documents comprise the entire Agreement between the City and the Contractor. They may be altered only by addendum or change order approved by the City. Please note that this is part of a phased project with Technical Specifications shared by all phases of the project. As such, there may be references in the Technical Specifications to pay items that are not part of this phase of the project. 1.2 Definitions: 1.2.1 The Department as used within the Contract Documents refers to the City. 1.2.2 The successful bidder for this Contract will be referred to as the CONTRACTOR: The Department Director or his/her representative, acting personally or through an assistant duly authorized for such act by the City will be referred to as City. For the purposes of this Contract, the word “Project” shall mean the services limits of CONTRACTOR. 1.2.3 The Contract Documents consist of the Contract, A Request for Bids and all Addenda, Instructions to Bidders, General Provisions, Special Provisions, Technical Specifications (if applicable), Insurance Requirements, Construction Drawings & Plans (if applicable), Bid Form, Bid Schedule, and all other related and included City Forms and documents, including all modifications thereof incorporated in the documents before their execution. These form the Contract. 1.2.4 Written notice shall be deemed to have been duly served three days after date of postmark, and upon receipt, if delivered to the individual or member of the firm or an officer of the corporation for whom it is intended. 1.2.5 Subcontractor(s), as employed herein, includes only those having a direct Contract with the Contractor and it includes one who furnishes material worked to a special design according to the plans and specifications of this work, but does not include one who merely furnishes material not so worked. 1.2.6 The term “work” as it pertains to the contract shall include all supplies, materials and transportation, as well as all equipment and labor necessary to complete each pay item as described in the Specifications of this contract. 1.2.7 Engineer refers to the City, acting directly or through duly authorized representatives; such representatives acting within the scope of the duties and authority assigned to them. Note: In order to avoid cumbersome and confusing repetition of expressions in the Contract Documents, it is provided that whenever anything is, or is to be done, if, as, or, when, or where “acceptable, accepted, approval, approved, authorized, condemned, considered necessary, contemplated, deemed necessary, designated, determined, directed, disapproved, established, given, indicated, insufficient, ordered, permitted, rejected, required, reserved, satisfactory, specified, sufficient, suitable, suspended, unacceptable, or unsatisfactory,” it shall be understood as if the expression were followed by the words “by the Engineer,” “to the Engineer,” or “of the Engineer.” 1.2.8 All tie limits stated in the Contract documents are of essence to the Contract. 1.2.9 The words “furnish,” furnish and install,” “install,” and “provide” or words with similar meaning shall be interpreted, unless otherwise specifically stated, to mean “furnish and install complete in place and ready for service.” 1.3 Time of Completion: The Contractor shall complete the work within the time set forth in the Contract. The Contractor shall complete each portion of the work within such time as set forth in the Contract for such portion. The time of completion of the Contract shall be expressed in calendar days. All work for this project shall be performed during regular business hours. A regular workday shall be considered to be a maximum of eight and one half (8.5) hours duration. The cost for inspection time for work performed on weekends, holidays, or in excess of ten (10) hours may be billed to the Contractor at the prevailing wage plus overhead costs for those persons involved. A working day is any day within the period between the start of the Contract time and the date provided in the Contract for completion or upon field acceptance by the City of all work provided for in the Contract, or as stipulated in the Technical Specifications, or whichever comes first, other than: Saturday, Sunday, any day designated as a holiday by the City, any day the Contractor is prevented from working during the first five (5) hours of the work day, with at least sixty percent (60%) of the normal work force, due to inclement weather. Request for planned overtime by the Contractor must be submitted in writing to the City, forty-eight (48) hours in advance, and may not proceed without the City’s approval. 1.4. Quality of Work: The Contractor agrees to do the work covered under this Contract to the best of his/her ability and conforming to this Contract and specifications and of a quality acceptable to the trades. The Contractor further agrees to follow proper and appropriate instructions by the City. 2. PROSECUTION AND PROGRESS 2.1 Subletting or Assigning of Contracts: The Contractor shall not sublet, sell, transfer, assign, or otherwise dispose of the Contract or any portion thereof, or his right, title, or interest therein, without written consent of the City. 2.2 Pre-construction Meeting: After the Contract has been awarded, the City will schedule a preconstruction meeting to be held before any work is begun to review the construction aspects of the Project. The meeting will be between the City, the Contractor and various utility companies that will be affected by the construction. 2.3 Performance and Payment Bond: The awarded Contractor shall furnish a certified and recorded copy from Sarasota County Clerk’s Office of the Performance and Payment Bond in the amount of 100% of the total project price within ten (10) calendar days after notification of award to the Purchasing Division. The undersigned shall be responsible and bear all costs associated to record Performance and Payment Bond with Sarasota County Clerk's Office. Receipt of said recording and a certified copy of the Bond shall be furnished to the Purchasing Division at the time of the pre-construction meeting. 2.4 Submission of Work Schedule/Order of Completion: At the preconstruction meeting, the successful bidder shall have on hand a working schedule for the Project, showing in detail the order in which the Contractor proposes to perform the work. He/she shall indicate the dates on which major equipment will be delivered and various major items of work will start and the estimated completion dates of the major items. Construction Schedule provides additional information for ongoing scheduling requirements associated with this Contract. 2.5 Submission of Schedule of Values: A Schedule of Values to reflect value of equipment, materials and work performed per unit price, with totals shall be submitted at preconstruction meeting. Both parties are to agree on proposed schedule of values prior to any work being performed. 2.6 Provisions for Convenience of Public: The Contractor shall schedule his/her operations so as minimize any inconvenience to adjacent businesses for residences. Where necessary, the City may require the Contractor to construct first the work in any areas along the Project where restrictions caused by construction operations would represent a more serious handicap, before beginning construction in the less affected areas. 3. CONTROL OF THE WORK AND MATERIALS 3.1 Control of Work: 3.1.1 Plans and Contract Documents: If required for the project, the Contractor will be furnished a universal USB drive with electronically signed/sealed plans for purposes of permitting. 3.1.2 Detail Drawings and Instructions: The City may furnish, with reasonable promptness, additional instructions by means of drawings or otherwise, necessary for the proper execution of the work. All such drawings and instructions shall be consistent with the Contract documents, true developments thereof, and reasonably inferable there from. 3.1.3 Order of Precedence: These documents are integral parts of the Contract, and a requirement occurring on one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for a complete work. In cases of discrepancy, the governing order of documents shall be as follows: 3.1.3.1 Permits from Agencies as required by law 3.1.3.2 Amendments and or Change Orders 3.1.3.3 Contract Documents and Addenda but excluding Construction Plans: 3.1.3.3.1 General Provisions 3.1.3.3.2 Special Provisions 3.1.3.3.3 Technical Specifications 3.1.3.4 Construction Plans 3.1.3.4.1 Dimensions given in figures govern scaled dimensions. 3.1.3.4.2 Detail drawings govern over general drawings. 3.1.3.4.3 Addenda/Change order drawings govern over Contract documents. 3.1.4 Conformity of Work with Plans: All work performed and all materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements, including tolerances, shown on the Plans or indicated in the Technical Specifications or Special Provisions. 3.1.5 Authority of the City: All work shall be done under the supervision of the City or the City’s representative and performed to its satisfaction. It is agreed by the parties hereto that the City shall decide all questions and disputes which may arise relative to the interpretation of the plans, construction, prosecution, and fulfillment of the Contract, and as to the character, quality, amount, and value of any work done, and material furnished, under or by reason of the Contract. 3.1.6 City’s Status: The City and/or the City’s Representative shall examine and inspect the work to assure compliance with the requirements of these Contract Documents. The City and/or the City’s Representative shall determine the quality and acceptability of materials and workmanship relative to the requirements of the Plans and Technical Specifications. The City has the authority to: 3.1.6.1 Stop the work whenever such stoppage may be necessary to insure the proper execution of the Contract. 3.1.6.2 Reject all work that does not conform to the Contract. 3.1.6.3 Resolve questions that arise in the execution of the work. The City’s Representative has the authority to: 3.1.6.4 Reject all work that does not conform to the Contract. 3.1.6.5 Resolve questions that arise in the execution of the work. 3.1.7 Suspension of Work: The City may at any time suspend work by giving ten (10) calendar days’ notice to the Contractor in writing. The City shall reimburse the Contractor for expenses incurred by the Contractor in connection with work under the Contract as a result of such suspension, unless such suspension was caused by actions of the Contractor. However, if the work or any part thereof shall be stopped by a notice in writing aforesaid, and if the City does not give written notice to the Contractor to resume work within thirty (30) calendar days of the date fixed in the written notice to suspend, then the Contractor will be entitled to the estimates and payment for all work done, unless such suspension was caused by actions of the Contractor. 3.1.8 The City’s Right to do Work: If the Contractor should neglect to prosecute the work properly or fail to perform in accordance with the provisions of this Contract, the City, after three days written notice, may without prejudice to any other remedy it may have, make good any deficiencies and deduct from the payment due the Contractor. 3.1.9 The City’s Right to Terminate Contract: If the Contractor refuses or fails to complete the work within the time specified for this Contract, or any extension thereof, the City may terminate the Contractor’s right to proceed. In such event, the City may take over the work and prosecute the same to completion by the Contract or otherwise and the Contractor will be liable for any excess cost occasioned by the City. The City may take possession of and utilize in completing the work such materials and equipment as may be on the site of the work and necessary therefore. If the Contractor should be adjudged bankrupt, or should make a general assignment for the benefit of his/her creditors, or if a receiver should be appointed due to insolvency, or if he/she should refuse or fail, except in cases which a time extension is provided to supply enough workmen, or if he/she should fail to make payment to subcontractors for labor and/or material, or disregard laws, ordinances or the instructions of the City, or be guilty of a violation of a provision of the Contract, then the City may, without prejudice to any other right or remedy and after giving seven (7) calendar days’ notice, terminate employment of the Contractor and possess materials, tools, and appliances thereon and finish work by methods it may deem expedient. Expenses incurred by the City and the damage incurred through the Contractor’s default shall be borne by the Contractor. In any circumstance, the City shall have the right to unilaterally cancel, terminate or suspend this Contract, in whole or in part, by providing the Contractor thirty (30) calendar days written notice by certified mail. In the event of termination, the Contractor shall be entitled to compensation for services rendered and costs incurred through the effective date of termination. All finished or unfinished documents, material, or work shall become the property of the City and shall be delivered to the City without reservation. 3.1.10 City May Stop the Work: If the Work is defective, or the Contractor fails to supply sufficient skilled supervisory personnel or workmen or suitable materials or equipment or the work area is deemed unsafe, the City may order the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of the City to stop the Work shall not give rise to any duty on the part of the City to exercise this right for the benefit of the Contractor or any other party. The City will not award any increase in Contract Price or Contract Time if the Work is stopped due to the circumstances described herein. 3.1.11 City’s Decision: The City shall, within a reasonable time after their presentation, make decisions in writing on claims by the Contractor and on all other matters relating to the execution and progress of the work or the interpretation of the Contract Documents. 3.1.12 Authority and Duties of City’s Inspectors: The City’s Inspectors shall be authorized to inspect all work done and all materials furnished. They shall be authorized to call to the attention of the Contractor any failure of the work or materials to conform to the Technical Specifications and Contract. The presence of the Inspector shall in no way lessen the responsibility of the Contractor. 3.1.13 Inspection of Work: The City and its representative shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide proper facilities for such access and inspection. If the Specifications/Conditions, the City’s instruction, laws, ordinances or any public authority require any work to be specially tested or approved, the Contractor shall give to the City timely notice of its readiness for inspection and, if the inspection is by an authority other than the City, the date fixed for such inspection. Inspections by the City shall be promptly made and, where practicable, at the source of supply. If any work should be covered up without approval or consent of the City, it must, if required by the City, be uncovered for examination at the Contractor’s expense. Re-examination of questioned work may be ordered and the work must be uncovered by the Contractor. 3.1.14 Contractor’s Supervision and Employees: The Contractor shall supervise, inspect, and direct the work completely and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the work in accordance with the Contract Documents. The Contractor shall be solely responsible for the means, methods, techniques, sequence and procedures necessary for the orderly progress of the work, and to maintain all safety precautions and programs incidental thereto. The Contractor shall at all times enforce strict discipline and good order among his/her employees, and shall not employ any unfit person or anyone unskilled in the work assigned to him/her. The Contractor shall be responsible to see that the completed work complies fully with the Contract Documents. The Contractor will employ and maintain on the Work a qualified supervisor or superintendent who shall have been designated in writing by the Contractor as the Contractor’s representative at the site. The supervisor shall have full authority to act on behalf of the Contractor and all communications given to the supervisor shall be as binding as if given to the Contractor. As the work progresses, the Contractor shall keep on the job at all times an English-speaking Supervisor, Superintendent or designee, technically qualified, who is an employee of the Contractor and who shall not be replaced without written notice and approval of the City. The Superintendent or his/her qualified designee shall be present at the job site and direct the work of subcontractors, as well as employees of the Contractor. This supervisor will be equipped with a communication device enabling him/her to contact suppliers, subcontractors or his/her office who in turn can convey necessary communications to others. The Contractor shall issue all communications to the City or his/her representative. The Contractor’s Superintendent shall be present on the job site at all times while work is in progress, and shall be available by phone for emergencies twenty-four hours per day, seven days per week. Failure to observe this requirement shall be considered suspension of the work by the Contractor until such time as such Superintendent is again present on the job. If the Contractor, in the course of the work, finds any discrepancy between the drawing and the physical conditions of the site, or any errors or omissions in drawing, or in the construction layout points and instructions, he/she shall immediately inform the City, in writing, and the City shall promptly verify same. Any work done after such discovery will be done at the Contractor’s risk. Neither party shall employ or hire any employee of the other party without the concurrence of each party. 3.1.15 Contractor’s Understanding: It is understood and agreed that the Contractor has, by careful examination, satisfied himself/herself as to the nature and locations of the work, the conformation of the ground, the character, quality, and quantity of materials to be encountered, the character of equipment and facilities needed prior to and during prosecution of the work under this Contract. No verbal agreement or conversation with any officer, agent, or employee of the City, either before or after execution of this Contract, shall affect or modify the terms or obligations herein contained. 3.1.16 Permits and Regulations: Permits and licenses necessary for the prosecution of the work shall be secured by the Contractor and paid for by the City, unless otherwise specified. The Contractor shall give all notices and comply with all laws, ordinances, rules, and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the specifications and drawings are at variance therewith, he shall promptly notify the City in writing, and any necessary changes shall be adjusted as provided in the Contract for changes in the work. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules, and regulations, and without such notice to the City, he/she shall bear all costs arising there from. 3.1.17 Protection of Work and Property: The Contractor shall continuously maintain protection of all his/her work from damage and shall protect the City’s property from injury or loss arising in connection with this Contract. He/she shall adequately protect adjacent property as provided by law and the Contract Documents. He/she shall provide and maintain all passageways, guard fences, lights, and other facilities for protection required by public authority or local conditions. In an emergency affecting the safety of life or of the work, or of adjoining property, the Contractor, without special instruction or authorization from the City, is hereby permitted to act, at his discretion, to prevent such threatened loss or injury, and he/she shall so act, without appeal, if so instructed or authorized. Any compensation claimed by the Contractor on account of emergency work shall be determined by agreement between the Contractor and the City. The Contractor shall not occupy private land outside of any easements or rights of way unless a written authorization has been signed by the property owner. It shall be the Contractor's responsibility to obtain and provide these agreements prior to construction, if required. Prior to the use of private lands, the Contractor shall submit a copy of the agreement(s) to the City. In the event the Contractor uses private property for any purpose without first having obtained the necessary approvals from the property owner and provided the necessary agreements to the City, the City will direct the Contractor in writing to immediately cease using such property. Prior to application for final payment, the Contractor shall provide documentation from the owner of each piece of private property for which an agreement for use was provided, or for which the City has issued written notification to the Contractor, that each owner is satisfied with the manner in which the Contractor has restored the property. Final payment or reduction in retainage shall not be paid until such documentation is received by the City. 3.1.18 Changes in the Work: The City, without invalidating the Contract, may order extra work or make changes by altering, adding to or deducting from the work, the Contract sum being adjusted accordingly. Such work shall be executed under the conditions of the original Contract. The change and amount of compensation must be agreed upon in writing in a document of equal dignity herewith prior to any deviation from the terms of this Contract. In giving instructions, the City shall have authority to make minor changes in the work, not involving extra cost, and not inconsistent with the purposes of the work. Except in an emergency endangering life or property, no extra work or change shall be made unless in pursuance of a written order by the City; and no claim for an addition to the Contract sum shall be valid, unless ordered. Value of any such extra work or change shall be determined in one or more of the following ways: 3.1.18.1 By estimate and acceptance in a lump sum. 3.1.18.2 By unit prices named in the Contract or subsequently agreed upon. 3.1.18.3 By cost and percentage or by cost and a fixed fee. If none of the previous methods are agreed upon, the Contractor, provided he/she receives an order as above, shall proceed with the work. In such case and also under case, he/she shall keep amendment in such form as the City may direct, a correct amount of the net cost of labor and materials, together with vouchers. The City shall certify to the amount, including reasonable allowance for overhead and profit, due to the Contractor. Pending final determination of value, no payment on changes shall be made. When requiring a change in the scope of services the Contractor shall notify the City by written notice that a change order is requested within five (5) days of any occurrence. 3.1.19 Deductions for Uncorrected Work: If the City deems it inexpedient to correct work injured or done not in accordance with the Contract, some equitable deductions from the Contract price shall be made thereof. 3.1.20 Delays and Extension of Time: If the Contractor should be delayed at any time in the progress of work by any act of negligence by the City or its employees or by any other Contractor employed by the City, or by changes ordered in the work, or by such causes beyond the Contractor’s control, or by delay authorized by the City, or by any cause which the City shall decide to justify the delay, then the time of completion shall be extended for such reasonable time as the City may decide. However, no time delay shall be allowed if judged by the City to be caused by the Contractor’s negligence. No such extension shall be made for delay occurring more than seven (7) calendar days before claim therefore is made in writing to the City. In the case of a continuing cause of delay only one (1) claim is necessary. This article does not exclude the recovery of damages for delay by either party under other provisions in the Contract Documents. 3.1.21 Correction of Work Before Final Payment: All work, materials, whether incorporated in the work or not, all processes of manufacturer, and all methods of construction shall be at all times and places subject to the inspection of the City who shall be the final judge of quality and suitability of the work, materials, processes of manufacture, and methods of construction for the purposes for which they are used. Should they fail to meet City’s approval; they shall be forthwith reconstructed, made good, replaced, and/or corrected, as the case may be, by the Contractor at his/her own expense. Rejected material shall be immediately removed from the site. If, in the opinion of the City, any portion of the work injured or not performed in accordance with the Contract Documents, the compensation to be paid to the Contractor hereunder shall be reduced by such amount as the City, in its judgement, finds to be equitable. 3.1.22 Contractor Right to Stop Work or Cancel Contract: If the work should be stopped under an order of any court or other public authority for a period of three (3) months through no act or fault of the Contractor or of anyone employed by him, or if the City fails to pay the Contractor within thirty (30) calendar days of maturity and presentation of any sum certified by the City, then the Contractor may, upon seven (7) calendar days written notice to the City, stop work and terminate this Contract. 3.1.23 Removal of Equipment: In the case of annulment of this Contract before completion from any cause whatever, the Contractor, if notified to do so by the City, shall promptly remove any part or all of his equipment and supplies from property of the City and/or site of work, failing which the City has the right to remove such equipment and supplies at the Contractor’s expense. 3.1.24 Use of Completed Portions: The City has the right to take possession of and use any completed or partially completed portions of the work, notwithstanding the time for completing the entire work of such portions may not have expired, but taking possession and use shall not be deemed an acceptance of any work not completed in accordance with the Contract Documents. If such prior use increases the cost of or delays the work, the Contractor shall be compensated as the City may determine and the City approves. 3.1.25 Payments Withheld: The City may withhold payment to the Contractor from loss on account of: 3.1.25.1 Defective Work not remedied. 3.1.25.2 Claims filed or evidence indicating probable filing of claims. 3.1.25.3 Failure of the Contractor to make payment properly to Subcontractors or for material/labor. 3.1.25.4 A reasonable doubt that the Contract can be completed for the balance then unpaid. 3.1.25.5 Damage to another Contractor 3.1.25.6 When the above grounds are removed, payment shall be made for amounts withheld because of them. 3.1.26 Damages: Any claim for damage arising under this Contract shall be made in writing to the party liable within a reasonable time of the first observance of such damage and not later than the time of final payment, except as expressly stipulated otherwise in the case of faulty work, and shall be adjusted by agreement. 3.1.27 Assignment: Neither party to the Contract shall assign the Contract or sublet it as a whole without the written consent of the other, nor shall the Contractor assign any monies due or to become due to him/her hereunder without the previous written consent of the City. 3.1.28 Right of Various Interests: Before work being done by the City’s forces or by other Contractor’s forces, contiguous to work covered by this Contract, the respective rights of the various interests involved shall be established by the City before such commencement, to secure the completion of the various portions of the work in general harmony. 3.1.29 Separate Contracts: The City reserves the right to let other Contracts in connection with this work. The Contractor shall afford other Contractors reasonable opportunity for the introduction and storage of their materials and execution of the work, and shall properly connect and coordinate his/her work with theirs. If any part of the Contractor’s work depends on proper execution or results upon the work of any other Contractor, the Contractor shall inspect and promptly report to the City any defects in such work that render it unsuitable for such proper execution and results. His/her failure to so inspect and report shall constitute an acceptance of the other Contractors work as fit and proper for the reception of his work, except as to defects, which may develop on the other Contractor’s, work after execution of his work. 3.1.30 Subcontractors: The Contractor shall provide a list of Subcontractors with his/her proposal for approval. The Contractor shall be fully responsible for all acts and omissions of his Subcontractors and of persons and organizations directly or indirectly employed by them and of persons and organizations for whose acts any of them may be liable to the same extent that he is responsible for the acts and omissions of persons directly employed by him. Nothing in the Contract Documents shall create any contractual relationship between City or City’s Engineer of Record and any Subcontractor or other person or organization having a direct contract with Contractor, nor shall it create any obligation on the part of City or City’s Engineer of Record to pay or to see to the payment of any moneys due any Subcontractor or other person or organization, except as may otherwise be required by law. City or City’s Engineer of Record may furnish to any Subcontractor or other person or organization, to the extent practicable, evidence of amounts paid to Contractor on account of specific Work done in accordance with the schedule of values. Substitutions must be submitted in writing and shall be subject to the approval by the City. To insure proper execution of his/her subsequent work, the Contractor shall measure work already in place and shall at once report to the City any discrepancy between the executed work and the drawings. Acceptance of any such Subcontractor, person or organization shall not constitute a waiver of any right of the City, City’s Representative, or Engineer to reject defective Work, material or equipment; or, Work, material or equipment not in conformance with the requirements of the Contract Documents. The divisions and sections of the Specifications and the identifications of any Drawings shall not control the Contractor in dividing the Work among Subcontractors or delineating the Work to be performed by any specific trade. The Contractor agrees to bind specifically every Subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of the City. All Work performed for the Contractor by a Subcontractor shall be pursuant to an appropriate agreement between the Contractor and the Subcontractor. The Contractor shall be responsible for the coordination of the trades, Subcontractors and materialmen engaged upon his Work. • The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the Work to bind Subcontractors to the Contractor by the terms of these General Conditions and other Contract Documents insofar as applicable to the Work of Subcontractors, and to give the Contractor the same power in regard to terminating any subcontract that the City may exercise over the Contractor under any provisions of the Contract Documents. • The City, City’s Representative, or Engineer will not undertake to settle any differences between the Contractor and his Subcontractors or between Subcontractors. • If in the opinion of the City, City’s Representative, or Engineer, any Subcontractor on the Project proves to be incompetent or otherwise unsatisfactory, he shall be replaced if and when directed in writing. 3.1.31 Horizontal and Vertical Control: Unless noted otherwise in the Contract documents, the Contractor shall be responsible for the layout of all Contract work. The Contractor shall employ or retain any/all professional services that are required by the Contract to complete the work. The Contractor shall carefully preserve benchmarks, reference points and stakes, and, in case of willful or careless destruction, be responsible for any mistakes that may be caused by their unnecessary loss or disturbance. 3.1.32 Lands for Work: The City shall provide the lands upon which the work under this Contract is to be done, except that the Contractors shall provide land required for the erection of temporary construction facilities and storage of material, together with the right of access to same. 3.1.33 Cleaning Up: The Contractor shall, at such times as may be required by the City, remove from the City’s property and from all public and private property, at his/her own expense, all temporary structures, used materials and equipment, rubbish and waste materials resulting from his/her operations. All damaged areas will be restored by the Contractor to their original conditions and approved by the City. By submission of a bid, the Contractor assumes full responsibility for the associated expenses. There shall not be an increase in time or price associated with such removal, and payment to Contractor may be withheld until such work is completed. 3.1.34 Guarantee: The Contractor shall warrant all equipment furnished and work performed by him/her for a period of one (1) year from the date of written acceptance of the work, final completion by the City or as may be otherwise specified. Any faulty work or equipment will be fully corrected at no cost to the City and restored work will be warranted for one year from the date of acceptance, or as may be otherwise specified. This will not release additional warranties required by other sections or provided by individual suppliers. The making and acceptance of final payment shall not waive any claim for faulty work appearing after final payment or for failure to adhere strictly to the Contract documents. If any part of the project is guaranteed for a longer period, such longer period shall prevail. Except as otherwise specified, all work shall be guaranteed by the Contractor against defects resulting from use of inferior materials, equipment or workmanship for one (1) year from the date of completion or written acceptance by the City, whichever is later. 3.1.35 Responsibility Regarding Existing Utilities and Structures: The existence and location of underground utilities indicated on the plans are not guaranteed and shall be investigated and verified in the field by the Contractor before submitting a bid. Excavation in the vicinity of existing structures and utilities shall be done by hand. The Contractor shall be responsible for any damage to, and for maintenance and protection of, existing utilities and structures from any damage resulting from said excavation. 3.1.36 Accidents: The Contractor shall provide equipment and medical facilities as necessary to supply first aid to anyone who is injured in connection with the work. The Contractor must promptly report in writing to the City accidents arising out of, or in conjunction with the performance of the work, whether in, or adjacent to, the site, which causes death, personal injury, or property damages, giving full details and statements of witnesses. If death or serious injuries or serious damages are caused, the accident shall be reported immediately by telephone or messenger to the City. If a claim is made by anyone against the Contractor or Subcontractor on account of an accident, the Contractor shall promptly report the facts in writing to the City, giving full details of the claim. 3.1.37 Stage Plans: Stage plans of structural alterations, cofferdams, dredging, furnished or approved by the City, shall be adhered to unless objected to in writing by the Contractor, but the submission or approval of stage plans by the City shall not relieve the Contractor of full responsibility for the work. 3.1.38 Measurement of Quantities: The quantities of work performed will be computed by the City on the basis of measurement taken by the City or its assistants, and these measurements shall be final and binding. All work computed under the Contract shall be measured by the City according to the United States Standard Measurement and Weights. The City does not assume any responsibility that the final quantities will remain in accord with estimated quantities, nor shall the Contractor claim misunderstanding or deception because of such estimate of quantities. The estimated quantities of work to be done and material to be provided may be increased, decreased, or omitted, as provided herein. Any increase in quantities shall be approved by the City prior to any work. 3.1.39 Reference to Other Specifications: Where reference is made to specifications such as ASTM, AWWA or AASHTO, the latest edition shall be used. 3.1.40 Sanitary Facilities: The Contractor shall provide and maintain, in a sanitary condition, facilities for his/her employees as are required by local and state boards of health. 3.1.41 Quality of Equipment and Materials: To establish standards of quality, the City may, in the specifications, refer to products by name and/or catalog number. This procedure is not to be construed as eliminating from competition other products of equal quality by other manufacturers where fully suitable in design. 3.1.41.1 The Contractor shall furnish a complete list of proposed desired substitutions prior to signing of the Contract together with such engineering and catalog data as the City may require. 3.1.41.2 The Contractor shall abide by the City’s judgment when proposed substitute items of equipment are judged unacceptable and shall furnish the specified item of equipment in such case. All proposals for substitutions shall be submitted in writing by the General Contractor. The City will approve or disapprove proposed substitutions in writing within a reasonable time. 3.1.42 Codes and Laws: The successful bidder shall comply with all Federal, State, Local Laws and Ordinances that affect the Contract in any way. 3.1.43 Traffic Control: The Contractor shall comply with the National Committee on Uniform Traffic Control and Devices (NCUTCD) standards established by the Federal Highway Commission and the FY2026 (or most current) FDOT Standards for Traffic Control Through Work Zones and maintain safe conditions at all times. 3.1.44 Exploration and Reports: If reference is made to identification of reports of explorations and tests of subsurface, or other project specific, conditions at the site that have been used in preparing the Contract documents, it should be understood that these reports are not part of the Contract documents. The Contractor shall have full responsibility with respect to subsurface, or other project specific, conditions at the site. Technical data, made available only at the Contractor’s request, may not be sufficient for construction purposes. Additional investigations may be necessary for the purposes of carrying out the construction project. If the Contractor desires additional subsurface, or other applicable project specific, investigation, it will be done at his/her expense, prior to bidding. Limited Subsurface, or other project specific, reports for this project are available through NPU. If the Contractor has elected not to make subsurface, or other project specific, investigation prior to bidding, he/she shall not be entitled to any extra compensation or Contract change orders due to conditions encountered. 3.1.45 Existing Structures: Drawing of physical conditions in or relating to existing surface and subsurface structures which are at or contiguous to the site that have been utilized by the consultant and/or the City in preparation of the Contract documents. The Contractor may rely upon the accuracy of the technical data contained in such drawing but not for the completeness thereof for the purpose of preparing or submitting a bid. Except as previously indicated, the Contractor shall have full responsibility with respect to physical conditions in or relating to such structures. 3.1.46 Report of Differing Conditions: If the Contractor believes that any technical data on which he/she relies is inaccurate, or if any physical conditions uncovered or revealed at the site differ materially from that indicated, reflected, or referred to in the Contract documents, the Contractor shall promptly, after becoming aware and before performing any work in connection therewith (except in emergency situations), notify the City in writing about the inaccuracy of difference. The City will promptly review the pertinent conditions, determine the necessity of obtaining additional explorations or tests with respect thereto and advise the City in writing (with a copy to the Contractor) of the City’s findings and conclusion. Contractor’s cost of, or the time required for, performance of any part of the work under this contract, whether or not changed as a result of such conditions, an equitable adjustment shall be made and the contract modified in writing accordingly. No claim of the Contractor under this clause shall be allowed unless the Contractor has given the notice required; provided, however, the time prescribed therefore may be extended by the City. No claim by the Contractor for an equitable adjustment hereunder shall be allowed if asserted after final payment under this Contract. 3.1.47 Not Shown or Indicated: If an underground facility is uncovered or revealed at or contiguous to the site, which was not shown or indicated and of which the Contractor could not reasonably have been expected to be aware, the Contractor shall promptly, before performing any work (except in emergencies), identify the owner of such underground facility and give written notice thereof to that owner and to the City. The Contractor will review the underground facility to determine the extent to which the documents should be modified to reflect and substantiate the consequences of the existence of the underground facility. With City approval, the Contract documents will be amended or supplemented to the extent necessary. During such time, the Contractor shall be responsible for the safety and protection of such underground facility. The Contractor shall be allowed an increase or an extension of time, or both, to the extent that they are attributable. 3.1.48 Progress Meeting: Progress meetings will be conducted bi-weekly or as required if requested by Contractor or the City. 3.2 Storage of Materials 3.2.1 Contractor shall, at its expense, receive, unload, store in a secure place, and deliver from storage to the construction site all materials and equipment required for the performance of the Contract. 3.2.2 Contractor is not entitled to payment for same except for those materials which in City’s discretion are properly stored and are going to be installed or incorporated into the construction of the Project within thirty (30) days of delivery to the construction site. 3.2.3 The storage facilities and methods of storing shall meet City’s approval and shall be in accordance with manufacturer's recommendations, or City will not be obligated to pay for same. 3.2.4 Materials and equipment subject to degradation by outside exposure shall be stored in a weather tight enclosure provided by Contractor at its expense. 3.2.5 City may at its discretion require material to be stored in an air-conditioned location. 3.2.6 Provided the above conditions are met, the stored materials may be included in a subsequent Application for Payment if the Contractor also complies with the following: 3.2.6.1 An applicable purchase order is provided listing the materials in detail and identifying the Contract Documents, by name, with verification that the total value of the purchase order amount reconciles with the corresponding application for payment stored materials line item value. 3.2.6.2 Evidence that proper storage security is provided. 3.2.6.3 The City is provided legal title (free of liens or encumbrances of any kind) to the material that is stored or stockpiled. 3.2.6.4 The Contractor and/or its Subcontractor have provided insurance for the Stored Materials against loss, damage (from whatever source), or disappearance, including loss or theft prior to incorporation into the Work. By execution of the Contract, Contractor releases City from any responsibility for Stored Materials and assumes all liability for and risk of loss or damage, by whatever means, including City’s alleged negligence, regardless of whether the City has paid for said Stored Materials. 3.2.7 Once any Stored Material is paid for by City, it shall not be removed from the designated storage area except for incorporation into the Work or upon subsequent written approval by City. 3.2.8 No Applications for Payment shall be submitted, nor payments made based on the value of materials stored at locations other than the Project, unless otherwise approved in writing by the City. 3.2.9 It is further agreed between the parties that the transfer of title and the City’s payment for any Stored Material pursuant to the Contract Documents shall in no way relieve the Contractor of the responsibility for providing and installing such material in accordance with the requirements of the Contract Documents. 3.2.10 The Contractor warrants that title to all of the Work or Stored Materials covered by the Application for Payment will pass to the City either by incorporation in the Project or upon receipt of payment by the Contractor, whichever occurs first, free and clear of all liens, claims, security, interest or encumbrance; and that none of the Work and none of the Stored Materials covered by the Application for Payments will have been acquired by the Contractor, or by any other person performing the Work at the site or providing materials and equipment to the Project, subject to an agreement under which an interest therein or encumbrance thereon is retained by the seller or otherwise imposed by the Contractor or such person. 3.2.11 In the event stored materials which City is paying for in advance of their being installed or incorporated into the Project pursuant to this Paragraph are not installed or incorporated into the Project within thirty (30) days of when they are delivered to the site, Contractor shall not be entitled to payment for any future stored materials on this Project and the amounts previously approved for payment for said materials shall be deducted from the Contractor’s next application for payment. ## Details **Bid Opening Date:** 2026-06-04T14:00:00 **Fiscal Year:** 2026 **Solicitation Number:** RFB-2026-19-0-2026/GT **Bid Number:** 2026-19 **Bid Type:** RFB - Request for Bid **Document Distribution Method:** Download **Document Distribution Notes:** None **Distribution Options:** Bid has no blueprints associated with it **Electronic Bidding:** Yes **County:** Sarasota County **Planholders:** 22 ## Publications - Sarasota Herald-Tribune

    Key dates

    1. May 5, 2026Published
    2. June 4, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.