Active SLED Opportunity · FLORIDA · FLORIDA

    RFQ 2026-03 Construction Manager at Risk for TSC Site 2 Gadsden Service Center

    Issued by Tallahassee State College
    stateRFQfloridaSol. RFSQ-16608
    Open · 42d remaining
    DAYS TO CLOSE
    42
    due Sep 16, 2026
    PUBLISHED
    Aug 4, 2026
    Posting date
    JURISDICTION
    florida
    state
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Tallahassee State College seeks a licensed Florida General Contractor for Construction Manager at Risk services to construct a new educational building at the Gadsden Service Center. The project includes preconstruction and construction phases, with a budget of $10.6M and completion expected by 2028-2029. Services include warranty management, cost estimating, scheduling, and compliance with building codes.

    Opportunity details

    Solicitation No.
    RFSQ-16608
    Type / RFx
    RFQ
    Status
    OPEN
    Level
    state
    Published Date
    August 4, 2026
    Due Date
    September 16, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    florida
    State
    florida
    Agency
    Tallahassee State College

    Description

    SCOPE OF SERVICES SOUGHT

    Statement of Purpose and Qualifications
    The purpose of this CMAR selection process is to identify the Construction Management at Risk team that can best achieve and is generally responsible for the successful, timely, and economical completion of construction for a new educational Building Number 04, located at the Tallahassee State College’s, Site 2 Campus - Gadsden Service Center (GSC).

    The College is requesting Statement of Qualifications (SOQ’s) from General Contractors who wish to provide submittals for Construction Manager at Risk services for the complete construction of Tallahassee State College Site 2, Gadsden Service Center, New Building No. 04, whose physical address is 223 Pat Thomas Pkwy, Quincy, FL. 32351. 

     

    The firm must be a licensed general contractor in the State of Florida and meet all other requirements as may be required by law and this RFQ. Minimum required components of service for assigned projects will include the following: 

    • • Warranty management 
    • • Collaboration with the Architect and TSC Facilities Department 
    • • Options Analysis, cost estimating, scheduling 
    • • Preparation of a Guaranteed Maximum Price 
    • • Providing a Performance, Labor, and Materials Bond 
    • • Construction management and site supervision 
    • • Reporting and documentation of subcontractor’s licenses and costs with each pay application 
    • • Firm selected must have the manpower to mobilize quickly and complete 
    • awarded project on an accelerated schedule. 

    The Construction Manger shall provide all Preconstruction Phase Services necessary to establish a GMP as well as all Construction Phase Services following Award of the GMP. The Construction Manger shall provide services to incorporate and all requirements set forth in the Permitted Construction Documents and abide by the Florida Building Code, Florida Administrative Code, Florida Fire Prevention Code, the National Electrical Code and any other applicable codes related to project. The CMAR must be a Certified General Contractor in the State of Florida and contract only with licensed or registered professionals for the specific fields or areas of construction to be performed, as required by law.

     

    Background and Overview

    The complete structure of the building will house one floor with a total of approximately 11,434 gross square feet (GSF). The space would specifically include,  (4) Classrooms at 1,300 net square feet (NSF) each, (1) Teaching Lab at 2,000 NSF, (1) general Office at 350 NSF and 500 NSF of appropriate Support Service space. The total budget for the complete design, construction and furnishing of this new building is approximately $10,600,000.00 and is being funded by State appropriations and local college funds.

     

    The new building will: (a) support new classrooms and laboratories to increase the number of students obtaining GED credentials (b) expand the number of healthcare programs and participants culminating in successful completion of an industry certification; (c) expand the successful HVAC program to meet student demand. This new building will replicate a successful program for students with intellectual disabilities to obtain employment credentials and all programs will provide employment and economic mobility for residents of Gadsden County. Lastly, the building must support the educational mission of the College and offered programs, effectively incorporating appropriate educational technology while also demonstrating principles of energy efficiency and sustainability where applicable. 

     

    Term of Contract
    It is anticipated that Construction Manager at Risk services shall commence upon Board approved award of this RFQ and execution of resulting Contract, through final completion of the building and project which is anticipated for 2028-2029.

    Key dates

    1. August 4, 2026Published
    2. September 16, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.