SLED Opportunity · CALIFORNIA · CITRUS HEIGHTS

    RFP for Old Auburn Road Complete Streets Project (Phase 1)

    Issued by Citrus Heights
    cityRFPCitrus HeightsSol. 148
    Closed
    STATUS
    Closed
    due Mar 4, 2022
    PUBLISHED
    Feb 1, 2022
    Posting date
    JURISDICTION
    Citrus Heights
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    City of Citrus Heights requests proposals for professional services to design Phase 1 of the Old Auburn Road Complete Streets Project, funded by a federal ATP grant. Proposals due March 3, 2022, with interviews tentatively on March 17, 2022.

    Opportunity details

    Solicitation No.
    148
    Type / RFx
    RFP
    Status
    Closed
    Level
    city
    Published Date
    February 1, 2022
    Due Date
    March 4, 2022
    NAICS Code
    237310AI guide
    Jurisdiction
    Citrus Heights
    Agency
    Citrus Heights

    Description

    The City of Citrus Heights is soliciting proposals from qualified firms to provide professional services for the Old Auburn Road Complete Streets Project (Phase 1). This project is funded by a federal Active Transportation (ATP) grant administered through Caltrans Office of Local Assistance. The Project is the first phase to transform Old Auburn Road to a complete street from Tiara Way (west of Sunrise Boulevard) to Garry Oak Drive (east of Fair Oaks Boulevard). A conceptual plan for the Project is incorporated into the Old Auburn Complete Streets Plan, which is available on the city’s website (http://www.citrusheights.net/942/Old-Auburn-Rd-Complete-Streets-Plan). There is no Pre-Proposal Meeting for this RFP. Questions regarding this RFP shall be submitted in writing, by email only, to the General Services Department and must be received no later than 4:00 PM, February 24, 2022. Inquiries submitted via email shall be clearly marked on the subject line “Old Auburn Road Complete Streets Project (Phase 1) - Question” and emailed to: generalservices@citrusheights.net AND LBlomquist@citrusheights.net Proposal Due 4:00 PM PST, Thursday, March 3, 2022. Proposer’s submittal shall be as follows: A maximum of fifteen (15) sheets of paper with printing on both sides (double-sided) totaling thirty (30) pages of information, inclusive of the cover letter, resumes, graphics, etc. Required Local Assistance paperwork does not count toward the page limit. One (1) electronic (Adobe PDF) on a memory stick and three (3) bound copies. Proposal must be received (not postmarked) and date stamped by a designated city employee no later than 4:00 PM PST, March 3, 2022. Proposals shall be marked: “Proposal for Old Auburn Road Complete Streets Project (Phase 1)” All proposals, including fee proposals, shall be delivered/mailed to: City of Citrus Heights General Services Department 6360 Fountain Square Drive Citrus Heights, CA 95621 Attention: Leslie Blomquist Consultant interviews are tentatively scheduled for 9 AM to Noon, March 17, 2022. Links: http://www.citrusheights.net/942/Old-Auburn-Rd-Complete-Streets-Plan (http://www.citrusheights.net/942/Old-Auburn-Rd-Complete-Streets-Plan)

    Key dates

    1. February 1, 2022Published
    2. March 4, 2022Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.