SLED Opportunity · CALIFORNIA · CITY OF SANTA ROSA
AI Summary
City of Santa Rosa seeks proposals to update its 2025 Water Master Plan, focusing on water system reliability, infrastructure improvements, and operational tools for water and recycled water systems.
In 2022, the City of Santa Rosa approved and adopted the 2020 Water Master Plan Update: Water System Reliability Study, prepared by Black & Veatch. This update addressed factors that impacted the City’s water system during the 2017 Tubbs Fire by evaluating:A. SCADA system reliability and redundancy to eliminate interruptions of telemetry data transmission of water system information to operators,B. Flow control opportunities where immediate access to critical facilities is restricted due to safety concerns,C. Fire flow pipeline and facility improvements to mitigate existing pipeline deficiencies, andD. Reliability improvement opportunities in pump stations, reservoirs, and between pressure zones.Since 2022, the City of Santa Rosa has created and is implementing several CIP projects to address recommendations made by the consultant is the 2020 Water MPU. The City would like to update the Water Master Plan and further develop the tools needed to assist in planning, operating, and maintaining the City’s water and recycled water systems and infrastructure. Pre-Bid Meeting Information: No Online Q&A: No Location Information: Department: Transportation and Public Works Address: 69 Stony CircleSanta rosa, California95401 County: Sonoma
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.