SLED Opportunity · CALIFORNIA · IMPERIAL COUNTY

    RFQ - Imperial County Department of Public Works Office Upgrades

    Issued by Imperial County
    countyRFQImperial CountySol. RFQ 26-0079
    Closed
    STATUS
    Closed
    due Mar 24, 2026
    PUBLISHED
    Mar 4, 2026
    Posting date
    JURISDICTION
    Imperial County
    county
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Imperial County seeks quotations for office upgrades at its Information & Technology Services location in El Centro, CA. The project includes demolition, construction, electrical work, soundproofing, flooring, painting, and installation of acoustic panels. Completion is required within 22 working days post-award.

    Opportunity details

    Solicitation No.
    RFQ 26-0079
    Type / RFx
    RFQ
    Status
    Bidding
    Level
    county
    Published Date
    March 4, 2026
    Due Date
    March 24, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    Imperial County
    Agency
    Imperial County

    Description

    PURPOSE AND BACKGROUND:The Imperial County Department of Public Works is requesting quotations for the Information & Technology Services Office Upgrades located at 940 Main Street Suite 201, El Centro, California 92243.SCOPE OF WORK:The scope of work is for the construction services required for the Imperial County Information & Technology Services Office Upgrades consist of but not limit to:Demolition:•Tear up existing roll carpet and wall base. (ExistingVCT flooring underneath the carpet to remain.•Demolition of sheetrock at office 1 and the north side wall at office 2.•Removal of the existing windows at office 1 and office 2.•Demolition of the existing front counter.•Demolition of the existing door and frame at office 2.•Removal of the existing old HVAC thermostats.Construction:•Install new soundproof insulation (Rockwool safe & Sound or approved equal or better).•Install new 5 / 8” type x sheetrock.•Patch and texture to match existing. Paint walls with semi-gloss interior paint by Farrow & Ball, color:Hague Blue No. 30 or approved equal or better (1,728 sf. Approx.).•Prep floor as needed and install new sound control underlayment and Vinyl Planks flooring to matchthe back room (1,140 sf Approx.).•Install new 4” wall base (250 LF Approx.).•Install new rubber transitions to match wall base color.•Install new HVAC Thermostats.•Erect a new wall with 20 ga. Metal studs 16 O.C. and 5/8” sheetrock and soundproof insulation(Rockwool Safe & Sound or approved equal or better).•Install a new 3-0 x 6-8 x 1 ¾ SC wood door with Brown-tone Timely frame.•Paint doors with semi-gloss water base paint. Color TBD.•Install new vertical wood acoustic panels (Slatpanel Premium Walnut Acoustic Panels or approved equalor better).Electrical:•Install a new 20-amp duplex receptacle.•Install a new 2x4 electrical box with ¾” conduit from above the ceiling grit for data drops (Cabling willbe installed by ITS).•Install new receptacles and light switches in the entire office (white color).•Replace all existing light fixtures with new LED fixtures. Note: Replace the emergency battery operatedfixtures accordingly.•Remove the existing light switches located outside office 1 and tie the lights to the entrance lightswitch. Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Purchasing Address: 940 Main St. Suite 201, El Centro, CA 92243 County: Imperial License Requirements: California Contractor’s License Class B Other Details: Additive #1:•Demolition of the existing Ceiling Grit System and installation of a new Ceiling Grit System aligned tothe north side of the room. (See plans and specs for details). Relocate light fixtures and AC grills asneeded.Additive #2:•Paint walls with interior semi-gloss Parrow & Hall paint, color: Hague Blue No. 30 or approved equal orbetter.(See the Plans and Specifications for References at Exhibit “K”)The project will need to be completed within ten (22) working days after the award of theproject.Scope of Work is to provide all labor, materials, equipment, and perform all operations asrequired work, as indicated in construction documents, specified herein, or reasonablyrequired to complete the work. County Project No.SR7327IS.The CONTRACTOR shall perform the work as herein defined, and shall provide all labor,materials, tools, utility services and transportation to complete in a workman like manner all the work required in connection with the following titled project:Information & Technology Services Office Upgrades940 Main St. Suite 201, El Centro, CACounty Project No. SR7327ISIn addition, to all other conditions and requirements, CONTRACTOR agrees to execute and comply with the requirements and conditions set forth in the attached Exhibits “A” through “K”.

    Key dates

    1. March 4, 2026Published
    2. March 24, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.